The Red Light Road Project (Group 3,4,5) was built to contribute to the travel of the people easily, creating favorable conditions for the transport of goods and trading in the region. At the same time, contributing to promoting economic and social development in the following years.
Project management forms
The investor hires a project management consultant
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
QĐ LCNT đèn đỏ .pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
- Total design length: 292m (the main segment: 184m and the branch of 108m long), the design of the design line follows the existence.
- Wide road surface BM = 1.2m ÷ 4.1m. Sugar structure from the top down:
+ The 1x2 stone concrete pavement 250 thick 100mm
+ Nylon panels against concrete dehydration.
+ Existing concrete road surface.
- Installing traffic signs, road name.
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Red light road (group 3,4,5)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Red light road (group 3,4,5)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.