Bidder Selection Plan

Investment project to build infrastructure expansion of optical cable network in 2025 in Bac Lieu

  Watching  
Project Contractor selection plan Bid award
Find: 20:07 01/07/2025
Contractor Selection Plan ID
PL2500164837-00
Publishing time
15:46 01/07/2025
Posting Status
Published
Contractor selection plan name
Investment project to build infrastructure expansion of optical cable network in 2025 in Bac Lieu
Investment objective
- Investing in the construction of solid fiber optic cable lines in natural disasters, solidifying key fiber optic cables and serving underground chemical cable, urban embellishment. - Investing in the construction of optical cables to meet the connection for new stations positions for the period of 2025 - 2026 in Bac Lieu.
Project management forms
BQLDA major - area
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500040430-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
3 Years
Authority that issues the decision
TỔNG CÔNG TY MẠNG LƯỚI VIETTEL - CHI NHÁNH TẬP ĐOÀN CÔNG NGHIỆP - VIỄN THÔNG QUÂN ĐỘI
Approval date
27/06/2025
Approval ID
305205465/250625-36/QĐ-VTNet
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 4
1.170605- CDTRG/VTNET/XL 2025: Investing in building infrastructure expansion of fiber optic network in 2025 in Bac Lieu
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction: -Cablecar pulling: 74,200 m -Check the existing tanks: 3,100 m -The column planting: 15 columns
Capital source details
Owner Contribution Amount
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Ca Mau province
2.170606-CĐTRG/VTNET/TVGSTC 2025: Construction supervision: Investment in construction of infrastructure to expand optical cable network in 2025 in Bac Lieu
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction supervision: -Cablecar pulling: 74,200 m -Check the existing tanks: 3,100 m -The column planting: 15 columns
Capital source details
Owner Contribution Amount
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Ca Mau province
3.170607-CĐTRG/VTNET/TVGSAT 2025: Electrical safety monitoring: Investment in construction of infrastructure expansion of optical cable network in 2025 in Bac Lieu
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Electrical safety monitoring: -Cablecar pulling: 74,200 m -Check the existing tanks: 3,100 m -The column planting: 15 columns
Capital source details
Owner Contribution Amount
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Ca Mau province
4.170608-CĐTRG/VTNET/TVKSTK 2025: Survey of construction drawing designs and construction estimates: Investment in construction infrastructure expansion of optical cable network in 2025 in Bac Lieu
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey of construction drawing designs and construction estimates: -Cablecar pulling: 74,200 m -Check the existing tanks: 3,100 m -The column planting: 15 columns
Capital source details
Owner Contribution Amount
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Ca Mau province

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Investment project to build infrastructure expansion of optical cable network in 2025 in Bac Lieu". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Investment project to build infrastructure expansion of optical cable network in 2025 in Bac Lieu" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 11

You did not use the site, Click here to remain logged. Timeout: 60 second