Bidder Selection Plan

Phu Ho Primary School

  Watching  
Project Contractor selection plan Bid award
Find: 14:57 25/06/2024
Contractor Selection Plan ID
PL2400119125-00
Publishing time
14:57 25/06/2024
Posting Status
Published
Contractor selection plan name
Phu Ho Primary School
Bid Solicitor
Project management forms
The investor hires a project management consultant
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2400032263-00
Name of project
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
1 Years
Authority that issues the decision
UBND Huyện Phú VANG
Approval date
20/06/2024
Approval ID
1776/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Tender package No 5 construction costs
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
* Renovating the 2-storey block of Phu Ho Primary School includes the following main items: - Dismantle steel box purlins (40x80x1.8mm) and existing corrugated iron roof. - Replace galvanized purlins (40x80x1.8mm), install new 0.45mm thick square corrugated iron roof + storm-resistant roofing, 0.5mm thick flat corrugated iron roofing, install door on V50x50x5mm steel frame roof + 0.5mm thick flat corrugated iron . - Waterproofing the neck of the roof drainage pipe - Replace 35 sets of S1 windows made of 1.4mm thick xingfa aluminum, 6.38mm thick clear white glass and accessories. - Replace 01 set of doors made of Xingfa aluminum material 1.4mm thick, clear white glass 6.38mm thick and accessories. - Re-plaster the door and repaint without applying 1 primer and 2 coats. - Fabrication and installation of 304 stainless steel handrails to increase the height of the railings in the 1st and 2nd floor hallways and stairs to ensure compliance with standards. - Demolition of tile floors of rooms and first floor hallways, granite steps and re-flooring, ceramic tile steps (60x60cm) - Renew power supply lines and renew lightning protection system. - Some other content according to design documents.
Capital source details
Provincial budget
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Phú Vang District, City Huế
Implementation location (After merge)
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Phu Ho Primary School". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Phu Ho Primary School" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 24

You did not use the site, Click here to remain logged. Timeout: 60 second