Repairing waterproofing and roofing of A8 corrugated iron to ensure the overcoming the situation of damage and degradation of items on the roof of the building; Meet the purpose and function of long -term stable use of the project, create conditions for facilities to serve the operation and work of the Center for Technology and Digital Conversion, while ensuring safety for the entire equipment system of the project to build a smart management model at Ho Chi Minh National Academy
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
QĐ 451_0001.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
- The 3rd floor area: Repair of warping doors, repainting the entire 3rd floor wooden doors (except for the studio room window); Peel off the entire outer layer of the house, peel off the indoor plaster layer at some blistering locations; Wall hygiene; Make cracking net between walls and 30cm high floor; Waterproofing with 2 -component waterproofing solution (cement and polymer); The entire wall has peeled 2cm thick, M75 cement mortar; Bait and repainted according to the current color.
- Roof area:
+ Location of concrete roofs in the stairs area: Peel off the entire ceiling plaster layer, sanitized the plastered surface with a mixture of waterproofing additives with 2 components of cement and polymers, baits and paint according to the current color;
+ Lighting roof position: dismantling the current roof, keeping the structure frame, adding additional lighting lights;
+ The corrugated iron roof area: dismantling the entire corrugated iron roof, the structural system of the purlin current status; Install the new structure of the structure of the rafters, purlins, corrugated iron roofs with 3 -layer insulation, 0.45mm thickness, red color according to the current color;
+ Roof drainage system: fitted with 2mm 2mm stainless steel drainage drainage troughs; Dismantling the entire roof drain system, installing new rainwater drainage pipes with PVC D110mm pipes combined with stainless steel barrier D110;
+ Outside the aluminum aluminum aluminum panel PVDF thick 6mm thick. Revoke old corrugated iron roof system
Capital source details
The state budget expenses education - training and non -business development funds
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Waterproofing, corrugated iron roof A8". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Waterproofing, corrugated iron roof A8" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.