Bidder Selection Plan

Repairing road beds, internal roads, car floor, rainwater collection system, wastewater, electric lighting outside the house behind; Repair flower beds, drainage, electric lighting outside the house on both sides of the entrance; Leveling, pouring concrete, building a flowerpot planting for 2 lakes in front of the gate of Hai Phong Obstetrics and Gynecology Hospital- Hung Vuong Facility (Facility 2)

  Watching      
Find: 09:26 01/10/2025
Contractor Selection Plan ID
PL2500204124-01
Publishing time
09:25 01/10/2025
Posting Status
Published
Contractor selection plan name
Repairing road beds, internal roads, car floor, rainwater collection system, wastewater, electric lighting outside the house behind; Repair flower beds, drainage, electric lighting outside the house on both sides of the entrance; Leveling, pouring concrete, building a flowerpot planting for 2 lakes in front of the gate of Hai Phong Obstetrics and Gynecology Hospital- Hung Vuong Facility (Facility 2)
Project management forms
The investor hires a project management consultant
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500046288-01
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
150 Date
Authority that issues the decision
BỆNH VIỆN PHỤ SẢN HẢI PHÒNG
Approval date
22/08/2025
Approval ID
807/QĐ-BVPS
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Filter name, Publication date (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 5
1.Tender package No 01: Consulting for E-HSMT preparation, E-HSDT evaluation
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consultancy on preparation and evaluation of tender documents
Capital source details
Hospital's non -business development fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.Package 02: E-HSMT appraisal consultancy, contractor selection
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
E-HSMT appraisal consultancy, contractor selection
Capital source details
Hospital's non -business development fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
3.Package 03: Supervision consultancy
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervision consultancy
Capital source details
Hospital's non -business development fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
4.Tender package No 04: Construction work
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction
Capital source details
Hospital's non -business development fund
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
5.Package 05: Audit consulting
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Audit consulting
Capital source details
Hospital's non -business development fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Repairing road beds, internal roads, car floor, rainwater collection system, wastewater, electric lighting outside the house behind; Repair flower beds, drainage, electric lighting outside the house on both sides of the entrance; Leveling, pouring concrete, building a flowerpot planting for 2 lakes in front of the gate of Hai Phong Obstetrics and Gynecology Hospital- Hung Vuong Facility (Facility 2)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Repairing road beds, internal roads, car floor, rainwater collection system, wastewater, electric lighting outside the house behind; Repair flower beds, drainage, electric lighting outside the house on both sides of the entrance; Leveling, pouring concrete, building a flowerpot planting for 2 lakes in front of the gate of Hai Phong Obstetrics and Gynecology Hospital- Hung Vuong Facility (Facility 2)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 2

You did not use the site, Click here to remain logged. Timeout: 60 second