Survey, plan, prepare investment policy report, feasibility study report, basic design, construction drawing design Project "Additional flood discharge works of Thac Ba hydroelectric reservoir"
Survey, plan, prepare investment policy report, feasibility study report, basic design, construction drawing design Project "Additional flood discharge works of Thac Ba hydroelectric reservoir"
Survey, plan, prepare investment policy report, feasibility study report, basic design, construction drawing design Project "Additional flood discharge works of Thac Ba hydroelectric reservoir"
Hội đồng quản trị Công ty cổ phần Thủy điện Thác Bà
Approval date
16/10/2025
Approval ID
2115/NQ-TĐTB-HĐQT
Approval Documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
2025_10_16_2115 NQ phe duyet KHLCNT.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Survey, plan, prepare investment policy report, feasibility study report, basic design, construction drawing design Project "Additional flood discharge works of Thac Ba hydroelectric reservoir"
Hydrological survey and calculation; Topographic and geological surveys; Prepare plans and prepare Investment Policy Proposal Report; Prepare a feasibility study report for construction investment and basic design; Prepare construction drawing design (2 steps) for the Thac Ba hydroelectric reservoir flood discharge project addition project.
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Survey, plan, prepare investment policy report, feasibility study report, basic design, construction drawing design Project "Additional flood discharge works of Thac Ba hydroelectric reservoir"". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Survey, plan, prepare investment policy report, feasibility study report, basic design, construction drawing design Project "Additional flood discharge works of Thac Ba hydroelectric reservoir"" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.