Bidder Selection Plan

Plan for selecting a design consulting contractor: Investment and construction to increase the static load capacity, replacement of long-standing operating columns on routes 471MH (from column T01 to column T150 and Nr Cambodia), 472MH (from column T01 to column T23 and Mộc Hóa – Rạch Mây axis), 474MH (Nr Bắc Hòa), and 477MH.

  Watching  
Project Contractor selection plan Bid award
Find: 09:35 24/08/2026
Contractor Selection Plan ID
PL2600274380-00
Publishing time
09:34 24/08/2026
Posting Status
Published
Contractor selection plan name
Plan for selecting a design consulting contractor: Investment and construction to increase the static load capacity, replacement of long-standing operating columns on routes 471MH (from column T01 to column T150 and Nr Cambodia), 472MH (from column T01 to column T23 and Mộc Hóa – Rạch Mây axis), 474MH (Nr Bắc Hòa), and 477MH.
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2600059378-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
2 Years
Authority that issues the decision
Công ty Điện lực Tây Ninh
Approval date
22/08/2026
Approval ID
2856/QĐ-PCTN
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Investigate, measure, collect data and set up construction management and construction management
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Conduct investigations and collect data to support the preparation of feasibility studies for construction projects. - Prepare feasibility studies for construction projects.
Capital source details
Basic depreciation capital and commercial credit
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
Is different
Implementation location
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan for selecting a design consulting contractor: Investment and construction to increase the static load capacity, replacement of long-standing operating columns on routes 471MH (from column T01 to column T150 and Nr Cambodia), 472MH (from column T01 to column T23 and Mộc Hóa – Rạch Mây axis), 474MH (Nr Bắc Hòa), and 477MH.". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan for selecting a design consulting contractor: Investment and construction to increase the static load capacity, replacement of long-standing operating columns on routes 471MH (from column T01 to column T150 and Nr Cambodia), 472MH (from column T01 to column T23 and Mộc Hóa – Rạch Mây axis), 474MH (Nr Bắc Hòa), and 477MH." plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 0

You did not use the site, Click here to remain logged. Timeout: 60 second