Bidder Selection Plan

Supplementing the contractor selection plan for the project of Infrastructure construction and environmental improvement of Tham Luong - Ben Cat - Nuoc Len canal (connecting Long An province via Cho Dem river and Binh Duong and Dong Nai provinces via Saigon river)

  Watching      
Find: 12:27 01/11/2025
Contractor Selection Plan ID
PL2500276589-00
Publishing time
12:26 01/11/2025
Posting Status
Published
Contractor selection plan name
Supplementing the contractor selection plan for the project of Infrastructure construction and environmental improvement of Tham Luong - Ben Cat - Nuoc Len canal (connecting Long An province via Cho Dem river and Binh Duong and Dong Nai provinces via Saigon river)
Investment objective
- Drainage and drainage, flood prevention and pollution, connecting traffic infrastructure. This is an infrastructure project that serves society and improves the quality of people's lives; At the same time, it lays the foundation for the City's socio-economic development in the future. - Draining rainwater and preventing flooding for an area of ​​14,900 hectares of the region and other related areas. - Urban embellishment and environmental improvement in the project area, enhancing traffic capacity for the North-South axis.
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500055908-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group A
Project implementation time
6 Years
Authority that issues the decision
Ban Quản lý Dự án đầu tư xây dựng hạ tầng đô thị Thành phố Hồ Chí Minh
Approval date
22/10/2025
Approval ID
572/QĐ-BHTĐT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 17
1.TV-21: Consulting on setting up construction survey tasks and designing construction drawings for temporary bridges
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Set up construction survey tasks and step in designing construction drawings of temporary bridges
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.TV-22: Consulting on supervision of construction surveys and design steps for construction drawings of temporary bridges
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervise the construction survey and design steps of construction drawings of temporary bridges
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
3.TV-23: Consulting on surveys, creating construction drawing designs - construction estimates, establishing building model information (BIM) for temporary bridges
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey, create construction drawing designs - construction estimates, establish building model information (BIM) for temporary bridges
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
4.TV-24: Consulting on verification of construction drawing designs - construction estimates of temporary bridges, traffic safety inspection before being put into use
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verifying construction drawing designs - construction estimates of temporary bridges, verifying traffic safety before being put into use
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
5.TV-25: Survey consulting to determine new estimate norms and adjusted estimate norms during the construction process
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey to determine new estimate norms and adjusted estimate norms during the construction process
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
6.TV-26: Consulting on preparing bidding documents and evaluating bids for bidding packages: TV-23, TV-24, TV-25
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on preparing bidding documents and evaluating bids for bidding packages: Consulting on surveys, preparing construction drawing designs - construction estimates, establishing construction model information (BIM) for temporary bridges; Consulting on verifying construction drawing designs - construction estimates of temporary bridges, verifying traffic safety before being put into use; Consulting on surveys to determine new estimate norms and adjusted estimate norms during the construction process
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
7.TV-27: Consulting on verifying and checking measurement data and elevation landmark system of the project
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verify the project's elevation landmark system
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
8.XL-11: Construction of temporary bridges
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of temporary bridges
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
9.TV-28: Consulting on construction supervision of package XL-11
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervise construction of temporary bridges
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
10.PTV-11: Construction insurance for package XL-11
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction insurance for package XL-11
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
11.TV-29: Consulting on preparing bidding documents, evaluating bids for bidding packages XL-11, TV-28
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare bidding documents and evaluate bids for XL-11 and TV-28 packages
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
12.Rent an AIS station
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Rent an AIS station to monitor and supervise dredged mud transportation
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
13.TVD-01: Consulting on preparing bidding documents, evaluating bid documents: EPC bidding package, TVD-04 bidding package
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare bidding documents, evaluate bids: EPC package: relocation, re-establishment of technical infrastructure system; Construction supervision consulting package "Relocation and re-establishment of technical infrastructure system"
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
14.EPC package: Relocation and re-establishment of technical infrastructure system
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Uncategoried
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Establish survey tasks, technical plans for construction survey and construction drawing design phase; Prepare construction drawing designs - construction estimates; Providing materials and equipment; Construction and installation; Construction insurance, handover and closing
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
15.TVD-02: Construction survey supervision consultancy for the construction drawing design phase "Relocation and re-establishment of technical infrastructure system"
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervise construction surveys during the construction drawing design phase
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
16.TVD-03: Consulting on verification of construction drawing design - construction estimate for "Relocation and re-establishment of technical infrastructure system"
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Design of construction drawing drawing - construction cost estimates
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
17.TVD-04: Construction supervision consultancy "Relocation and re-establishment of technical infrastructure system"
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction supervision of "Relocation and re-establishment of technical infrastructure system"
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Supplementing the contractor selection plan for the project of Infrastructure construction and environmental improvement of Tham Luong - Ben Cat - Nuoc Len canal (connecting Long An province via Cho Dem river and Binh Duong and Dong Nai provinces via Saigon river)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Supplementing the contractor selection plan for the project of Infrastructure construction and environmental improvement of Tham Luong - Ben Cat - Nuoc Len canal (connecting Long An province via Cho Dem river and Binh Duong and Dong Nai provinces via Saigon river)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 27

You did not use the site, Click here to remain logged. Timeout: 60 second