Bidder Selection Plan

Project bidding package: Wastewater treatment system phase 2 (Modul 2) - Capacity: 3,000 m3/day, night. At Rach Bap Industrial Park – An Dien Industrial Joint Stock Company

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award

Warning: DauThau.info have found this plan for contractor selection violates the form of bidding as stipulated in Article 37 of Circular No. 08/2022/TT-BKHĐT, specifically: The total number of bidding packages or the total value of online bidding packages is lower than required.

-- You will be rewarded if you detect false warnings! See instructions here!

Find: 14:20 02/11/2022
Contractor Selection Plan ID
PL2200034627-00
Publishing time
09:51 02/11/2022
Posting Status
Published
Contractor selection plan name
Project bidding package: Wastewater treatment system phase 2 (Modul 2) - Capacity: 3,000 m3/day, night. At Rach Bap Industrial Park – An Dien Industrial Joint Stock Company
Name of project
Project: Wastewater treatment system phase 2 (Modul 2) - Capacity: 3,000 m3/day, night. At Rach Bap Industrial Park – An Dien Industrial Joint Stock Company
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Other
Authority that issues the decision
Hội đồng quản trị Công ty Cổ phần Công nghiệp An Điền
Approval date
19/10/2022
Approval ID
09/QĐ-HĐQT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Publication date, Bidding package information (View changes)

- Change: Lowest bid price, Publication date, Bidding package information (View changes)

- Change: Lowest bid price, Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 8
1.Tender package No 9: Supervision of equipment installation
Tender/ Prequalification Notice ID
Contract execution period
450 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
have always been different
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
2.Package 5: Turnkey package Project: Wastewater treatment system phase 2 (Modul 2) - Capacity: 3,000 m3/day, night
Tender/ Prequalification Notice ID
Contract execution period
450 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Uncategoried
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
have always been different
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
3.Tender package No 4: Evaluation of bidding documents and contractor selection results
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
have always been different
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
4.Tender package No 3: Consulting on setting up bid documents and evaluating bids for construction and equipment parts (in the form of turnkey)
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
have always been different
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
5.Package 6: Consultancy on verification of feasibility study report
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
have always been different
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
6.Tender package No 8: Construction supervision
Tender/ Prequalification Notice ID
Contract execution period
450 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
have always been different
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
7.Package 10: Auditing and finalizing the project
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
have always been different
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
8.Tender package No 7: Consultancy and design verification of BVTC
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
have always been different
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Project bidding package: Wastewater treatment system phase 2 (Modul 2) - Capacity: 3,000 m3/day, night. At Rach Bap Industrial Park – An Dien Industrial Joint Stock Company". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Project bidding package: Wastewater treatment system phase 2 (Modul 2) - Capacity: 3,000 m3/day, night. At Rach Bap Industrial Park – An Dien Industrial Joint Stock Company" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 11

Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8550 Projects are waiting for contractors
  • 418 Tender notices posted in the last 24 hours
  • 431 Contractor selection plan posted in the last 24 hours
  • 24860 Tender notices posted in the past month
  • 38641 Contractor selection plan posted in the last month
Consultants are supporting you
You are not logged in.
To view information, please Login or Register if you do not have an account.
Signing up is simple and completely free.
You did not use the site, Click here to remain logged. Timeout: 60 second