Bidder Selection Plan

Plan for contractor selection phase 4 Project: 500 kV transmission station Thai Binh and connection

  Watching      
Find: 14:44 30/09/2025
Contractor Selection Plan ID
PL2500008452-02
Publishing time
14:43 30/09/2025
Posting Status
Published
Contractor selection plan name
Plan for contractor selection phase 4 Project: 500 kV transmission station Thai Binh and connection
Investment objective
- Transmit and release the capacity of electricity centers in the region into the national electricity system. - Additional capacity and reduce the load for 500 kV, 220 kV lines to supply electricity to Thai Binh, Hai Phong and Hung Yen areas. - Enhancing regional electrical system links, improving safety, reliability and stability when operating the regional and national electricity systems. - Reduce power loss in transmission grid, increase the efficiency of electricity production and business of EVN and EVNNPT.
Project management forms
BQLDA major - area
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2400006845-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
2 Years
Authority that issues the decision
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA
Approval date
30/09/2025
Approval ID
259/QĐ-HĐTV
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Investor, Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Filter name, Highest bid price, Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 14
1.Package 9: Provide and transport the most VTTB
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
International
Bidding method
Directly
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Procurement of VTTB is the most in the country and imported, shipping costs, expenses related to customs clearance and storage procedures, testing costs, sealing, lead -clamping equipment.
Capital source details
EVNNPT and loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
October, 2025
Type of contract
All in One
Implementation location
Hưng Hà District, Province Thái Bình
Implementation location (After merge)
Prequalification
No
2.Bidding package 10: Supply and transport horizontal resistance
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
International
Bidding method
Directly
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Supply and transport 3 -phase horizontal compensation, oil type, outdoor, 90mvar capacity, 500kV voltage and accessories for installation before operation. - Safety test resistance - Costs related to customs clearance and storage procedures.
Capital source details
EVNNPT and loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January, 2025
Type of contract
All in One
Implementation location
Hưng Hà District, Province Thái Bình
Implementation location (After merge)
Prequalification
No
3.Bidding package 11: Providing and transporting neutral resistance and limiting short -circuit resistance.
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
International
Bidding method
Directly
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
- Supply and transport neutral resistance 110 kV, limit short -circuit current 245 kV and 35 kV. - Safety testing - Costs related to customs clearance and storage storage
Capital source details
EVNNPT and loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January, 2025
Type of contract
All in One
Implementation location
Hưng Hà District, Province Thái Bình
Implementation location (After merge)
Prequalification
No
4.Package 12: Supply and install online oil monitoring system for transformers and horizontal compensation
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
International
Bidding method
Directly
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply and install online oil monitoring system for 500 kV MBA and 500 kV horizontal compensation
Capital source details
EVNNPT and loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January, 2025
Type of contract
All in One
Implementation location
Hưng Hà District, Province Thái Bình
Implementation location (After merge)
Prequalification
No
5.Package 13: Supply and transport of secondary and secondary schools
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Shopping and transportation of secondary and imported secondary and imported VTTB, VTTB Camera system, expenses related to customs clearance and storage, cost testing meter test
Capital source details
EVNNPT and loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
June, 2025
Type of contract
All in One
Implementation location
Hưng Hà District, Province Thái Bình
Implementation location (After merge)
Prequalification
No
6.Tender package No 14: Providing equipment and software to control computer control system
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Procurement of computer control equipment and software software includes training and technology transfer
Capital source details
EVNNPT and loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
June, 2025
Type of contract
All in One
Implementation location
Hưng Hà District, Province Thái Bình
Implementation location (After merge)
Prequalification
No
7.Package 15: Supply and transport steel columns
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Shopping steel columns for 500 kV and 220 kV lines connected
Capital source details
EVNNPT and loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January, 2025
Type of contract
Fixed unit price
Implementation location
Hưng Hà District, Province Thái Bình
Implementation location (After merge)
Prequalification
No
8.Tender package No 16: Supply and transport of conductors, lightning protection lines
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Procurement of conductors, lightning protection wires for 500 kV and 220 kV lines connected
Capital source details
EVNNPT and loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
June, 2025
Type of contract
All in One
Implementation location
Hưng Hà District, Province Thái Bình
Implementation location (After merge)
Prequalification
No
9.Tender package No 17: Providing and transporting insulation and accessories; Optical cable and accessories; Lightning protection line
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Procurement of insulation and accessories, fiber optic cable and accessories for 500 kV and 220 kV lines connected; Lightning protection for 220 kV connection line
Capital source details
EVNNPT and loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
June, 2025
Type of contract
All in One
Implementation location
Hưng Hà District, Province Thái Bình
Implementation location (After merge)
Prequalification
No
10.Tender package No 18: Construction of transformer stations (including performing tasks on TTLL, supplying and installing fire prevention and fighting systems)
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Building construction items, installation of VTTB TBA, installation and testing and adjusting the information system of information systems, supplying and installing fire prevention and fighting systems.
Capital source details
EVNNPT and loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January, 2025
Type of contract
Fixed unit price
Implementation location
Hưng Hà District, Province Thái Bình
Implementation location (After merge)
Prequalification
No
11.Tender package No 19: Connecting line construction
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Building column foundations, erecting columns, pulling wires and installing 500 kV and 220 kV accessories connected, valve valve correction test for 220 kV connection
Capital source details
EVNNPT and loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January, 2025
Type of contract
Fixed unit price
Implementation location
Hưng Hà District, Province Thái Bình
Implementation location (After merge)
Prequalification
No
12.Tender package No 20: Providing construction supervision consultancy services and equipment installation
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction supervision and equipment installation
Capital source details
EVNNPT
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January, 2025
Type of contract
All in One
Implementation location
Hưng Hà District, Province Thái Bình
Implementation location (After merge)
Prequalification
No
13.Tender package No 21: Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction insurance during construction
Capital source details
EVNNPT
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January, 2025
Type of contract
By percentage
Implementation location
Hưng Hà District, Province Thái Bình
Implementation location (After merge)
Prequalification
No
14.Bidding package No. 9A: Supply and transport 500 kV and accessories
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
International
Bidding method
Directly
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply and transport 500 kV and accessories
Capital source details
EVNNPT and loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
October, 2025
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan for contractor selection phase 4 Project: 500 kV transmission station Thai Binh and connection". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan for contractor selection phase 4 Project: 500 kV transmission station Thai Binh and connection" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 51

You did not use the site, Click here to remain logged. Timeout: 60 second