Bidder Selection Plan

Reviewing Vam Patch stream (from the ceremony to the Cau Vam Bridge)

  Watching      
Find: 14:38 29/08/2025
Contractor Selection Plan ID
PL2500103483-02
Publishing time
14:37 29/08/2025
Posting Status
Published
Contractor selection plan name
Reviewing Vam Patch stream (from the ceremony to the Cau Vam Bridge)
Investment objective
Ensure drainage, overcome flooding, environmental pollution in the area of Vam Patch stream area; create ventilation on both sides of the stream, improve the living environment for people in the area; gradually complete the transport infrastructure, technical infrastructure, create roads along the two sides of the stream; Urban embellishment of Phuoc Vinh urban area to call for investment attraction, attract people to settle down, production and business, ensure the goal of developing Phuoc Vinh urban lifting urban area to grade IV.
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500026165-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
4 Years
Authority that issues the decision
Ban Quản lý dự án đầu tư xây dựng khu vực Phú Giáo
Approval date
26/08/2025
Approval ID
28/QĐ-QLDAKVPG
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Publication date, Bidding package information (View changes)

- Change: Filter name, Investor, Highest bid price, Decision-making agency, Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 23
1.Advice on setting up piles for ground clearance
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Producing and constructing piles on the field, determining the boundaries and scope to clear, accurate and comply with the plan
Capital source details
Phu Giao district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Bình Dương
2.Consulting for making bidding documents (E-HSMT), Evaluation of bids (E-HSDT) Bidding package for survey consultancy, construction design and construction design after basic design
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Make and hand over E-HSMT to investors; Posted on the national bidding network; Open evaluation E-HSDT; Report the evaluation results to the investor; Evaluation process
Capital source details
Phu Giao district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Bình Dương
3.Consulting appraisal of bidding documents; Evaluation of the results of selection of contractors for survey consultancy package, construction design and construction design after basic design
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Appraisal of bidding documents; evaluate the contractor selection results and report the evaluation results to the investor
Capital source details
Phu Giao district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Bình Dương
4.Consulting, surveying, setting up construction design and deploying after basic design
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Establishing BVTC design, making estimates to build works exactly in accordance with current regulations
Capital source details
Phu Giao district budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Bình Dương
5.Advice on supervision of surveying the construction design step after the basic design
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervising topographic survey work
Capital source details
Phu Giao district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Bình Dương
6.Consultancy on verification of construction design and deploying after basic design
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Check design records, check the estimated volume, the correctness of the application of norms and unit prices in accordance with the current regulations
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
7.Consulting on making requests, evaluating dossiers of proposals for bidding packages clearing mines and explosive objects
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Make and hand over E-HSYC to the investor; Posted on the national bidding network; Open evaluation E-HSDX; Report the evaluation results to the investor; Evaluation process
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
8.Consulting on appraisal of required documents; Evaluation of the results of the contractor selection of bidding packages for clearing mines and mines and explosives
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Appraisal of required documents; evaluate the contractor selection results and report the evaluation results to the investor
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
9.Clearing mine, explosive objects
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Clearance of mines and explosives; inspection of works quality assessment; Destroy (if any)
Capital source details
city budget
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
10.Consulting for making bidding documents (E-HSMT), Bidding documents (E-HSDT) Bidding package + Equipment
Tender/ Prequalification Notice ID
Contract execution period
75 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Make and hand over E-HSMT to investors; Posted on the national bidding network; Open evaluation E-HSDT; Report the evaluation results to the investor; Evaluation process
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
11.Consulting appraisal of bidding documents; Evaluation of the results of the contractor selection of construction package + Equipment
Tender/ Prequalification Notice ID
Contract execution period
75 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Appraisal of bidding documents; evaluate the contractor selection results and report the evaluation results to the investor
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
12.Construction + equipment
Tender/ Prequalification Notice ID
Contract execution period
540 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of works in accordance with the approved design documents, current standards, standards and quality assurance
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
13.Consulting for making bidding documents (E-HSMT), Evaluation of bids (E-HSDT) Bidding package for construction supervision consultancy
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Make and hand over E-HSMT to investors; Posted on the national bidding network; Open evaluation E-HSDT; Report the evaluation results to the investor; Evaluation process
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
14.Consulting appraisal of bidding documents; Appraise the results of the contractor selection for construction supervision consultancy package
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Appraisal of bidding documents; evaluate the contractor selection results and report the evaluation results to the investor
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
15.Construction supervision consultancy
Tender/ Prequalification Notice ID
Contract execution period
540 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Monitoring monitoring throughout the construction process of construction contractors to ensure compliance with the approved design documents, current standards and standards
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
16.Consulting to compile bidding documents (E-HSMT), Bidding documents (E-HSDT) Bidding package of works
Tender/ Prequalification Notice ID
Contract execution period
75 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Make and hand over E-HSMT to investors; Posted on the national bidding network; Open evaluation E-HSDT; Report the evaluation results to the investor; Evaluation process
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
17.Consulting appraisal of bidding documents; Evaluation of the results of contractor selection of construction insurance package
Tender/ Prequalification Notice ID
Contract execution period
75 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Appraisal of bidding documents; evaluate the contractor selection results and report the evaluation results to the investor
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
18.Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
540 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Risk insurance during the construction period of works according to compulsory insurance regulations in construction investment activities
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
19.Consulting to prepare bidding documents (E-HSMT), Biddown evaluation (E-HSDT) Auditing package
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Make and hand over E-HSMT to investors; Posted on the national bidding network; Open evaluation E-HSDT; Report the evaluation results to the investor; Evaluation process
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2028
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
20.Consulting appraisal of bidding documents; Evaluation of the results of the contractor selection of auditing bidding package
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Appraisal of bidding documents; evaluate the contractor selection results and report the evaluation results to the investor
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2028
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
21.Audit consulting
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Completed project finalization audit
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2028
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
22.Survey consultancy, construction technical plan and estimate of clearing mines and explosives; Evaluation of plan
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Investigate surveys, prepare technical plans and estimate of clearing mines and explosive objects; Evaluation of plan
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
23.Construction supervision consultant for demining mines and explosives
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervising the clearance of mines and explosives
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Reviewing Vam Patch stream (from the ceremony to the Cau Vam Bridge)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Reviewing Vam Patch stream (from the ceremony to the Cau Vam Bridge)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 6

You did not use the site, Click here to remain logged. Timeout: 60 second