Bidder Selection Plan

Implementing project 996: Maintaining measurement standards, certification assessment, maintaining testing laboratories according to ISO 17025 - electrical testing field, calibration measurement field and assessment and designation of method inspection capacity measuring group 2

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 10:26 19/10/2024
Contractor Selection Plan ID
PL2400238402-00
Publishing time
10:26 19/10/2024
Posting Status
Published
Contractor selection plan name
Implementing project 996: Maintaining measurement standards, certification assessment, maintaining testing laboratories according to ISO 17025 - electrical testing field, calibration measurement field and assessment and designation of method inspection capacity measuring group 2
Procurement name
Implementing project 996: Maintaining measurement standards, certification assessment, maintaining testing laboratories according to ISO 17025 - electrical testing field, calibration measurement field and assessment and designation of method inspection capacity measuring group 2
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Shopping budget
To view full information, please Login or Register
Spending Category
Mandatory spending
Authority that issues the decision
Trung tâm Phân tích và Đo lường Chất lượng Bình Định
Approval date
15/10/2024
Approval ID
46/QĐ-TTPT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 2
1.Verification – Calibration of measurement standards and inspection means
Tender/ Prequalification Notice ID
Contract execution period
80 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verification and calibration of 64 measurement standards and testing means
Capital source details
Science and technology career capital in 2024
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Quy Nhơn City, Province Bình Định
Implementation location (After merge)
Prequalification
No
2.Purchase a proficiency testing organization template
Tender/ Prequalification Notice ID
Contract execution period
80 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Purchase materials to make samples and organize proficiency testing
Capital source details
Science and technology career capital in 2024
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Quy Nhơn City, Province Bình Định
Implementation location (After merge)
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Implementing project 996: Maintaining measurement standards, certification assessment, maintaining testing laboratories according to ISO 17025 - electrical testing field, calibration measurement field and assessment and designation of method inspection capacity measuring group 2". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Implementing project 996: Maintaining measurement standards, certification assessment, maintaining testing laboratories according to ISO 17025 - electrical testing field, calibration measurement field and assessment and designation of method inspection capacity measuring group 2" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 75

You did not use the site, Click here to remain logged. Timeout: 60 second