Bidder Selection Plan

Plan for selecting contractors for construction investment projects upgrading, improving the floor, road surface and segment works Km20+500 - Km37+00, DT.543B, Tuong Duong District, Nghe An Province

  Watching      
Find: 13:27 14/07/2025
Contractor Selection Plan ID
PL2500165083-01
Publishing time
07:38 14/07/2025
Posting Status
Published
Contractor selection plan name
Plan for selecting contractors for construction investment projects upgrading, improving the floor, road surface and segment works Km20+500 - Km37+00, DT.543B, Tuong Duong District, Nghe An Province
Investment objective
In order to enhance the traffic connection of people living around the area of ​​Ban Ve hydroelectricity, Nham Non hydroelectricity and from the communes of Yen Hoa, Yen Na, Luong Minh and Xa Luong of Tuong Duong district to Highway 7 and National Highway 48C to create a driving force for socio -economic development and ensure national defense and security in Tuong Duong district in particular and western districts of Nghe An in general; At the same time, facilitating rescue and rescue in the rainy season and contributing to perfecting the infrastructure of the region and the locality
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500040531-01
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
4 Years
Authority that issues the decision
Uỷ ban nhân dân tỉnh Nghệ An
Approval date
30/06/2025
Approval ID
2016/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 14
1.Package 01: Survey consultancy, construction drawing design and cost estimate
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting survey, design construction drawings and cost estimates
Capital source details
The provincial budget in the medium -term public investment plan to invest in developing socio -economic infrastructure in the western area of Nghe An province: VND 275,000 million (of which the period of 2021-2025 is VND 115,500 million).
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Third quarter, 2025
Type of contract
Package and Fixed Price
Implementation location
Prequalification
No
2.Tender package No 02: Construction of ground clearance piles
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of site clearance piles
Capital source details
The provincial budget in the medium -term public investment plan to invest in developing socio -economic infrastructure in the western area of Nghe An province: VND 275,000 million (of which the period of 2021-2025 is VND 115,500 million).
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No
3.Tender package No 03: Investigate survey, technical plan, estimate of mines clearance
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Investigate surveys, technical plans, estimates of mines clearance
Capital source details
The provincial budget in the medium -term public investment plan to invest in developing socio -economic infrastructure in the western area of Nghe An province: VND 275,000 million (of which the period of 2021-2025 is VND 115,500 million).
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No
4.Tender package No 04: Mine clearance construction
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Mine clearance construction
Capital source details
The provincial budget in the medium -term public investment plan to invest in developing socio -economic infrastructure in the western area of Nghe An province: VND 275,000 million (of which the period of 2021-2025 is VND 115,500 million).
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No
5.Tender package No 05: Construction supervision consultancy
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervision consultancy construction mine clearance
Capital source details
The provincial budget in the medium -term public investment plan to invest in developing socio -economic infrastructure in the western area of Nghe An province: VND 275,000 million (of which the period of 2021-2025 is VND 115,500 million).
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No
6.Package 06: Consulting on valuation of materials for designing and designing the design of BVTC
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on appraisal of material design materials
Capital source details
The provincial budget in the medium -term public investment plan to invest in developing socio -economic infrastructure in the western area of Nghe An province: VND 275,000 million (of which the period of 2021-2025 is VND 115,500 million).
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No
7.Bidding package 07: Consulting on verifying the design of BVTC, estimates and traffic safety steps
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Designing the design of BVTC, estimates and traffic safety steps to design BVTC
Capital source details
The provincial budget in the medium -term public investment plan to invest in developing socio -economic infrastructure in the western area of Nghe An province: VND 275,000 million (of which the period of 2021-2025 is VND 115,500 million).
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No
8.Package 08: Review and determine the current status of forest
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Review and determine the status quo
Capital source details
The provincial budget in the medium -term public investment plan to invest in developing socio -economic infrastructure in the western area of Nghe An province: VND 275,000 million (of which the period of 2021-2025 is VND 115,500 million).
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No
9.Tender package No 09: Construction work
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of works and road traffic safety assurance
Capital source details
The provincial budget in the medium -term public investment plan to invest in developing socio -economic infrastructure in the western area of Nghe An province: VND 275,000 million (of which the period of 2021-2025 is VND 115,500 million).
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
According to adjusted unit price
Implementation location
Prequalification
No
10.Package 10: Consulting on supervision of package number 09
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervision consultant package 09
Capital source details
The provincial budget in the medium -term public investment plan to invest in developing socio -economic infrastructure in the western area of Nghe An province: VND 275,000 million (of which the period of 2021-2025 is VND 115,500 million).
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No
11.Bidding package 11: Construction insurance package number 09
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction insurance package number 09
Capital source details
The provincial budget in the medium -term public investment plan to invest in developing socio -economic infrastructure in the western area of Nghe An province: VND 275,000 million (of which the period of 2021-2025 is VND 115,500 million).
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No
12.Package 12: Consulting on quality inspection of construction works
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on quality accreditation works during the construction process of package 09
Capital source details
The provincial budget in the medium -term public investment plan to invest in developing socio -economic infrastructure in the western area of Nghe An province: VND 275,000 million (of which the period of 2021-2025 is VND 115,500 million).
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No
13.Tender package No 13: Auditing consultancy for completed project settlement report
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on auditing completed project settlement reports
Capital source details
The provincial budget in the medium -term public investment plan to invest in developing socio -economic infrastructure in the western area of Nghe An province: VND 275,000 million (of which the period of 2021-2025 is VND 115,500 million).
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
In the third quarter, 2027
Type of contract
All in One
Implementation location
Prequalification
No
14.Tender package No 14: Traffic safety verification advice before being put into operation
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Traffic safety verification consultant before putting into operation
Capital source details
The provincial budget in the medium -term public investment plan to invest in developing socio -economic infrastructure in the western area of Nghe An province: VND 275,000 million (of which the period of 2021-2025 is VND 115,500 million).
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2027
Type of contract
All in One
Implementation location
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan for selecting contractors for construction investment projects upgrading, improving the floor, road surface and segment works Km20+500 - Km37+00, DT.543B, Tuong Duong District, Nghe An Province". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan for selecting contractors for construction investment projects upgrading, improving the floor, road surface and segment works Km20+500 - Km37+00, DT.543B, Tuong Duong District, Nghe An Province" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 71

You did not use the site, Click here to remain logged. Timeout: 60 second