Data analysis results of DauThau.info software for bid solicitors Hanoi Power Corporation as follows:
- Has relationships with 4 project owners.
- Has relationships with 681 contractor.
- Announced 41 investment development project, of which 5 projects have not yet announced the prequalification documents.
- Announced 1162 contractor selection plans with a total of 1602 bidding packages, of which 967 prequalification documents have not found the investment project.
- Has invited bids for 1056 packages (with 1155 tender notices), and conducted prequalification for 1 packages.
- There are 59 bidding packages with content that needs clarification.
- Announced the results of 934 package, and canceled bids for 1 packages (among the packages mentioned above).
- There are 216 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 671 packages that have not fully posted the contractor selection results. Of these 631 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.58 contractors.
- Breakdown by bidding field: Goods 71.43%, Construction 11.95%, Consultancy 6.23%, Non-consultancy 7.01%, Mixed 2.16%, Other fields 1.22%.
- The total value according to the packages with valid contractor selection results is: 11,367,206,385,596 VND, of which the total winning bid value is: 10,679,811,271,518 VND.
- The savings rate is: 6.05%.
Data analysis results of DauThau.info software for bid solicitors Hanoi Power Corporation as follows:
- Has relationships with 681 contractor.
- The average number of contractors participating in each bidding package is: 2.58 contractors.
- Proportion of bidding fields: Goods 71.43%, Construction 11.95%, Consulting 6.23%, Non-consulting 7.01%, Mixed 2.16%, Other 1.22%.
- The total value according to the bidding package with valid IMP is: 11,367,206,385,596 VND, in which the total winning value is: 10,679,811,271,518 VND.
- The savings rate is: 6.05%.
This Bid solicitor is also an investor. The analysis results of data for the investor Hanoi Power Corporation are as follows:
- Is the investor of 41 development investment projects.
- Is the investor of 1439 contractor selection plans, of which 1096 were self-published, and 343 were published by other entities.
- Is the investor of 887 Tender Notices, of which 710 were self-invited, and 177 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 13 bidding packages, of which 13 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 22.51% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 96.69% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (11), Undefined (2)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (11), Undefined (2)
- Has relationships with 6 Bid Solicitors
- Has relationships with 9 Bid Investors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 26 bidding packages with 11 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Hanoi Power Corporation publishes the plan Procurement Plan (Project Implementation Phase): Construction of two new 22kV feeder lines from the 110kV Đại Kim substation to Dao 18, Yên Xá, and to the Việt Long Company substation. with 2 bidding package .
22/08/2026 11:23
Hanoi Power Corporation publishes the plan Revised tendering plan (project implementation phase) for the 110kV North An Khanh to South An Khanh power line. with 3 bidding package .
21/08/2026 09:24
Hanoi Power Corporation publishes the plan Installation of T3 MBA at the 110 kV Văn Quán substation with 1 bidding package .
20/08/2026 08:14
Hanoi Power Corporation publishes the plan Approval of the revised Procurement Plan for Package 06: Technical Design Consulting, Construction Drawing and Cost Estimation Services – New Construction of Ba Vi 110kV Substation and Branch Line. with 2 bidding package .
15/08/2026 09:09
Hanoi Power Corporation publishes the plan Revised procurement plan (project implementation phase): Installation of energy storage systems at 110kV substations in the southern part of the Red River Delta. with 6 bidding package .
10/08/2026 13:47
Hanoi Power Corporation publishes the plan The supplementary tender plan belongs to the project preparation phase, Tender Package 03: Preparation of a 1/500 scale current map, Project: "Construction of the new 110kV Hoàng Mai substation and branch" with 1 bidding package .
07/08/2026 08:48
Hanoi Power Corporation publishes the plan Regarding the approval of the procurement plan for the bidding packages prior to construction: "Upgrade of power lines for the 467, 468, and 469 110kV substations in Trâu Quỳ," with 1 bidding package .
06/08/2026 09:23
Hanoi Power Corporation publishes the plan Cost estimate contractor selection plan: Renovating and repairing the 2nd and 3rd floor offices of the Hanoi Electricity Development Project Management Board with 1 bidding package .
30/07/2026 18:38
The data sheet has been partially hidden, to see the full information please Login or Register
Hanoi Power Corporation publishes the plan 110kV Phu Cat and branch transformer station with 6 bidding package .
10/06/2026 15:57
Hanoi Power Corporation publishes the plan New construction of 220/110kV Hoa Lac transformer station and 110/22kV connection with 5 bidding package .
21/04/2026 10:05
Hanoi Power Corporation publishes the plan Regarding the approval of the contractor selection plan (project implementation phase) the project "Renovating the line 474E1.7 and 476E1.44 from Trung Hung resettlement to the end of the line". with 7 bidding package .
18/12/2025 18:41
Hanoi Power Corporation publishes the plan Contractor selection plan (Project implementation period) Project: New construction of 01 departure from 22kV route from 110kV Ngoc Hoi TBA to My Sa 2 TBA 2 with 4 bidding package .
17/09/2025 14:24
Hanoi Power Corporation publishes the plan Regarding the approval of the contractor selection plan (project implementation phase) the project "Renovating the line 474E1.7 and 476E1.44 from Trung Hung resettlement to the end of the line". with 7 bidding package .
13/08/2025 14:10
Hanoi Power Corporation publishes the plan Regarding the approval of the contractor selection plan (Investment preparation phase) Package 1: Survey and examination for feasibility study reports, specialized reports, preparing feasibility study reports Package 2: Consulting on examining the work of the project: Building a 110kV line from 220KV Cau Giay Station connecting to 110kV Tay Ho-CV Thu Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le Le with 2 bidding package .
08/07/2025 18:34
Hanoi Power Corporation publishes the plan Bidding selection plan package 01: Survey consultancy, Economic and technical reports: Digitizing technical records of lines and stations with 1 bidding package .
07/07/2025 09:11
Hanoi Power Corporation publishes the plan Regarding the approval of the contractor selection plan (Investment period) Package 2: Repairing the PMU of Hanoi Power Grid PMU project "Repairing a number of items of the Hanoi Power Grid Project Management Board" with 1 bidding package .
02/07/2025 19:34
Hanoi Power Corporation publishes the plan Regarding the approval of contractor selection plan
(Investment period)
Package 3: Consulting on designing construction drawings-mathematical drawing, preparing bidding documents
Bidding package 4: Consulting on examining construction drawing and mathematical drawing
Works: "Mid -world load after 110kV Phu Cat TBA" with 2 bidding package .
01/07/2025 11:18
Hanoi Power Corporation publishes the plan Renovating and expanding the 110kV side bar 110kV Gia Lam transformer station 2 with 1 bidding package .
23/06/2025 14:07
The data sheet has been partially hidden, to see the full information please Login or Register
Hanoi Power Corporation publishes the plan Procurement Plan (Project Implementation Phase): Construction of two new 22kV feeder lines from the 110kV Đại Kim substation to Dao 18, Yên Xá, and to the Việt Long Company substation. with 2 bidding package .
22/08/2026 11:23
Hanoi Power Corporation publishes the plan Revised tendering plan (project implementation phase) for the 110kV North An Khanh to South An Khanh power line. with 3 bidding package .
21/08/2026 09:24
Hanoi Power Corporation publishes the plan Installation of T3 MBA at the 110 kV Văn Quán substation with 1 bidding package .
20/08/2026 08:14
Hanoi Power Corporation publishes the plan Approval of the revised Procurement Plan for Package 06: Technical Design Consulting, Construction Drawing and Cost Estimation Services – New Construction of Ba Vi 110kV Substation and Branch Line. with 2 bidding package .
15/08/2026 09:09
Hanoi Power Corporation publishes the plan Revised procurement plan (project implementation phase): Installation of energy storage systems at 110kV substations in the southern part of the Red River Delta. with 6 bidding package .
10/08/2026 13:47
Hanoi Power Corporation publishes the plan The supplementary tender plan belongs to the project preparation phase, Tender Package 03: Preparation of a 1/500 scale current map, Project: "Construction of the new 110kV Hoàng Mai substation and branch" with 1 bidding package .
07/08/2026 08:48
Hanoi Power Corporation publishes the plan Regarding the approval of the procurement plan for the bidding packages prior to construction: "Upgrade of power lines for the 467, 468, and 469 110kV substations in Trâu Quỳ," with 1 bidding package .
06/08/2026 09:23
Hanoi Power Corporation publishes the plan Cost estimate contractor selection plan: Renovating and repairing the 2nd and 3rd floor offices of the Hanoi Electricity Development Project Management Board with 1 bidding package .
30/07/2026 18:38
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Hanoi Power Corporation has posted 1162 of the contractor selection plan, which contains 1602 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Hanoi Power Corporation posted 1 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Hanoi Power Corporation has posted 1155 Tender Notices in 1056 bidding packages. Among these, 820 Tender Notices were self-invited, and 335 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Hanoi Power Corporation has posted 934 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 934 package, canceled the bid 1 package (among the bidding packages above).
- There are 216 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Hanoi Power Corporation has a relationship with 681 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Hanoi Power Corporation has a relationship with 53 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Hanoi Power Corporation has a relationship with 5 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects