Bidder Selection Plan

Contractor selection plan (phase 2); Project: Equipping lightning protection valves for feeder compartments with voltage levels of 110kV and below at 220kV and 500kV substations managed by Power Transmission Company 2

  Watching      
Find: 08:34 08/01/2026
Contractor Selection Plan ID
PL2500301806-02
Publishing time
08:33 08/01/2026
Posting Status
Published
Contractor selection plan name
Contractor selection plan (phase 2); Project: Equipping lightning protection valves for feeder compartments with voltage levels of 110kV and below at 220kV and 500kV substations managed by Power Transmission Company 2
Investment objective
Prevent overvoltage caused by lightning strikes on lines with voltage levels of 110 kV or less from spreading into the station, causing grid failures and equipment damage in transformer stations. Meets technical requirements for unmanned transformer stations, ensuring safe operation and improving power supply reliability.
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500061296-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
8 Month
Authority that issues the decision
Công ty Truyền tải điện 2
Approval date
19/11/2025
Approval ID
2969/QĐ-PTC2
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Publication date, Bidding package information (View changes)

- Change: Investor, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 5
1.Tender package No 3: Providing the first 22kV VTTB including installation services and construction insurance
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
1. 22kV CSV supply: 21 sets 2. Construction, installation and project insurance
Capital source details
Own capital of EVNNPT
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.Tender package No 4: Providing the first 110kV VTTB including installation, construction and construction insurance services
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Uncategoried
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
1. Supply of 110kV CSV: 186 sets 2. Construction, installation and project insurance
Capital source details
Own capital of EVNNPT
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
3.Tender package No 5: Construction supervision consultancy
Tender/ Prequalification Notice ID
Contract execution period
95 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on construction supervision and installation of equipment into the project
Capital source details
Own capital of EVNNPT
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
4.Tender package No 6: Construction audit consulting
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Audit of completed project settlement reports
Capital source details
Own capital of EVNNPT
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
5.Tender package No 7: Testing and inspection
Tender/ Prequalification Notice ID
Contract execution period
95 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
VTTB testing and verification
Capital source details
Own capital of EVNNPT
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Month 0, 0
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan (phase 2); Project: Equipping lightning protection valves for feeder compartments with voltage levels of 110kV and below at 220kV and 500kV substations managed by Power Transmission Company 2". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan (phase 2); Project: Equipping lightning protection valves for feeder compartments with voltage levels of 110kV and below at 220kV and 500kV substations managed by Power Transmission Company 2" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 1

You did not use the site, Click here to remain logged. Timeout: 60 second