Bidder Selection Plan

contractor selection plan for the project implementation phase (first time) under the project of solidifying drainage canals in the section from Km6+692 to Km8+592 on the T0 canal line and the section from Km0+108 to Km1+077 on the T2 route of Nuoc Trong stream, Long Thanh District.

  Watching      
Find: 09:29 18/11/2025
Contractor Selection Plan ID
PL2500297205-01
Publishing time
09:24 18/11/2025
Posting Status
Published
Contractor selection plan name
contractor selection plan for the project implementation phase (first time) under the project of solidifying drainage canals in the section from Km6+692 to Km8+592 on the T0 canal line and the section from Km0+108 to Km1+077 on the T2 route of Nuoc Trong stream, Long Thanh District.
Investment objective
Investment in solidifying drainage canals from section Km6+692 to Km8+592, canal line T0 and section from route Km0+108 to Km1+077, line T2, Nuoc Trong stream, Long Thanh district to ensure drainage for the basin of about 68,881 km2 (6,888.1 ha), synchronously connecting and maximizing the effectiveness of canal routes that have been solidly invested in phase 1, Prevents landslides on both sides (currently an earthen canal), contributing to creating landscape and improving the living environment for people in the area
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500060261-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
4 Years
Authority that issues the decision
Ban Quản lý dự án đầu tư xây dựng tỉnh Đồng Nai
Approval date
17/11/2025
Approval ID
436/QĐ-BQLDAĐTXD
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 7
1.Bidding package No. 05 (consulting): Topographic survey, construction drawing design step
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Terrain survey, construction drawing design steps
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
2.Tender package No 06 (consulting): Geological survey for construction drawing design step
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Geological survey steps to design construction drawings
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
3.Bidding package No. 07 (consulting): Prepare construction drawing design documents - construction estimates
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare construction drawing design documents - construction estimates
Capital source details
Provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
4.Bidding package No. 08 (consulting): construction survey supervision and construction drawing design stage
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervision of construction survey and construction stage of construction drawing
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
5.Bidding package No. 09 (consulting): Preparation of bidding documents, evaluation of bidding documents for construction drawing design bidding package No. 06 (consulting): Preparation of construction drawing design documents - construction estimates
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare bidding documents, evaluate bidding documents for construction drawing design bidding package No. 06 (consulting): Prepare construction drawing design documents - construction estimates
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
6.Bidding package No. 10 (consulting): Appraisal of bidding documents, contractor selection results Bidding package No. 06 (consulting): Preparation of construction drawing design documents - construction estimates
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Appraisal of bidding documents, contractor selection results for bidding package No. 06 (consulting): Preparation of construction drawing design documents - construction estimates
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
7.Bidding package No. 11 (consulting): Verification of construction drawing design - construction estimate
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verify construction drawing designs and construction estimates
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "contractor selection plan for the project implementation phase (first time) under the project of solidifying drainage canals in the section from Km6+692 to Km8+592 on the T0 canal line and the section from Km0+108 to Km1+077 on the T2 route of Nuoc Trong stream, Long Thanh District.". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "contractor selection plan for the project implementation phase (first time) under the project of solidifying drainage canals in the section from Km6+692 to Km8+592 on the T0 canal line and the section from Km0+108 to Km1+077 on the T2 route of Nuoc Trong stream, Long Thanh District." plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 6

You did not use the site, Click here to remain logged. Timeout: 60 second