Bidder Selection Plan

KHLCNT Nitric acid project

  Watching      
Find: 19:48 20/11/2025
Contractor Selection Plan ID
PL2500214220-01
Publishing time
19:47 20/11/2025
Posting Status
Published
Contractor selection plan name
KHLCNT Nitric acid project
Investment objective
- Investment in construction, installation of nitric acid tanks (HNO3) capacity of 1200 m3 - Increase the time of nitric acid reserve (HNO3), thereby helping the factory more active in providing nitric acid (HNO3) to serve production. - Avoid the risk of stopping the long -term production lines when stopping repairing instead of nitric acid production catalysts (HNO3), ensuring continuous production is not interrupted; - Proactively maintain and repair to ensure safety in production.
Project management forms
The investor hires a project management consultant
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500046530-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
2 Years
Authority that issues the decision
HĐTV Tổng công ty
Approval date
17/11/2025
Approval ID
5033/QĐ-MICCO
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 11
1.Bidding package 01: Consulting on making bidding doctors, evaluating Bids of bidding packages No. 3, 4, 6
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Evaluation of Bidding Documents, Bid DD assessment package 3 (survey and design drawing drawing, construction cost estimates), Package 4 (Project management consultancy and construction supervision, equipment installation), Bidding package No. 6 (PC - Construction, Processing, manufacturing, installation of equipment)
Capital source details
equity
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.Tender package No 02: Building geological survey
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Geological survey, 01 drill hole - Making reports of construction geological surveys
Capital source details
equity
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
3.Tender package No 03: Survey and design construction drawings, construction estimates
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Surveying data collection for construction drawing designs: Technology connection points, technical infrastructure, adjacent works; - Prepare construction drawing records; - Estimation of construction construction, processing, installation of equipment
Capital source details
equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
4.Package 04: Project management consultancy and construction supervision, equipment installation
Tender/ Prequalification Notice ID
Contract execution period
18 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Project management consultancy: Contractor selection, contract, volume, quality, progress, safety, settlement; - Construction supervision consultancy; - Consulting on processing and manufacturing, supplying and installing equipment;
Capital source details
equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
5.Tender package No 05: Examination of estimates, construction drawing design
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Verify the construction drawing design dossier; - Verification of construction cost estimates, supply and installation of equipment
Capital source details
equity
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
6.Tender package No 06: PC - Construction, processing, supply and installation of equipment
Tender/ Prequalification Notice ID
Contract execution period
10 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Construction of works; - Processing and installing tanks; - Supply and install equipment; - Test operation; - Complete the acceptance and handover of the project.
Capital source details
Equity and commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
7.Tender package No 07: Environmental monitoring in the construction phase
Tender/ Prequalification Notice ID
Contract execution period
11 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Monitor environmental indicators in the construction phase as prescribed; - Making dossiers of environmental monitoring reports during the construction process.
Capital source details
equity
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
8.Tender package No 08: Making a plan to prevent chemical incident response
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Making prevention and response to chemical incidents in accordance with the regulations
Capital source details
equity
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
9.Package number 9: Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
11 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Implementing the project insurance in accordance with the provisions of the current construction law and insurance rules
Capital source details
equity
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
10.Package 10: Audit of finalization of completed projects
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Auditing Consulting settlement of completed project investment capital
Capital source details
equity
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
11.Package 11: Verification of completed project settlement
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verify and approve the settlement of the project to complete in accordance with the provisions of Decree 99/2021/ND -CP and of HCM City Industrial Corporation - Vinacomin. Including checking legal records; investment costs; Comments, evaluation, recommendations and other necessary requirements as prescribed
Capital source details
equity
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter IV, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "KHLCNT Nitric acid project". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "KHLCNT Nitric acid project" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 8

You did not use the site, Click here to remain logged. Timeout: 60 second