Bidder Selection Plan

Plan for contractor selection phase Preparation of project Investment component 1: Dredging, improving the environment, building infrastructure of Rach Van Thanh, Thanh My Tay Ward

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 14:45 04/09/2025
Contractor Selection Plan ID
PL2500174919-04
Publishing time
14:42 04/09/2025
Posting Status
Published
Contractor selection plan name
Plan for contractor selection phase Preparation of project Investment component 1: Dredging, improving the environment, building infrastructure of Rach Van Thanh, Thanh My Tay Ward
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Spending Category
Investment and Development Spending
Authority that issues the decision
Ban Quản lý dự án đầu tư xây dựng hạ tầng đô thị TPHCM
Approval date
11/07/2025
Approval ID
291/QĐ-BHTĐT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Publication date, Bidding package information (View changes)

- Change: Publication date (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Publication date (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Publication date (View changes)

- Change: Lowest bid price, Highest bid price, Approval date, Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Filter name, Publication date (View changes)

- Change: Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 6
1.TV1: Terrain survey consultancy (Feasibility study report)
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey of the entire entire canal route on the shore and underwater
Capital source details
Ho Chi Minh City
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
Fixed unit price
Implementation location
Prequalification
No
2.TV2: Geological, hydrological survey consultancy and other surveys (steps to make a feasibility study report); Advice on making feasibility study reports and project information modeling (BIM)
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Surveying geological geological underwater, hydrological, surveying vehicles, measuring existing road surface modules, preparing feasibility study reports and preparing construction information model (BIM)
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Third quarter, 2025
Type of contract
Package and Fixed Price
Implementation location
Prequalification
No
3.TV3: Survey supervision consultant (Feasibility study report)
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervise the survey of topography, geology, hydrology, survey of vehicles, measurement of elastic modules
Capital source details
Budget Ho Chi Minh City
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No
4.TV4: Examination consultant for feasibility research reports
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verification of Feasibility Study Report
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No
5.TV5: Consulting on making Bidding Documents and evaluating Bid Bids Bidding package for geological, hydrological and other surveys (Feasure research reports); Advice on making feasibility study reports and project information modeling (BIM)
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Making Bidding Documents and evaluating Bid Bids Bidding package for geological, hydrological and other surveys (Feasibility study reports); Advice on making feasibility study reports and project information modeling (BIM)
Capital source details
Budget Ho Chi Minh City
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No
6.TV6: Advice on making environmental impact assessment reports
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare environmental impact assessment report
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan for contractor selection phase Preparation of project Investment component 1: Dredging, improving the environment, building infrastructure of Rach Van Thanh, Thanh My Tay Ward". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan for contractor selection phase Preparation of project Investment component 1: Dredging, improving the environment, building infrastructure of Rach Van Thanh, Thanh My Tay Ward" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 26

You did not use the site, Click here to remain logged. Timeout: 60 second