Bidder Selection Plan

Contractor selection plan (project implementation phase) Package 5: Survey consulting for design preparation after the basic design step, technical design - estimate, construction drawing design, prepare BIM design, prepare bidding documents; Package 6: Consulting on technical design verification - estimates, construction drawing design; Package 7: Measuring and drawing plots; Package 8: Mine clearance. Project "New construction of Hoa Lac 220/110kV transformer station and 110/22kV level connection".

  Watching      
Find: 17:06 04/09/2024
Contractor Selection Plan ID
PL2400189196-00
Publishing time
17:05 04/09/2024
Posting Status
Published
Contractor selection plan name
Contractor selection plan (project implementation phase) Package 5: Survey consulting for design preparation after the basic design step, technical design - estimate, construction drawing design, prepare BIM design, prepare bidding documents; Package 6: Consulting on technical design verification - estimates, construction drawing design; Package 7: Measuring and drawing plots; Package 8: Mine clearance. Project "New construction of Hoa Lac 220/110kV transformer station and 110/22kV level connection".
Bid Solicitor
Investment objective
Meet the power needs for the 110kV power grid in the west of Hanoi and important medium voltage loads in Hoa Lac High-Tech Park, Thach That district and neighboring areas; Create strong connections between areas in the power system, increasing the safe and stable operation of the national power system; Increase power supply stability, reduce capacity loss and power loss in the system, improve production and business efficiency of Vietnam Electricity Group.
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2400049478-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
6 Years
Authority that issues the decision
TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HÀ NỘI
Approval date
04/09/2024
Approval ID
303/QĐ-HĐTV
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 4
1.Package 5: Survey consulting to prepare designs after the basic design step, prepare technical designs - estimates, design construction drawings, Prepare BIM design, prepare bidding documents
Tender/ Prequalification Notice ID
Contract execution period
250 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Survey to prepare Design after basic design. - Prepare technical designs - estimates, design construction drawings. - Prepare BIM design. - Prepare bidding documents for construction and installation packages, supply of equipment, etc.
Capital source details
Capital depreciation
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q3 2024
Type of contract
Package and Fixed Price
Prequalification
No
Implementation location (After merge)
Thạch Thất District, Hà Nội
Implementation location (Before merge)
Ha Noi city
2.Package 6: Consulting on technical design verification - estimates, construction drawing design
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verify technical design - estimate, verify construction drawing design.
Capital source details
Capital depreciation
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Thạch Thất District, Hà Nội
Implementation location (Before merge)
Ha Noi city
3.Package 7: Measuring and drawing plots
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Measuring and drawing plot maps to serve site clearance work.
Capital source details
Capital depreciation
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Thạch Thất District, Hà Nội
Implementation location (Before merge)
Ha Noi city
4.Package 8: Clearing mines
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey, plan and estimate; bomb and mine clearance work.
Capital source details
Capital depreciation
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Thạch Thất District, Hà Nội
Implementation location (Before merge)
Ha Noi city

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan (project implementation phase) Package 5: Survey consulting for design preparation after the basic design step, technical design - estimate, construction drawing design, prepare BIM design, prepare bidding documents; Package 6: Consulting on technical design verification - estimates, construction drawing design; Package 7: Measuring and drawing plots; Package 8: Mine clearance. Project "New construction of Hoa Lac 220/110kV transformer station and 110/22kV level connection".". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan (project implementation phase) Package 5: Survey consulting for design preparation after the basic design step, technical design - estimate, construction drawing design, prepare BIM design, prepare bidding documents; Package 6: Consulting on technical design verification - estimates, construction drawing design; Package 7: Measuring and drawing plots; Package 8: Mine clearance. Project "New construction of Hoa Lac 220/110kV transformer station and 110/22kV level connection"." plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 34

You did not use the site, Click here to remain logged. Timeout: 60 second