Bidder Selection Plan

Contractor selection plan: The work under the SCL plan 2025: (i) Objects replaced the 110kV DCL sets at TBA E1.21 (Nhat Tan), E1.5 (Thuong Dinh), E10.6 (Phuc Tho), E10.9 (Xuan Mai); (ii) Agreeing to replace the 110kV current variable at the stations E1.5 Thuong Dinh, E1.7 Son Tay, E1.21 Nhat Tan; (iii) Object replaces 110kV voltage transformers E1.36 Quang Minh.

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 08:19 18/06/2025
Contractor Selection Plan ID
PL2500153279-00
Publishing time
08:18 18/06/2025
Posting Status
Published
Contractor selection plan name
Contractor selection plan: The work under the SCL plan 2025: (i) Objects replaced the 110kV DCL sets at TBA E1.21 (Nhat Tan), E1.5 (Thuong Dinh), E10.6 (Phuc Tho), E10.9 (Xuan Mai); (ii) Agreeing to replace the 110kV current variable at the stations E1.5 Thuong Dinh, E1.7 Son Tay, E1.21 Nhat Tan; (iii) Object replaces 110kV voltage transformers E1.36 Quang Minh.
Procurement name
The work under the SCL plan in 2025: (i) The overhaul replaces the 110kV DCL sets at TBA E1.21 (Nhat Tan), E1.5 (Thuong Dinh), E10.6 (Phuc Tho), E10.9 (Xuan Mai); (ii) Agreeing to replace the 110kV current variable at the stations E1.5 Thuong Dinh, E1.7 Son Tay, E1.21 Nhat Tan; (iii) Object replaces 110kV voltage transformers E1.36 Quang Minh.
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Shopping budget
To view full information, please Login or Register
Spending Category
Mandatory spending
Authority that issues the decision
Công ty lưới điện cao thế TP Hà Nội
Approval date
17/06/2025
Approval ID
2782/QĐ-EVNHANOIHGC
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 4
1.Package 2: Supply VTTB
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing 110kV isolation, 110kV, 110kV voltage variable and connected accessories and accessories materials
Capital source details
Large repair in 2025
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
June, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Cầu Giấy District, Hà Nội
Implementation location (Before merge)
Ha Noi city
2.Package 3: Replace 110kV isolated knife equipment, 110kV current, 110kV voltage variable
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Replace the 110kV isolation knife device, 110kV current, 110kV voltage variables at TBA: Quang Minh, Nhat Tan, Thuong Dinh, Phuc Tho, Xuan Mai, Son Tay
Capital source details
Large repair in 2025
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
June, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Cầu Giấy District, Hà Nội
Implementation location (Before merge)
Ha Noi city
3.Bidding package 4: SCADA adjustment
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Experimental and testing experiments SCADA guarantees to ensure the conditions for electricity to operate at 110kV TBA: Quang Minh, Nhat Tan, Thuong Dinh, Phuc Tho, Xuan Xuan, Xuan Mai, Son Tay
Capital source details
Large repair in 2025
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
June, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Cầu Giấy District, Hà Nội
Implementation location (Before merge)
Ha Noi city
4.Package 5: Equipment correction experiments
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Experiment to adjust equipment and equipment put into the project at 110kV TBA: Quang Minh, Nhat Tan, Thuong Dinh, Phuc Tho, Xuan Mai, Son Tay
Capital source details
Large repair in 2025
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
June, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Cầu Giấy District, Hà Nội
Implementation location (Before merge)
Ha Noi city

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan: The work under the SCL plan 2025: (i) Objects replaced the 110kV DCL sets at TBA E1.21 (Nhat Tan), E1.5 (Thuong Dinh), E10.6 (Phuc Tho), E10.9 (Xuan Mai); (ii) Agreeing to replace the 110kV current variable at the stations E1.5 Thuong Dinh, E1.7 Son Tay, E1.21 Nhat Tan; (iii) Object replaces 110kV voltage transformers E1.36 Quang Minh.". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan: The work under the SCL plan 2025: (i) Objects replaced the 110kV DCL sets at TBA E1.21 (Nhat Tan), E1.5 (Thuong Dinh), E10.6 (Phuc Tho), E10.9 (Xuan Mai); (ii) Agreeing to replace the 110kV current variable at the stations E1.5 Thuong Dinh, E1.7 Son Tay, E1.21 Nhat Tan; (iii) Object replaces 110kV voltage transformers E1.36 Quang Minh." plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 3

You did not use the site, Click here to remain logged. Timeout: 60 second