Bidder Selection Plan

Component Project No. 10: Weak rehabilitation of the dike system of Nghe An province in the period of 2021-2025 Under the Project: Project of weak rehabilitation of the dike system in the period of 2021-2025

  Watching      

Warning: DauThau.info have found this plan for contractor selection violates the form of bidding as stipulated in Article 37 of Circular No. 08/2022/TT-BKHĐT, specifically: The total number of bidding packages or the total value of online bidding packages is lower than required.

-- You will be rewarded if you detect false warnings! See instructions here!

Find: 15:49 24/09/2022
Contractor Selection Plan ID
PL2200005708-00
Publishing time
15:48 24/09/2022
Posting Status
Published
Contractor selection plan name
Component Project No. 10: Weak rehabilitation of the dike system of Nghe An province in the period of 2021-2025 Under the Project: Project of weak rehabilitation of the dike system in the period of 2021-2025
Investment objective
Upgrading the dyke, handling the key points on the dyke to ensure the required capacity to resist floods and storms, combine traffic, and contribute to socio-economic development.
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2200000082-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
2 Years
Location
Authority that issues the decision
Bộ Nông nghiệp và phát triển Nông thôn
Approval date
07/09/2022
Approval ID
3389/QĐ-BNN-PCTT ngày 7/9/2022
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Publication date (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 11
1.Package 08: Construction supervision
Tender/ Prequalification Notice ID
Contract execution period
360 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital is managed by the Ministry of Agriculture and Rural Development
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
2.Package 07: Prepare bidding documents, evaluate bids for supervision bidding package
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital is managed by the Ministry of Agriculture and Rural Development
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
3.Tender package No 01: Setting up the survey task for the construction drawing design phase
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital is managed by the Ministry of Agriculture and Rural Development
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2022
Type of contract
All in One
Prequalification
No
Location
4.Bidding package No. 05: Prepare bidding documents, evaluate bids for consulting bidding packages
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital is managed by the Ministry of Agriculture and Rural Development
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
5.Package 06: Prepare bidding documents, evaluate bids for construction and installation bidding packages
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital is managed by the Ministry of Agriculture and Rural Development
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
6.Package 10: Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
360 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital is managed by the Ministry of Agriculture and Rural Development
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
7.Package 11: Construction (including traffic safety costs)
Tender/ Prequalification Notice ID
Contract execution period
360 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital is managed by the Ministry of Agriculture and Rural Development
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
8.Package 02: Surveying topography, geology, making construction drawings design - cost estimate
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital is managed by the Ministry of Agriculture and Rural Development
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
Đô Lương District, Nghệ An
9.Tender package No 09: Audit
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital is managed by the Ministry of Agriculture and Rural Development
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
10.Package 03: Supervising and surveying the construction drawing design phase
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital is managed by the Ministry of Agriculture and Rural Development
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
11.Package 04: Verification of construction drawing design - cost estimate
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital is managed by the Ministry of Agriculture and Rural Development
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Component Project No. 10: Weak rehabilitation of the dike system of Nghe An province in the period of 2021-2025 Under the Project: Project of weak rehabilitation of the dike system in the period of 2021-2025". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Component Project No. 10: Weak rehabilitation of the dike system of Nghe An province in the period of 2021-2025 Under the Project: Project of weak rehabilitation of the dike system in the period of 2021-2025" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 24

Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8363 Projects are waiting for contractors
  • 1156 Tender notices posted in the last 24 hours
  • 1870 Contractor selection plan posted in the last 24 hours
  • 24377 Tender notices posted in the past month
  • 38636 Contractor selection plan posted in the last month
Consultants are supporting you
You are not logged in.
To view information, please Login or Register if you do not have an account.
Signing up is simple and completely free.
You did not use the site, Click here to remain logged. Timeout: 60 second