Contractor selection plan (project implementation phase) Package 5: Survey consulting for design preparation after the basic design step, technical design - estimate, construction drawing design, prepare BIM design, prepare bidding documents; Package 6: Consulting on technical design verification - estimates, construction drawing design; Package 7: Measuring and drawing plots; Package 8: Mine clearance. Project "New construction of Hoa Lac 220/110kV transformer station and 110/22kV level connection".
Contractor selection plan (project implementation phase) Package 5: Survey consulting for design preparation after the basic design step, technical design - estimate, construction drawing design, prepare BIM design, prepare bidding documents; Package 6: Consulting on technical design verification - estimates, construction drawing design; Package 7: Measuring and drawing plots; Package 8: Mine clearance. Project "New construction of Hoa Lac 220/110kV transformer station and 110/22kV level connection".
Meet the power needs for the 110kV power grid in the west of Hanoi and important medium voltage loads in Hoa Lac High-Tech Park, Thach That district and neighboring areas; Create strong connections between areas in the power system, increasing the safe and stable operation of the national power system; Increase power supply stability, reduce capacity loss and power loss in the system, improve production and business efficiency of Vietnam Electricity Group.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
240904.303QD-HDTV.KHLCNT TBA 220-110kV Hoa Lac.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 4
1.Package 5: Survey consulting to prepare designs after the basic design step, prepare technical designs - estimates, design construction drawings,
Prepare BIM design, prepare bidding documents
- Survey to prepare Design after basic design.
- Prepare technical designs - estimates, design construction drawings.
- Prepare BIM design.
- Prepare bidding documents for construction and installation packages, supply of equipment, etc.
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan (project implementation phase) Package 5: Survey consulting for design preparation after the basic design step, technical design - estimate, construction drawing design, prepare BIM design, prepare bidding documents; Package 6: Consulting on technical design verification - estimates, construction drawing design; Package 7: Measuring and drawing plots; Package 8: Mine clearance. Project "New construction of Hoa Lac 220/110kV transformer station and 110/22kV level connection".". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan (project implementation phase) Package 5: Survey consulting for design preparation after the basic design step, technical design - estimate, construction drawing design, prepare BIM design, prepare bidding documents; Package 6: Consulting on technical design verification - estimates, construction drawing design; Package 7: Measuring and drawing plots; Package 8: Mine clearance. Project "New construction of Hoa Lac 220/110kV transformer station and 110/22kV level connection"." plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.