Bidder Selection Plan

Plan for selecting contractors of construction projects DT.384B (section from the intersection with the road connecting two highways in Hanoi - Hai Phong with Cau Gie - Ninh Binh highway to intersect with DT 378)

  Watching      
Find: 17:31 18/08/2025
Contractor Selection Plan ID
PL2400122346-03
Publishing time
17:29 18/08/2025
Posting Status
Published
Contractor selection plan name
Plan for selecting contractors of construction projects DT.384B (section from the intersection with the road connecting two highways in Hanoi - Hai Phong with Cau Gie - Ninh Binh highway to intersect with DT 378)
Investment objective
Private construction to build a road to perfect the essential transport infrastructure system of the province, facilitate the travel of the people, contributing to promoting socio -economic development in the districts of Yen My, Khoai Chau in particular and Hung Yen province in general.
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2300040856-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
3 Years
Authority that issues the decision
Uỷ ban nhân dân tỉnh Hưng Yên
Approval date
15/08/2025
Approval ID
1316/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Filter name, Investor, Approval date, Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 26
1.Package 1: Eventor, E-HSDT E-HSDT Package for construction of electricity works
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Select the construction unit to move electric works
Capital source details
Provincial budget
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
Is different
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
2.Package 2: Making the task of surveying the construction of BVTC design steps
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Make tasks, update the estimates of the implementation of the KS package to make TK-BVTC
Capital source details
Provincial budget
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
Is different
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
3.Bidding package 3: E-HSMT and E-HSDT assessment of bidding for survey, design and cost estimates
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Select KS Consulting Unit for making TK-BVTC
Capital source details
Provincial budget
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
Is different
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
4.Bidding package 4: E-HSMT and E-HSDT evaluation of construction packages and traffic safety assurance
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Select the construction unit and ensure traffic safety
Capital source details
Provincial budget
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
Is different
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
5.Package 5: E-HSMT and E-HSDT Bidding package of construction works
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Select the construction insurance service provider
Capital source details
Provincial budget
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
Is different
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
6.Bidding package 6: E-HSMT and E-HSDT assessment of bidding package for setting up site deposits
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Select the GPMB pile consulting unit
Capital source details
Provincial budget
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
Is different
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
7.Bidding package 7: E-HSMT and E-HSDT assessment of bidding package for examining the BVTC and estimates
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Select the TK-BVTC Verification Consulting Unit
Capital source details
Provincial budget
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
Is different
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
8.Bidding package 8: Supervision of the survey of BVTC design steps
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Monitor the quality of the work of making TK-BVTC
Capital source details
Provincial budget
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
Is different
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
9.Tender package No 9: Supervision of construction works
Tender/ Prequalification Notice ID
Contract execution period
450 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervision of construction quality
Capital source details
Provincial budget
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
Is different
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
10.Tender package No 10: Monitoring of landmark piles
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Quality monitoring of landmark piles
Capital source details
Provincial budget
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
Is different
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
11.Bidding package 11: Survey consultancy, design of BVTC and EXPLOITE EDUCATION
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Select the electricity -moving design consultancy unit
Capital source details
Provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
12.Package 12: Survey consultancy, design of BVTC and estimate
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Making records of TK-BVTC for construction construction
Capital source details
Provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
13.Package 13: Consulting on verification of BVTC design and construction estimates
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Verification of TK-BVTC records according to current regulations
Capital source details
Provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
14.Tender package No 14: Consulting on plugging in the land clearance pile
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Plug the land clearance pile for land clearance
Capital source details
Provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
15.Package 15: Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
745 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Insurance The incidents of the project
Capital source details
Provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
16.Tender package No 16: Construction of electricity works
Tender/ Prequalification Notice ID
Contract execution period
100 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Select the unit moving the electricity line for land clearance
Capital source details
Provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
17.Tender package No 17: Construction of works and traffic safety
Tender/ Prequalification Notice ID
Contract execution period
380 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of works according to the approved TK-BVTC records
Capital source details
Provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
18.Package 18: Consulting on verification of BVTC design and electricity movement estimates
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Verification of TK-BVTC records moving electric lines according to current regulations
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
19.Tender package No 19: Consulting on supervision of construction of electricity works
Tender/ Prequalification Notice ID
Contract execution period
100 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Quality monitoring construction works moving electricity
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
20.Tender package No 20: Pricing appraisal consultancy for construction estimates
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Evaluation of unit price is not in the price notice
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
21.Tender package No 21: Insurance of construction works moving electric works
Tender/ Prequalification Notice ID
Contract execution period
465 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Insurance The incidents of the project
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
22.Tender package No 22: Electricity and acceptance costs and handover of the line
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Testing and testing of electricity systems
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
23.Tender package No 23: Survey, estimate and construction of mines and bombs and explosives
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Uncategoried
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction and mines exploration of explosive objects for construction work
Capital source details
Provincial budget
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
24.Tender package No 24: Supervision of construction and construction of mines and mines
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Monitoring the quality of construction and clearance of mines and mines explosives
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
25.Tender package No 25: Environmental monitoring and monitoring consultancy
Tender/ Prequalification Notice ID
Contract execution period
450 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Periodically check the impact of the project during the construction process on the surrounding environment
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên
26.Package 26: Traffic safety verification advice before being put into use
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Check the traffic safety work of the project according to current regulations before being put into use
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hưng Yên

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan for selecting contractors of construction projects DT.384B (section from the intersection with the road connecting two highways in Hanoi - Hai Phong with Cau Gie - Ninh Binh highway to intersect with DT 378)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan for selecting contractors of construction projects DT.384B (section from the intersection with the road connecting two highways in Hanoi - Hai Phong with Cau Gie - Ninh Binh highway to intersect with DT 378)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 15

You did not use the site, Click here to remain logged. Timeout: 60 second