Bidder Selection Plan

The project "Automatic fire fighting system for control and equipment room Information information "

  Watching      
Find: 13:44 18/06/2025
Contractor Selection Plan ID
PL2500064928-03
Publishing time
13:42 18/06/2025
Posting Status
Published
Contractor selection plan name
The project "Automatic fire fighting system for control and equipment room Information information "
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500016192-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
2025 Years
Authority that issues the decision
Công ty Thủy điện Hòa Bình
Approval date
31/03/2025
Approval ID
199/QĐ-TĐHB
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Publication date, Bidding package information (View changes)

- Change: Publication date (View changes)

- Change: Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 4
1.Package 2: Supply and install automatic fire fighting system
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply and install automatic fire fighting systems and move, arrange, set and configure equipment for cashew equipment room control and equipment of Hoa Binh hydroelectric plant; Improve the construction part to suit the function of the room.
Capital source details
The own capital of Vietnam Electricity Group
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòa Bình City, Phú Thọ
Implementation location (Before merge)
Hoa Binh province
2.Package 3: Supply and install heat regulator system
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply and install heat regulating system for control equipment and information equipment of Hoa Binh Hydroelectric Plant
Capital source details
The own capital of Vietnam Electricity Group
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòa Bình City, Phú Thọ
Implementation location (Before merge)
Hoa Binh province
3.Package 4: Construction supervision
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction supervision and equipment installation
Capital source details
The own capital of Vietnam Electricity Group
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòa Bình City, Phú Thọ
Implementation location (Before merge)
Hoa Binh province
4.Tender package No 5: Auditing project completed
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Completed project audit
Capital source details
The own capital of Vietnam Electricity Group
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòa Bình City, Phú Thọ
Implementation location (Before merge)
Hoa Binh province

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "The project "Automatic fire fighting system for control and equipment room Information information "". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "The project "Automatic fire fighting system for control and equipment room Information information "" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 9

You did not use the site, Click here to remain logged. Timeout: 60 second