Bidder Selection Plan

Na Duong II Thermal Power Plant Project

  Watching      

Warning: DauThau.info discovered that this contractor selection plan does not ensure Clause 8, Article 97 Decree 24/2024/ND-CP

-- You will be rewarded if you detect false warnings! See instructions here!

This Contractors Selection Plan data is found on both the old and new Public Procurement systems. The data you are viewing is updated from the new Public Procurement system
Find: 10:23 27/02/2026
Contractor Selection Plan ID
20191205585-04
Publishing time
10:20 27/02/2026
Posting Status
Published
Contractor selection plan name
Na Duong II Thermal Power Plant Project
Project management forms
Another form
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
20190159737-01
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group A
Authority that issues the decision
Tổng công ty Điện lực TKV - CTCP
Approval date
18/05/2023
Approval ID
872/QĐ-ĐLTKV
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Lowest bid price, Publication date, Bidding package information (View changes)

- Change: Publication date (View changes)

- Change: Investor, Approval date, Approval ID, Publication date (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Filter name, Publication date, Bidding package information (View changes)

- Change: Total investment, Publication date, Bidding package information (View changes)

- Change: Investor, Lowest bid price, Highest bid price, Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Notification Type, Notification form, Investor, Classify, Total investment, Lowest bid price, Highest bid price, Decision-making agency, Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 37
1.Tender package No 37: Material quality inspection to verify project quality according to the Investor's requirements
Tender/ Prequalification Notice ID
Contract execution period
30 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2023
Type of contract
All in One
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
2.Tender package No 16: Supply of equipment for construction and installation of coal conveyor system for Na Duong I Thermal Power Plant
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
3.Bidding package No. 27: Prepare bidding documents for EPC bidding package for Main Factory
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2016
Type of contract
All in One
Implementation location
Prequalification
No
4.Tender package No 20: Construction of slag dump
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q3 2024
Type of contract
Fixed unit price
Implementation location
Prequalification
No
5.Tender package No 25: Supervision of construction and installation of Tender package No 19
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
6.Bidding package No. 6: Survey, design of BVTC-DT, prepare bidding documents for staff and operation management area
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q1 2024
Type of contract
All in One
Implementation location
Prequalification
No
7.Tender package No 26: Construction supervision of Tender package No 20
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q3 2024
Type of contract
All in One
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
8.Tender package No 9: Survey and design of BVTC-DT for slag disposal site
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2023
Type of contract
All in One
Implementation location
Prequalification
No
9.Tender package No 19: Supply of equipment, construction and installation of slag conveyor system
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
10.Tender package No 17: Construction of staff and operations management area
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q3 2024
Type of contract
Fixed unit price
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
11.Bidding package No. 35: Audit of completed project settlement
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Implementation location
Prequalification
No
12.Tender package No 38: Inspection and certification of conformity in project quality
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
13.Bidding package 8: Survey and design of BVTC-dt items of slag waste conveyor system
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2023
Type of contract
All in One
Implementation location
Prequalification
No
14.Tender package No 31: Import equipment assessment
Tender/ Prequalification Notice ID
Contract execution period
30 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q1 2024
Type of contract
All in One
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
15.Tender package No 5: Survey, design of BVTC-DT, prepare bidding documents for factory leveling items, construction electrical system, coal supply conveyor system for Na Duong I Thermal Power Plant
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Owner
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2016
Type of contract
All in One
Implementation location
Prequalification
No
16.Bidding package No. 36: Verification of completed project settlement
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Implementation location
Prequalification
No
17.Tender package No 21: Supervision of construction and installation of package 15
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2017
Type of contract
All in One
Implementation location
Prequalification
No
18.Tender package No 23: Supervision of construction and installation of Tender package No 17
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q3 2024
Type of contract
All in One
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
19.Tender package No 15: Factory leveling; Supplying equipment, constructing and installing electrical systems for construction
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the first quarter, 2017
Type of contract
Fixed unit price
Implementation location
Prequalification
No
20.Bidding Tender package No 44: Review and evaluate the need to correct Bidding Documents Bidding Tender package No 28: EPC Package - Main Plant of Na Duong II Thermal Power Plant Project and make corrections of Bidding Documents (if necessary)
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
equity
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
21.Tender package No 10: Verification of BVTC-DT design of factory leveling items, construction electrical system, coal supply conveyor system for Na Duong I Thermal Power Plant
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
equity
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2016
Type of contract
All in One
Implementation location
Cầu Giấy District, City Hà Nội
Implementation location (After merge)
Prequalification
No
22.Bidding package No. 11: Verification of design of TC-DT area for staff and operation management
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
equity
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Implementation location
Cầu Giấy District, City Hà Nội
Implementation location (After merge)
Prequalification
No
23.Tender package No 13: Verification of the design of slag waste pipe conveyor system
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
equity
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Implementation location
Cầu Giấy District, City Hà Nội
Implementation location (After merge)
Prequalification
No
24.Tender package No 14: Verification of design of TCTC-DT slag disposal site
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
equity
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
25.Tender package No 22: Supervision of construction and installation of Tender package No 16
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
26.Tender package No 28: EPC Package - Main Factory
Tender/ Prequalification Notice ID
Contract execution period
30 months
Domestic/ International
International
Bidding method
Directly
Fields
Uncategoried
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q2 2023
Type of contract
All in One
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
27.Tender package No 30: Verification of technical design of the construction of the Main Factory EPC package
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
28.Tender package No 32: Establishing a surface water exploitation and use plan
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
29.Tender package No 33: Prepare a project for discharging waste into water sources
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
30.Tender package No 34: Environmental monitoring and supervision during construction
Tender/ Prequalification Notice ID
Contract execution period
30 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
31.Tender package No 39: Measuring and cadastral mapping to serve the work of BT and site clearance for slag disposal sites
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2022
Type of contract
All in One
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
32.Bidding package No. 41: Prepare power measurement design documents
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter III, 2019
Type of contract
All in One
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
33.Tender package No 42: Prepare documents to connect communication systems and SCADA/EMS; Technical design of relay protection system.
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter III, 2019
Type of contract
All in One
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
34.Bidding package No. 43: Legal consulting - EPC contract
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2019
Type of contract
All in One
Implementation location
Cầu Giấy District, City Hà Nội
Implementation location (After merge)
Prequalification
No
35.Bid package No. 45: Evaluate bid documents and participate in contract negotiations Bid package No. 28: EPC package - Main factory
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Implementation location
Cầu Giấy District, City Hà Nội
Implementation location (After merge)
Prequalification
No
36.Tender package No 29: Technical consulting, construction supervision of Tender package No 28 (EPC package for Main Factory)
Tender/ Prequalification Notice ID
Contract execution period
30 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Equity and debt capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2020
Type of contract
Timed
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No
37.Bidding package No. 46: Prepare documents to convert forest use purposes to other purposes.
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
equity
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Implementation location
Lộc Bình District, Province Lạng Sơn
Implementation location (After merge)
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Na Duong II Thermal Power Plant Project". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Na Duong II Thermal Power Plant Project" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 17