Bidder Selection Plan

DISPOSAL AND INDUSTRIAL SOLID WASTE ZONE

  Watching      
Find: 09:05 17/12/2020
Contractor selection plan ID
20190930874-06
Publication date
08:58 17/12/2020
Publication status
Actual notification
Contractor selection plan name
DISPOSAL AND INDUSTRIAL SOLID WASTE ZONE
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
20190930758-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Project
QD status
There has been a decision to approve the investment project
Location
Approval date
12/09/2019
Approval ID
190/QĐ-SZE-HĐQT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

Related announcements

- Change: Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Publication date (View changes)

- Change: Highest bid price, Publication date, Bidding package information (View changes)

- Change: Lowest bid price, Highest bid price, Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Notification form, Highest bid price, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 10
1.Tender package No 1 (Consulting): Surveying and designing construction drawings for auxiliary areas, Compost areas, wastewater treatment areas; burial box; Shared technical infrastructure
Tender/ Prequalification Notice ID
Contract Period
20 days
Domestic/ International
International
Bidding method
Directly
Fields
Advise
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Company capital and loan capital
Contractor Selection Type
null, domestic, not prequalified, not online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
September 2019
Contract Type
All in one
Prequalification
No
Location
2.Package 2 (Consultancy): Preparation of bidding documents, evaluation of bids for mixed package (EP) Design and supply of technological equipment: 250 capacity composting waste recycling line tons/day (8 hours/day)
Tender/ Prequalification Notice ID
Contract Period
80 days
Domestic/ International
International
Bidding method
Directly
Fields
Advise
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Company capital and loan capital
Contractor Selection Type
null, domestic, not prequalified, not online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
September 2019
Contract Type
All in one
Prequalification
No
Location
3.Tender package No 3A (Consultation): Designing construction drawings, estimating the Compost humus processing plant area
Tender/ Prequalification Notice ID
Contract Period
30 days
Domestic/ International
International
Bidding method
Directly
Fields
Advise
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Company capital and loan capital
Contractor Selection Type
null, domestic, not prequalified, not online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
September 2019
Contract Type
All in one
Prequalification
No
Location
4.Tender package No 3B (Consulting): Verification of construction drawing design, cost estimate of Compost humus treatment plant site
Tender/ Prequalification Notice ID
Contract Period
20 days
Domestic/ International
International
Bidding method
Directly
Fields
Advise
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Company capital and loan capital
Contractor Selection Type
null, domestic, not prequalified, not online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
October 2019
Contract Type
All in one
Prequalification
No
Location
5.Tender package No 3C2 (Construction): Planting Trees Compost area
Tender/ Prequalification Notice ID
Contract Period
60 days
Domestic/ International
International
Bidding method
Directly
Fields
Civil Works
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Company capital and loan capital
Contractor Selection Type
null, domestic, not prequalified, not online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2020
Contract Type
All in one
Prequalification
No
Location
6.Tender package No 3C3 (Construction): Construction of Compost Site Communication System
Tender/ Prequalification Notice ID
Contract Period
60 days
Domestic/ International
International
Bidding method
Directly
Fields
Civil Works
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Company capital and loan capital
Contractor Selection Type
null, domestic, not prequalified, not online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2020
Contract Type
All in one
Prequalification
No
Location
7.Tender package No 3C4 (Construction): 22KV transmission line, 560KVA substation 22 04KV, low voltage line, lighting system for Compost area
Tender/ Prequalification Notice ID
Contract Period
90 days
Domestic/ International
International
Bidding method
Online
Fields
Civil Works
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Company capital and loan capital
Contractor Selection Type
null, domestic, no pre-qualification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2020
Contract Type
All in one
Prequalification
No
Location
8.Tender package No 3C5 (Construction): Workshop received; refining workshop; Compost Division storage workshop
Tender/ Prequalification Notice ID
Contract Period
90 days
Domestic/ International
International
Bidding method
Directly
Fields
Civil Works
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Company capital and loan capital
Contractor Selection Type
null, domestic, not prequalified, not online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
June 2020
Contract Type
All in one
Prequalification
No
Location
9.Tender package No 3C6 (Construction): Annealing workshop 1; Annealing workshop 2; brewery 3a Compost area
Tender/ Prequalification Notice ID
Contract Period
150 days
Domestic/ International
International
Bidding method
Directly
Fields
Civil Works
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Company capital and loan capital
Contractor Selection Type
null, domestic, not prequalified, not online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
June 2020
Contract Type
All in one
Prequalification
No
Location
10.Tender package No 3C7 (Construction): Auxiliary workshop 1 ; auxiliary workshop 2; operator; canteen ; transformer station; pump housing; Underground water tanks; Guardhouse of Compost
Tender/ Prequalification Notice ID
Contract Period
120 days
Domestic/ International
International
Bidding method
Directly
Fields
Civil Works
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Company capital and loan capital
Contractor Selection Type
null, domestic, not prequalified, not online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2020
Contract Type
All in one
Prequalification
No
Location
11.Tender package No 3D1 Supply and installation of technological equipment: Compost waste recycling line with capacity of 250 tons/day (8 hours/day)
Tender/ Prequalification Notice ID
Contract Period
270 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Open bidding, International, No pre-qualification, One stage, two envelopes of documents
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
12.Tender package No 3D2 (Supply and installation): Waste sorting line with capacity of 200 tons/day (8 hours/day)
Tender/ Prequalification Notice ID
Contract Period
45 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Open bidding,Domestic,No prequalification,One phase, one dossier bag
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
13.Tender package No 3D4 (Supply and Installation): Compost equipment: Backup generator; Container ; pump…
Tender/ Prequalification Notice ID
Contract Period
30 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Competitive offers, Domestic, No pre-qualification, One stage, one envelope
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
14.Tender package No 3E1 (Consulting): Supervision of equipment installation and technology Composting waste recycling line with capacity of 250 tons/day (8 hours/day)
Tender/ Prequalification Notice ID
Contract Period
270 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Brief appointment of contractors, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
15.Tender package No 3E2 (Consulting): Supervision of equipment installation: Waste sorting line with capacity of 200 tons/day (8 hours/day)
Tender/ Prequalification Notice ID
Contract Period
45 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Brief appointment of contractors, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
16.Tender package No 3E3 (Consultation): Supervision of equipment installation: Bone spraying system, deodorizing sorting workshop, incubation workshop
Tender/ Prequalification Notice ID
Contract Period
60 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Brief appointment of contractors, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
17.Tender package No 3E4 (Consultancy): Construction supervision of the Compost Compost Plant for the treatment of domestic waste
Tender/ Prequalification Notice ID
Contract Period
180 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Open bidding,Domestic,No prequalification,One stage, two dossier bags
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
18.Package 4A (Consultancy): Construction drawing design, Auxiliary area estimate - Operation
Tender/ Prequalification Notice ID
Contract Period
30 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Brief appointment of contractors, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
19.Tender package No 4B (Consultancy): Verification of construction drawing design, estimate of Auxiliary Area - Operation
Tender/ Prequalification Notice ID
Contract Period
20 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Brief appointment of contractors, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
20.Tender package No 5C (Construction + equipment): Renovating and upgrading wastewater treatment system 180m3/day.night - System of sewage sludge treatment 100m3/day
Tender/ Prequalification Notice ID
Contract Period
180 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Open bidding,Domestic,No prequalification,One stage, two dossier bags
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
21.Tender package No 5E (Consultation): Construction supervision and equipment installation: Renovating and upgrading Wastewater treatment system 180m3/day.night - System of sewage sludge treatment 100m3/day
Tender/ Prequalification Notice ID
Contract Period
180 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Brief appointment of contractors, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
22.Tender package No 6A (Consultancy): Design construction drawings, estimate burial plots H1;H2;H3
Tender/ Prequalification Notice ID
Contract Period
60 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Open bidding,Domestic,No prequalification,One stage, two dossier bags
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
23.Package 6B (Consultancy): Verification of construction drawing design, estimate of burial plots H1;H2;H3
Tender/ Prequalification Notice ID
Contract Period
20 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Brief appointment of contractors, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
24.Tender package No 6C1 (Construction): H1 . burial plot
Tender/ Prequalification Notice ID
Contract Period
120 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Open bidding,Domestic,No prequalification,One phase, one dossier bag
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
25.Tender package No 6C2 (Construction): H2 . burial plot
Tender/ Prequalification Notice ID
Contract Period
120 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Open bidding,Domestic,No prequalification,One phase, one dossier bag
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
26.Tender package No 6C3 (Construction): H3 . burial plot
Tender/ Prequalification Notice ID
Contract Period
120 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Open bidding,Domestic,No prequalification,One phase, one dossier bag
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
27.Tender package No 6E1 (Consultation): Construction supervision of H1 . burial plots
Tender/ Prequalification Notice ID
Contract Period
120 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Brief appointment of contractors, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
28.Tender package No 6E2 (Consultancy): Supervision of construction of H2 burial plots
Tender/ Prequalification Notice ID
Contract Period
120 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Brief appointment of contractors, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
29.Tender package No 6E3 (Consulting): Supervision of construction of H3 burial plots
Tender/ Prequalification Notice ID
Contract Period
120 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Brief appointment of contractors, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
30.Tender package No 7A (Consulting): Designing construction drawings, estimating Road D1; D2;D3;N1; stormwater; to drain off waste water; Lighting systems; green trees; fence
Tender/ Prequalification Notice ID
Contract Period
30 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Open bidding,Domestic,No prequalification,One stage, two dossier bags
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
31.Tender package No 7B (Consulting): Verification of construction drawing design, cost estimate of roads D1; ​​D2; D3; N1; Rainwater drainage system; Sewerage system; Lighting systems; green trees ; fence
Tender/ Prequalification Notice ID
Contract Period
20 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Brief appointment of contractors, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
32.Tender package No 7C1 (Construction): Roads N1, D1, D2, D3; Stormwater; To drain off waste water; Lighting systems
Tender/ Prequalification Notice ID
Contract Period
180 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Open bidding,Domestic,No prequalification,One stage, two dossier bags
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
33.Tender package No 7C2 (Construction): Planting Trees (outside the Compost Site)
Tender/ Prequalification Notice ID
Contract Period
90 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Open bidding,Domestic,No prequalification,One phase, one dossier bag
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
34.Tender package No 7C3 (Construction): Fence wall
Tender/ Prequalification Notice ID
Contract Period
90 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Open bidding,Domestic,No prequalification,One phase, one dossier bag
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
35.Tender package No 7E (Consulting): Construction supervision of N1, D1, D2, D3 roads; Stormwater; To drain off waste water; Lighting systems ; green trees; fence
Tender/ Prequalification Notice ID
Contract Period
180 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Open bidding,Domestic,No prequalification,One stage, two dossier bags
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
36.Tender package No 8A (Consultancy): Construction drawing design, Total cost estimate of fire protection and lightning protection system
Tender/ Prequalification Notice ID
Contract Period
20 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Brief appointment of contractors, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
37.Package 8B (Consulting): Verification of construction drawing design, total cost estimate of fire protection and lightning protection system
Tender/ Prequalification Notice ID
Contract Period
20 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Brief appointment of contractors, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
38.Tender package No 8C (Construction + equipment): Construction of fire protection and lightning protection system
Tender/ Prequalification Notice ID
Contract Period
60 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Open bidding,Domestic,No prequalification,One phase, one dossier bag
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
39.Tender package No 8E (Consulting): Supervision of construction of fire protection and lightning protection systems
Tender/ Prequalification Notice ID
Contract Period
60 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Brief appointment of contractors, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
40.Tender package No 9D1 (Supply and installation): Camera system
Tender/ Prequalification Notice ID
Contract Period
30 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Competitive offers, Domestic, No pre-qualification, One stage, one envelope
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
41.Tender package No 9D2 (Supply and installation): Office equipment
Tender/ Prequalification Notice ID
Contract Period
30 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Competitive offers, Domestic, No pre-qualification, One stage, one envelope
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
42.Tender package No 9D3 (Supply): Cars for the project
Tender/ Prequalification Notice ID
Contract Period
30 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Competitive offers, Domestic, No pre-qualification, One stage, one envelope
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
43.Tender package No 4C (Construction): Construction of Auxiliary Area - Operation
Tender/ Prequalification Notice ID
Contract Period
90 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Open bidding,Domestic,No prequalification,One phase, one dossier bag
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
44.Tender package No 4E (Consulting): Construction supervision of the Auxiliary - Operational Area
Tender/ Prequalification Notice ID
Contract Period
180 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Brief appointment of contractors, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
45.Tender package No 3C1 (Construction): Technical infrastructure: Leveling, traffic, storm water drainage, wastewater system; Water supply system Compost area
Tender/ Prequalification Notice ID
Contract Period
120 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Open bidding,Domestic,No prequalification,One stage, two dossier bags
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
46.Package 3D2A (Supply and install) Conveyor transfer from annealing workshop to refining workshop
Tender/ Prequalification Notice ID
Contract Period
45 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Competitive offers, Domestic, No pre-qualification, One stage, one envelope
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
47.Package 3E2A (Consultancy) Supervision Supply and installation Conveyor transfer from brewery to refinery
Tender/ Prequalification Notice ID
Contract Period
45 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Brief appointment of contractors, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location
48.Tender package No 3D3 (Supply and installation): Bone spraying system, deodorizing sorting workshop, incubation workshop
Tender/ Prequalification Notice ID
Contract Period
60 days
Domestic/ International
International
Bidding method
Online
Fields
Regulatory compliance
Funding source
Contractor Selection Type
Competitive offers, Domestic, No pre-qualification, One stage, one envelope
Contractor Selection Method
Contractor Selection Period
Contract Type
All in one
Prequalification
No
Location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "DISPOSAL AND INDUSTRIAL SOLID WASTE ZONE". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "DISPOSAL AND INDUSTRIAL SOLID WASTE ZONE" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.
Views: 90

Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8534 Projects are waiting for contractors
  • 141 Tender notices posted in the last 24 hours
  • 159 Contractor selection plan posted in the last 24 hours
  • 23692 Tender notices posted in the past month
  • 37141 Contractor selection plan posted in the last month
Consultants are supporting you
You are not logged in.
To view information, please Login or Register if you do not have an account.
Signing up is simple and completely free.
You did not use the site, Click here to remain logged. Timeout: 60 second