There has been a decision to approve the investment project
Approval date
06/09/2022
Approval ID
3327/QĐ-UBND
Approval Documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
Short appointment of contractors, no pre-qualification domestically, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2022
Contract Type
All in one
Prequalification
No
4.Package 4: Consulting on setting up bidding documents and evaluating bid packages for construction of waiting houses and stations (Including supply and installation of solar energy equipment)
Short appointment of contractors, no pre-qualification domestically, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2022
Contract Type
All in one
Prequalification
No
5.Package 5: Consulting on preparing bid documents and evaluating bid packages Supplying and installing information technology equipment for waiting houses
Short appointment of contractors, no pre-qualification domestically, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Contract Type
All in one
Prequalification
No
6.Package 6: Consulting for appraisal of bidding documents and contractor selection results for the construction package of waiting houses and stations (Including the supply and installation of solar energy equipment)
Short appointment of contractors, no pre-qualification domestically, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2022
Contract Type
All in one
Prequalification
No
7.Package 7: Bidding appraisal consultancy and contractor selection results for the package Supply and installation of information technology equipment for waiting houses
Open bidding, domestic without pre-qualification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Contract Type
All in one
Prequalification
No
10.Package 10: Consulting and supervision for the construction of the waiting house and station (Including the supply and installation of solar energy equipment)
Short appointment of contractors, no pre-qualification domestically, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Contract Type
All in one
Prequalification
No
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Waiting station: 501 modern pick-up and drop-off stops". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Waiting station: 501 modern pick-up and drop-off stops" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.