Bidder Selection Plan

Contractor selection plan for phase 2 of project: Mong Cai 220kV transformer station

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 14:48 25/11/2025
Contractor Selection Plan ID
PL2500309056-00
Publishing time
14:41 25/11/2025
Posting Status
Published
Contractor selection plan name
Contractor selection plan for phase 2 of project: Mong Cai 220kV transformer station
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500071189-00
Spending Category
Investment and Development Spending
Authority that issues the decision
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA
Approval date
24/11/2025
Approval ID
2319/QĐ-EVNNPT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 2
1.Bidding package No. 6: Providing construction survey consulting services, preparing construction accounts to be deployed after the basic design, financial design, environmental documents and specialized reports and agreements; cost of building information modeling (BIM) application; Measure, draw, and edit cadastral maps, carry out procedures for land recovery, land allocation, and land lease.
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
+ Construction survey + Establishment of technical design and financial design; HSMT + Establish information security levels + Prepare environmental registration reports + Apply information modeling (BIM) in the design phase + Measure, draw, adjust cadastral maps, carry out procedures for land recovery, land allocation, and land lease
Capital source details
Loans and capital from EVNNPT
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
November 2025
Type of contract
Package and Fixed Price
Prequalification
No
Implementation location (After merge)
2.Tender package No 7: Providing consulting services for verifying construction plans implemented after the basic design, construction estimates and survey supervision of the construction design phase deployed after the basic design
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
+ Verification of technical design - DT + Survey supervision
Capital source details
Loans and capital from EVNNPT
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
November 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan for phase 2 of project: Mong Cai 220kV transformer station". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan for phase 2 of project: Mong Cai 220kV transformer station" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 3

You did not use the site, Click here to remain logged. Timeout: 60 second