Bidder Selection Plan

Restoration of irrigation works by technology does not fall

    Watching      
Find: 13:59 25/05/2025
Contractor Selection Plan ID
PL2500127708-00
Publishing time
13:58 25/05/2025
Posting Status
Published
Contractor selection plan name
Restoration of irrigation works by technology does not fall
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500032182-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Other project
Project implementation time
27 Month
Authority that issues the decision
Sở Khoa học và Công nghệ tỉnh Bắc Ninh
Approval date
16/05/2025
Approval ID
170/QĐ-SKHCN
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 4
1.Package 1: Check the quality assessment of concrete sugar on the dike surface corresponding to the types of damage
Tender/ Prequalification Notice ID
Contract execution period
1 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Evaluation at 40 components at risk of damage and 5 components at normal position (5km/ component) as a basis for calculating and assessing the cause of damage
Capital source details
Provincial budget (scientific career)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No
2.Bidding package 2: Experimental mechanical properties of recyclable aggregate from concrete, combined materials and designed concrete design (Mark M15, M20, M25 and M30) for irrigation works
Tender/ Prequalification Notice ID
Contract execution period
8 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Experimental properties of materials: + Sampling and crushing according to the required particle sizes, transferring the crushed aggregate to the laboratory; + Experimental mechanical and chemical properties of recycled aggregate and other materials: fly ash, additives, cement ...; + Summarize and analyze experimental results of other materials combined with recyclable aggregate to manufacture concrete. - Concrete design design: + Researching calculation of concrete composition from recycled aggregate; + Experimental indicators of concrete and concrete mixed mixture from the orientation and classification of the selection; + Summarize and analyze the results of research and manufacture of M15, M20, M25 and M30 concrete concrete using recycled aggregate from discharged concrete.
Capital source details
Provincial budget (scientific career)
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No
3.Package 3: Application of testing technology to restore concrete constructions does not discharged 500m of concrete on dike
Tender/ Prequalification Notice ID
Contract execution period
2 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Research on data collection, technical design, construction drawing design application technology testing for the test road; - Construction of road testing works on the dike: size 500m long, 4m wide road width, expected road surface thickness of 25cm using 250 dmax 20mm concrete.
Capital source details
Provincial budget (scientific career)
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location
Prequalification
No
4.Bidding package 4: Check the quality of concrete sugar after constructing a test work with a non -discharged restoration technology
Tender/ Prequalification Notice ID
Contract execution period
1 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Measure the flat surface of the road - Drill samples and check the strength of the scene concrete
Capital source details
Provincial budget (scientific career)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2026
Type of contract
All in One
Implementation location
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Restoration of irrigation works by technology does not fall". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Restoration of irrigation works by technology does not fall" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 15

You did not use the site, Click here to remain logged. Timeout: 60 second