- Investment in construction, installation of nitric acid tanks (HNO3) capacity of 1200 m3
- Increase the time of nitric acid reserve (HNO3), thereby helping the factory more active in providing nitric acid (HNO3) to serve production.
- Avoid the risk of stopping the long -term production lines when stopping repairing instead of nitric acid production catalysts (HNO3), ensuring continuous production is not interrupted;
- Proactively maintain and repair to ensure safety in production.
Project management forms
The investor hires a project management consultant
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
Scan_0721.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
- Surveying data collection for construction drawing designs: Technology connection points, technical infrastructure, adjacent works;
- Prepare construction drawing records;
- Estimation of construction construction, processing, installation of equipment
- Construction of works;
- Processing and installing tanks;
- Supply and install equipment;
- Test operation;
- Complete the acceptance and handover of the project.
- Monitor environmental indicators in the construction phase as prescribed;
- Making dossiers of environmental monitoring reports during the construction process.
Verify and approve the settlement of the project to complete in accordance with the provisions of Decree 99/2021/ND -CP and of HCM City Industrial Corporation - Vinacomin. Including checking legal records; investment costs; Comments, evaluation, recommendations and other necessary requirements as prescribed
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "KHLCNT Nitric acid project". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "KHLCNT Nitric acid project" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.