Bidder Selection Plan

Contractor selection plan (Preparatory stage for investment)

  Watching  
Project Contractor selection plan Bid award
Find: 17:26 10/04/2026
Contractor Selection Plan ID
PL2600087244-00
Publishing time
17:25 10/04/2026
Posting Status
Published
Contractor selection plan name
Contractor selection plan (Preparatory stage for investment)
Investor
Name of project
Investing in building houses for families of armed forces in the Army in Bac Giang ward, Bac Ninh province
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Other
Authority that issues the decision
Tổng Công ty 789
Approval date
07/04/2026
Approval ID
145/QĐ-TCT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 7
1.Topographic survey, cadastral measurement and boundary staking for project planning
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Measure and draw 1/500 current status maps, determine planning boundaries, and serve design.
Capital source details
Equity and legally mobilized capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
2.Supervising consultants check product quality, survey terrain, take cadastral measurements and install boundary stakes to serve project planning
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervise field measurement work, check elevation and coordinates according to standards.
Capital source details
Equity and legally mobilized capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
3.Engineering geological survey
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Exploratory drilling, soil and rock sampling, testing of physical and mechanical criteria to serve foundation design.
Capital source details
Equity and legally mobilized capital
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
4.TVGS checks the quality of construction geological survey products
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervise the drilling process, borehole depth and sampling work at the site.
Capital source details
Equity and legally mobilized capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
5.Consulting on making master plan (including GIS); Establishing investment projects, applying building information modeling (BIM) in the feasibility report phase
Tender/ Prequalification Notice ID
Contract execution period
40 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Design architectural plans, prepare investment projects, Feasibility study reports and Basic designs, prepare TMB planning and apply BIM in the Pre-F/S phase
Capital source details
Equity and legally mobilized capital
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
6.Verify the feasibility study report and basic design
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verify the feasibility, technical solutions and total investment of the project before submitting for approval.
Capital source details
Equity and legally mobilized capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
7.TV Prepare environmental registration documents
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare documents on environmental impacts and protection measures according to current regulations.
Capital source details
Equity and legally mobilized capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan (Preparatory stage for investment)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan (Preparatory stage for investment)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 11

You did not use the site, Click here to remain logged. Timeout: 60 second