Data analysis results of DauThau.info software for bid solicitors BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION as follows:
- Has relationships with 1 project owners.
- Has relationships with 418 contractor.
- Announced 154 investment development project, of which 13 projects have not yet announced the prequalification documents.
- Announced 413 contractor selection plans with a total of 521 bidding packages, of which 322 prequalification documents have not found the investment project.
- Has invited bids for 333 packages (with 400 tender notices), and conducted prequalification for 0 packages.
- There are 20 bidding packages with content that needs clarification.
- Announced the results of 452 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 156 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 65 packages that have not fully posted the contractor selection results. Of these 59 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.89 contractors.
- Breakdown by bidding field: Goods 24.50%, Construction 55.50%, Consultancy 5.00%, Non-consultancy 11.25%, Mixed 3.75%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,650,096,485,258 VND, of which the total winning bid value is: 1,582,588,499,953 VND.
- The savings rate is: 4.09%.
Data analysis results of DauThau.info software for bid solicitors BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION as follows:
- Has relationships with 418 contractor.
- The average number of contractors participating in each bidding package is: 1.89 contractors.
- Proportion of bidding fields: Goods 24.50%, Construction 55.50%, Consulting 5.00%, Non-consulting 11.25%, Mixed 3.75%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,650,096,485,258 VND, in which the total winning value is: 1,582,588,499,953 VND.
- The savings rate is: 4.09%.
This Bid solicitor is also an investor. The analysis results of data for the investor BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION are as follows:
- Is the investor of 154 development investment projects.
- Is the investor of 605 contractor selection plans, of which 357 were self-published, and 248 were published by other entities.
- Is the investor of 623 Tender Notices, of which 400 were self-invited, and 223 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 10 bidding packages, of which 10 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 87.35% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 88.59% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Bắc Ninh (10)
- Provinces before the merger where the contractor has participated in bidding : Undefined (10)
- Has relationships with 1 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 61 bidding packages with 13 roles.
- Name of construction organization: CÔNG TY ĐIỆN LỰC BẮC NINH - CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN BẮC
- Code of capacity certificate of construction activities: 00004192
- Issuer:
- Fields:
⚬ Tư vấn giám sát công tác xây dựng công trình: Công nghiệp
⚬ Tư vấn giám sát lắp đặt thiết bị công trình: Tư vấn giám sát công tác lắp đặt thiết bị vào công trình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng (không bao gồm các nội dung về công nghệ thuộc chuyên ngành điện) công trình đường dây và trạm biến áp, điện mặt trời
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng (không bao gồm các nội dung về công nghệ thuộc chuyên ngành điện) công trình đường dây và trạm biến áp, điện mặt trời
⚬ Thi công lắp đặt thiết bị vào công trình: Thi công công tác lắp đặt thiết bị vào công trình
⚬ Tư vấn quản lý dự án đầu tư xây dựng: Dân dụng, Công nghiệp
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes the plan Minimize incidents due to atmospheric overvoltage on dual-circuit 110kV lines from Son Dong 220kV substation - Son Dong 110kV substation with 2 bidding package .
17/04/2026 15:40
Investor BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted an investment and development project Minimize incidents due to atmospheric overvoltage on dual-circuit 110kV lines from Son Dong 220kV substation - Son Dong 110kV substation.
17/04/2026 15:15
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Hire professional security forces and cleaning services for the headquarters of the Labor Management Team in the South of Song Cau area and the Bac Ninh Labor Union Enterprise. .
- Winning bidder: CÔNG TY CỔ PHẦN AN NINH MIỀN BẮC
17/04/2026 08:54
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Construction supervision and equipment installation in the form Open bidding .
16/04/2026 10:20
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes the plan Contractor selection plan Project: Minimizing incidents due to atmospheric overvoltage of 110kV line in the South of Song Cau area with 2 bidding package .
16/04/2026 10:08
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes the plan Regarding approval of contractor selection plan
Bidding package: Survey consulting, preparation of PAKT-DT Categories: SCL operator
Thuan Thanh Electricity; SCL's open-roof warehouse operates Yen The Electricity. with 1 bidding package .
15/04/2026 10:29
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes the plan Improving the capacity to operate the medium and low voltage power grid, reducing power loss in the southern region of Hiep Hoa Management Team in 2026 with 2 bidding package .
15/04/2026 08:01
Investor BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted an investment and development project Improving the capacity to operate the medium and low voltage power grid, reducing power loss in the southern region of Hiep Hoa Management Team in 2026.
15/04/2026 07:07
Investor BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted an investment and development project Minimize incidents due to atmospheric overvoltage on 110kV lines from 220kV Bac Ninh substation - 110kV Thuan Thanh 6 substation, from A80 Pha Lai thermal power station - 110kV Que Vo 2 and Gia Luong substations.
14/04/2026 10:10
Investor BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted an investment and development project Minimize incidents caused by atmospheric overvoltage on the 110kV line in the South Song Cau area.
14/04/2026 09:09
The data sheet has been partially hidden, to see the full information please Login or Register
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Periodic inspection and calibration of measuring equipment and devices in 2026 .
- Winning bidder: Viet Nam Metrology Institute
07/04/2026 08:28
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Experiment, adjustment .
- Winning bidder: BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION
24/01/2026 17:22
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Procurement of camera and scada image monitoring equipment for 110kV substations in Bac Ninh province .
- Winning bidder: AN BINH TECHNICAL COMMERCIAL SERVICES JOINT STOCK COMPANY
29/12/2025 14:22
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Buy a pair of boxes to serve project management work in December 2025 .
- Winning bidder: DUC MINH CHAU TRADING INVESTMENT COMPA NY LIMITED
17/12/2025 09:09
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Bidding package: Purchasing a DCU to serve meter measurement work .
- Winning bidder: HUU HONG MACHINERY JOINT STOCK COMPANY
15/12/2025 11:19
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Bidding package: Purchasing a data concentrator to serve production and business .
- Winning bidder: NAM THANH TELECOMMUNICATION JOINT STOCK COMPANY
14/12/2025 09:48
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Repairing OT network system firewall equipment at 110kV substations in the North Song Cau area and hiring to inspect, evaluate and manage information security risks; Review and clean malicious code with information systems at Bac Ninh Electricity Company .
- Winning bidder: VIETTEL CYBER SECURITY ONE MEMBER LIMITED LIABILITY COMPANY
09/12/2025 14:19
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Procurement of computers and printers to serve in arranging a new workplace for the Project Management Board .
- Winning bidder: Thanh Long Joint Stock Company
26/11/2025 14:56
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Bidding package: Buying gifts to thank customers in 2025 .
- Winning bidder: LAM GIA BAO PRINTING SERVICE TRADING PRODUCTION COMPANY LIMITED
24/11/2025 14:27
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Procurement of office equipment .
- Winning bidder: FVT TECHNOLOGY SOLUTIONS AND DISTRIBUTION COMPANY LIMITED
19/11/2025 15:28
The data sheet has been partially hidden, to see the full information please Login or Register
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes the plan Minimize incidents due to atmospheric overvoltage on dual-circuit 110kV lines from Son Dong 220kV substation - Son Dong 110kV substation with 2 bidding package .
17/04/2026 15:40
Investor BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted an investment and development project Minimize incidents due to atmospheric overvoltage on dual-circuit 110kV lines from Son Dong 220kV substation - Son Dong 110kV substation.
17/04/2026 15:15
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION announced the results of the bid package Hire professional security forces and cleaning services for the headquarters of the Labor Management Team in the South of Song Cau area and the Bac Ninh Labor Union Enterprise. .
- Winning bidder: CÔNG TY CỔ PHẦN AN NINH MIỀN BẮC
17/04/2026 08:54
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes Tender Notice Construction supervision and equipment installation in the form Open bidding .
16/04/2026 10:20
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes the plan Contractor selection plan Project: Minimizing incidents due to atmospheric overvoltage of 110kV line in the South of Song Cau area with 2 bidding package .
16/04/2026 10:08
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes the plan Regarding approval of contractor selection plan
Bidding package: Survey consulting, preparation of PAKT-DT Categories: SCL operator
Thuan Thanh Electricity; SCL's open-roof warehouse operates Yen The Electricity. with 1 bidding package .
15/04/2026 10:29
BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION publishes the plan Improving the capacity to operate the medium and low voltage power grid, reducing power loss in the southern region of Hiep Hoa Management Team in 2026 with 2 bidding package .
15/04/2026 08:01
Investor BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted an investment and development project Improving the capacity to operate the medium and low voltage power grid, reducing power loss in the southern region of Hiep Hoa Management Team in 2026.
15/04/2026 07:07
Investor BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted an investment and development project Minimize incidents due to atmospheric overvoltage on 110kV lines from 220kV Bac Ninh substation - 110kV Thuan Thanh 6 substation, from A80 Pha Lai thermal power station - 110kV Que Vo 2 and Gia Luong substations.
14/04/2026 10:10
Investor BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted an investment and development project Minimize incidents caused by atmospheric overvoltage on the 110kV line in the South Song Cau area.
14/04/2026 09:09
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted 413 of the contractor selection plan, which contains 521 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted 400 Tender Notices in 333 bidding packages. Among these, 400 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has posted 452 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 452 package, canceled the bid 0 package (among the bidding packages above).
- There are 156 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has a relationship with 418 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has a relationship with 35 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity BAC NINH POWER COMPANY - BRANCH OF NORTHERN POWER CORPORATION has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects