Bidder Selection Plan

KHLCNT is phase 4 (bidding packages 9-14 and from 18-20)

  Watching      
Find: 11:25 22/04/2024
Contractor Selection Plan ID
PL2400061528-00
Publishing time
11:24 22/04/2024
Posting Status
Published
Contractor selection plan name
KHLCNT is phase 4 (bidding packages 9-14 and from 18-20)
Investment objective
Ensuring electricity supply for loads including: Tan Tuyen town (mainly supplying electricity to VSIP 2 Industrial Park (VSIP 2 MR1, VSIP 2 MR4 existing, VSIP 2 MR 3, VSIP 2 MR5 in the future), Ben Cat Town of Binh Duong Province; meeting the needs of economic and social development of Binh Duong province and the surrounding area
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2300005364-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
2024 Years
Authority that issues the decision
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA
Approval date
16/04/2024
Approval ID
613/QĐ-EVNNPT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 9
1.Package 9: Supply and transport 220 kV transformers
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply and transport 220 kV transformers
Capital source details
Loan and capital EVNNPT
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Tỉnh Bình Dương
2.Package 10: Supply and transport the most VTTB
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
International
Bidding method
Directly
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply and transport the most VTTB
Capital source details
Loan and capital EVNNPT
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Bình Chánh District, TP.Hồ Chí Minh
Implementation location (Before merge)
TP. Hồ Chí Minh
3.Package 11: Supply and install the second second, information and scada
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply and install the second second, information and scada
Capital source details
Loan and capital EVNNPT
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
TP. Hồ Chí Minh
4.Package 12: Supply and transport steel columns for connection line
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Goods
Regulatory compliance
CPTPP/EVFTA/UKVFTA
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply and transport steel poles for connection lines
Capital source details
Loan and capital EVNNPT
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Tỉnh Bình Dương
5.Tender package No 13: Supply and transport of insulation and accessories, fiber optic cables and accessories for connection lines
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
International
Bidding method
Directly
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply and transport insulation and accessories, fiber optic cables and accessories for connection lines
Capital source details
Loan and capital EVNNPT
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
TP. Hồ Chí Minh
6.Tender package No 14: Supply and transport of conductors and lightning protection wires for connection lines
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply and transport conductors and lightning protection wires for connection lines
Capital source details
Loan and capital EVNNPT
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Tỉnh Bình Dương
7.Package 18: Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
360 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction insurance
Capital source details
EVNNPT
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
By percentage
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Tỉnh Bình Dương
8.Tender package No 19: Construction supervision consultancy
Tender/ Prequalification Notice ID
Contract execution period
360 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction supervision consultancy
Capital source details
Loan and capital EVNNPT
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Tỉnh Bình Dương
9.Tender package No 20: Auditing the project settlement report completed
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Audit of completed project settlement reports
Capital source details
Loan and capital EVNNPT
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
TP. Hồ Chí Minh

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "KHLCNT is phase 4 (bidding packages 9-14 and from 18-20)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "KHLCNT is phase 4 (bidding packages 9-14 and from 18-20)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 26

You did not use the site, Click here to remain logged. Timeout: 60 second