Bidder Selection Plan

Waterproofing, corrugated iron roof A8

  Watching      
Find: 17:19 17/10/2025
Contractor Selection Plan ID
PL2500173636-01
Publishing time
17:18 17/10/2025
Posting Status
Published
Contractor selection plan name
Waterproofing, corrugated iron roof A8
Investment objective
Repairing waterproofing and roofing of A8 corrugated iron to ensure the overcoming the situation of damage and degradation of items on the roof of the building; Meet the purpose and function of long -term stable use of the project, create conditions for facilities to serve the operation and work of the Center for Technology and Digital Conversion, while ensuring safety for the entire equipment system of the project to build a smart management model at Ho Chi Minh National Academy
Project management forms
Another form
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500042104-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
2025 Years
Authority that issues the decision
Văn phòng Học viện Chính trị quốc gia Hồ Chí Minh
Approval date
17/10/2025
Approval ID
1037-QĐ/VP
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Highest bid price, Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 5
1.Civil Works
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- The 3rd floor area: Repair of warping doors, repainting the entire 3rd floor wooden doors (except for the studio room window); Peel off the entire outer layer of the house, peel off the indoor plaster layer at some blistering locations; Wall hygiene; Make cracking net between walls and 30cm high floor; Waterproofing with 2 -component waterproofing solution (cement and polymer); The entire wall has peeled 2cm thick, M75 cement mortar; Bait and repainted according to the current color. - Roof area: + Location of concrete roofs in the stairs area: Peel off the entire ceiling plaster layer, sanitized the plastered surface with a mixture of waterproofing additives with 2 components of cement and polymers, baits and paint according to the current color; + Lighting roof position: dismantling the current roof, keeping the structure frame, adding additional lighting lights; + The corrugated iron roof area: dismantling the entire corrugated iron roof, the structural system of the purlin current status; Install the new structure of the structure of the rafters, purlins, corrugated iron roofs with 3 -layer insulation, 0.45mm thickness, red color according to the current color; + Roof drainage system: fitted with 2mm 2mm stainless steel drainage drainage troughs; Dismantling the entire roof drain system, installing new rainwater drainage pipes with PVC D110mm pipes combined with stainless steel barrier D110; + Outside the aluminum aluminum aluminum panel PVDF thick 6mm thick. Revoke old corrugated iron roof system
Capital source details
The state budget expenses education - training and non -business development funds
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
Fixed unit price
Implementation location
Prequalification
No
2.Evaluation of Bidding Documents, evaluation of Bid Bidding package for construction of works
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare and Evaluate Tender documents
Capital source details
The state budget spends on education and training
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No
3.Evaluation of Bidding Documents, Evaluation of results of construction package for construction of works
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Evaluation of bidding documents, evaluation of contractor selection results
Capital source details
The state budget spends on education and training
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No
4.Project management consultancy (the work part is implemented by the project management consultant)
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Manage the construction process
Capital source details
Foundation for career development
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No
5.Supervision of construction bidding packages
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Monitoring the construction process from the start to the acceptance of the collection and putting into use
Capital source details
Foundation for career development
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Waterproofing, corrugated iron roof A8". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Waterproofing, corrugated iron roof A8" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 13

You did not use the site, Click here to remain logged. Timeout: 60 second