Short appointment of contractors, no pre-qualification domestically, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
September 2019
Contract Type
All in one
Prequalification
No
Location
2.Package 2 (Consultancy): Preparation of bidding documents, evaluation of bids for mixed package (EP) Design and supply of technological equipment: 250 capacity composting waste recycling line tons/day (8 hours/day)
Short appointment of contractors, no pre-qualification domestically, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
October 2019
Contract Type
All in one
Prequalification
No
Location
5.Tender package No 3C1 (Construction): Technical infrastructure: Leveling, traffic, storm water drainage, wastewater system; Water supply system Compost area
Offers are competitive, domestic, not pre-qualified, not online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2020
Contract Type
All in one
Prequalification
No
Location
16.Tender package No 3E1 (Consulting): Supervision of equipment installation and technology Composting waste recycling line with capacity of 250 tons/day (8 hours/day)
Short appointment of contractors, no pre-qualification domestically, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
December 2019
Contract Type
All in one
Prequalification
No
Location
24.Tender package No 5C (Construction + equipment): Renovating and upgrading wastewater treatment system 180m3/day.night - System of sewage sludge treatment 100m3/day
Open bidding, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
December 2019
Contract Type
All in one
Prequalification
No
Location
25.Tender package No 5E (Consultation): Construction supervision and equipment installation: Renovating and upgrading Wastewater treatment system 180m3/day.night - System of sewage sludge treatment 100m3/day
Short appointment of contractors, no pre-qualification domestically, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January 2024
Contract Type
All in one
Prequalification
No
Location
34.Tender package No 7A (Consulting): Designing construction drawings, estimating Road D1; D2;D3;N1; stormwater; to drain off waste water; Lighting systems; green trees; fence
Open bidding, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
September 2019
Contract Type
All in one
Prequalification
No
Location
35.Tender package No 7B (Consulting): Verification of construction drawing design, cost estimate of roads D1; D2; D3; N1; Rainwater drainage system; Sewerage system; Lighting systems; green trees ; fence
Open bidding, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
December 2019
Contract Type
All in one
Prequalification
No
Location
39.Tender package No 7E (Consulting): Construction supervision of N1, D1, D2, D3 roads; Stormwater; To drain off waste water; Lighting systems ; green trees; fence
Offers are competitive, domestic, not pre-qualified, not online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January 2020
Contract Type
All in one
Prequalification
No
Location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "DISPOSAL AND INDUSTRIAL SOLID WASTE ZONE". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "DISPOSAL AND INDUSTRIAL SOLID WASTE ZONE" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.