contractor selection plan for the project implementation phase (first time) under the project of solidifying drainage canals in the section from Km6+692 to Km8+592 on the T0 canal line and the section from Km0+108 to Km1+077 on the T2 route of Nuoc Trong stream, Long Thanh District.
contractor selection plan for the project implementation phase (first time) under the project of solidifying drainage canals in the section from Km6+692 to Km8+592 on the T0 canal line and the section from Km0+108 to Km1+077 on the T2 route of Nuoc Trong stream, Long Thanh District.
Investment in solidifying drainage canals from section Km6+692 to Km8+592, canal line T0 and section from route Km0+108 to Km1+077, line T2, Nuoc Trong stream, Long Thanh district to ensure drainage for the basin of about 68,881 km2 (6,888.1 ha), synchronously connecting and maximizing the effectiveness of canal routes that have been solidly invested in phase 1, Prevents landslides on both sides (currently an earthen canal), contributing to creating landscape and improving the living environment for people in the area
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
436-QĐ.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements
- Change:Publication date, Bidding package information (View changes)
- Change:Publication date, Bidding package information (View changes)
5.Bidding package No. 09 (consulting): Preparation of bidding documents, evaluation of bidding documents for construction drawing design bidding package No. 06 (consulting): Preparation of construction drawing design documents - construction estimates
Appraisal of bidding documents, contractor selection results for bidding package No. 07 (consulting): Preparation of construction drawing design documents - construction estimates
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "contractor selection plan for the project implementation phase (first time) under the project of solidifying drainage canals in the section from Km6+692 to Km8+592 on the T0 canal line and the section from Km0+108 to Km1+077 on the T2 route of Nuoc Trong stream, Long Thanh District.". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "contractor selection plan for the project implementation phase (first time) under the project of solidifying drainage canals in the section from Km6+692 to Km8+592 on the T0 canal line and the section from Km0+108 to Km1+077 on the T2 route of Nuoc Trong stream, Long Thanh District." plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.