Invest in the installation and replacement of automatic and continuous wastewater monitoring station equipment to serve environmental monitoring, data transmission according to current regulations and ensure the operation of the industrial park's wastewater treatment system.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
QĐ Phê duyệt KHLCNT.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Supply, install equipment, check calibration, perform RA reports, configure, connect and operate automatic and continuous wastewater monitoring equipment system; transmit data to environmental management agencies according to current regulations.
Capital source details
Production and business capital of Hoa Phu Joint Stock Company.
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan for selecting a contractor for the installation and replacement package of automatic and continuous wastewater monitoring station equipment.". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan for selecting a contractor for the installation and replacement package of automatic and continuous wastewater monitoring station equipment." plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.