Bidder Selection Plan

Contractor selection plan Project: New construction connecting medium voltage lines to ensure electricity supply in Tan Thoi Nhi, Ba Diem, Xuan Thoi Dong communes, Hoc Mon district - Package XL 25-11: Construction, supply of materials and purchase of construction insurance; - Package CN 25-11: Construction and installation of head boxes and underground cable junction boxes; - Package GS 25-11: Construction supervision consulting; - Package HL 25-11: Construction and installation of connections by hotline method; - Package November 25: Testing and calibration of materials and equipment.

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 10:41 07/01/2026
Contractor Selection Plan ID
PL2500344621-02
Publishing time
10:39 07/01/2026
Posting Status
Published
Contractor selection plan name
Contractor selection plan Project: New construction connecting medium voltage lines to ensure electricity supply in Tan Thoi Nhi, Ba Diem, Xuan Thoi Dong communes, Hoc Mon district - Package XL 25-11: Construction, supply of materials and purchase of construction insurance; - Package CN 25-11: Construction and installation of head boxes and underground cable junction boxes; - Package GS 25-11: Construction supervision consulting; - Package HL 25-11: Construction and installation of connections by hotline method; - Package November 25: Testing and calibration of materials and equipment.
Investment objective
The project "New construction connecting medium voltage lines to ensure electricity supply in the area of ​​Tan Thoi Nhi, Ba Diem, Xuan Thoi Dong communes, Hoc Mon district" is implemented with items to pull new medium voltage grids connecting medium voltage lines; Pull new double-circuit underground cables instead of branches that are operating as a single circuit. A summary of the contents is as follows: - Replace low-voltage poles, replace medium-voltage wires with small cross-sections, long-term operation, low sags that do not ensure safety, create loop connections for branch branches, increase load transfer capacity
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2400052194-01
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
3 Years
Authority that issues the decision
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - CÔNG TY ĐIỆN LỰC HÓC MÔN
Approval date
07/01/2026
Approval ID
56/QĐ-PCHM
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 5
1.XL 11-25: Construction, supply of materials and purchase of construction insurance
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out construction, provide VTTB and buy construction insurance
Capital source details
KHCB + Credit loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January 2026
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
2.Package GS 25-11: Construction supervision consulting
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out construction supervision consultancy
Capital source details
KHCB + Credit loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
January 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
3.Package HL 25-11: Construction and installation of connections using hotline method
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Conduct connection, install equipment by hotline measures
Capital source details
KHCB + Credit loan
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January 2026
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
4.Contract package November 25: Testing and calibration of equipment and supplies
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Perform experiment to adjust equipment and equipment
Capital source details
KHCB + Credit loan
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January 2026
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
5.Package CN 25-11: Construction and installation of head boxes and underground cable junction boxes
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out construction and installation of the top box, underground cable connection box
Capital source details
KHCB + Credit loan
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January 2026
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan Project: New construction connecting medium voltage lines to ensure electricity supply in Tan Thoi Nhi, Ba Diem, Xuan Thoi Dong communes, Hoc Mon district - Package XL 25-11: Construction, supply of materials and purchase of construction insurance; - Package CN 25-11: Construction and installation of head boxes and underground cable junction boxes; - Package GS 25-11: Construction supervision consulting; - Package HL 25-11: Construction and installation of connections by hotline method; - Package November 25: Testing and calibration of materials and equipment.". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan Project: New construction connecting medium voltage lines to ensure electricity supply in Tan Thoi Nhi, Ba Diem, Xuan Thoi Dong communes, Hoc Mon district - Package XL 25-11: Construction, supply of materials and purchase of construction insurance; - Package CN 25-11: Construction and installation of head boxes and underground cable junction boxes; - Package GS 25-11: Construction supervision consulting; - Package HL 25-11: Construction and installation of connections by hotline method; - Package November 25: Testing and calibration of materials and equipment." plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 2

You did not use the site, Click here to remain logged. Timeout: 60 second