Data analysis results of DauThau.info software for bid solicitors CAM RANH INTERNATIONAL AIRPORT as follows:
- Has relationships with 1 project owners.
- Has relationships with 82 contractor.
- Announced 27 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 124 contractor selection plans with a total of 189 bidding packages, of which 105 prequalification documents have not found the investment project.
- Has invited bids for 54 packages (with 56 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 158 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 114 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 30 packages that have not fully posted the contractor selection results. Of these 30 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.42 contractors.
- Breakdown by bidding field: Goods 44.64%, Construction 35.71%, Consultancy 1.79%, Non-consultancy 17.86%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 148,018,242,044 VND, of which the total winning bid value is: 141,200,969,489 VND.
- The savings rate is: 4.61%.
Data analysis results of DauThau.info software for bid solicitors CAM RANH INTERNATIONAL AIRPORT as follows:
- Has relationships with 82 contractor.
- The average number of contractors participating in each bidding package is: 1.42 contractors.
- Proportion of bidding fields: Goods 44.64%, Construction 35.71%, Consulting 1.79%, Non-consulting 17.86%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 148,018,242,044 VND, in which the total winning value is: 141,200,969,489 VND.
- The savings rate is: 4.61%.
This Bid solicitor is also an investor. The analysis results of data for the investor CAM RANH INTERNATIONAL AIRPORT are as follows:
- Is the investor of 27 development investment projects.
- Is the investor of 170 contractor selection plans, of which 106 were self-published, and 64 were published by other entities.
- Is the investor of 73 Tender Notices, of which 56 were self-invited, and 17 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Investor CAM RANH INTERNATIONAL AIRPORT has posted an investment and development project Provide 1 seven-seat vehicle for Cam Ranh International Airport..
28/08/2026 09:09
CAM RANH INTERNATIONAL AIRPORT publishes the plan The bidding plan for contract package number 1, "Technical and Economic Survey," and contract package number 2, "Review of Technical and Economic Reports," within the project "Repair and Maintenance of ILS/DME Navigation Tower, NDB Station, T3, T4, T5, T6 Substations, and Perimeter Fence around T1, T2 Power Source – Cam Ranh International Airport" with 2 bidding package .
24/08/2026 16:28
CAM RANH INTERNATIONAL AIRPORT publishes the plan bid selection plan for package 3: "Construction of Buildings" and package 4: "Construction Supervision Consulting" under the project: "Repair and Completion of the Northwest and Southwest Security Perimeter Road - Cam Ranh International Airport" with 2 bidding package .
24/08/2026 11:29
Investor CAM RANH INTERNATIONAL AIRPORT has posted an investment and development project Repair and completion of the security perimeter fence for the northern and southern airport areas – Cam Ranh International Airport..
24/08/2026 11:11
CAM RANH INTERNATIONAL AIRPORT announced the results of the bid package Package 4 "Construction supervision" .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ TƯ VẤN THIẾT KẾ XÂY DỰNG TÀI NHÂN
19/08/2026 09:11
CAM RANH INTERNATIONAL AIRPORT publishes Tender Notice Tender package No 3 "Construction and painting of runways and taxiways" in the form Open bidding .
14/08/2026 11:25
CAM RANH INTERNATIONAL AIRPORT publishes Tender Notice Installing an air conditioning system for the area along the Boarding corridor to the aircraft and the telescopic bridge area leading passengers to terminals 52 and 53 at Cam Ranh International Airport in the form Competitive Offer .
10/08/2026 13:58
CAM RANH INTERNATIONAL AIRPORT publishes Tender Notice Replacing tires for Rosenbauer fire trucks, Supervisory Board: CXR 12101 and CXR 12102 at Cam Ranh International Airport in the form Open bidding .
07/08/2026 15:08
CAM RANH INTERNATIONAL AIRPORT publishes the plan Maintenance of runway and taxiway signal painting in 2026 - Cam Ranh International Airport with 2 bidding package .
04/08/2026 14:39
CAM RANH INTERNATIONAL AIRPORT announced the results of the bid package Package 4 "Construction supervision" .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ TƯ VẤN THIẾT KẾ XÂY DỰNG TÀI NHÂN
29/07/2026 09:48
The data sheet has been partially hidden, to see the full information please Login or Register
CAM RANH INTERNATIONAL AIRPORT announced the results of the bid package Package 4 "Construction supervision" .
- Winning bidder: Công ty TNHH H79
13/10/2025 11:36
CAM RANH INTERNATIONAL AIRPORT announced the results of the bid package Package No. 3 "Construction construction" .
- Winning bidder: Công ty TNHH xây dựng Mỹ Ca
13/10/2025 11:33
CAM RANH INTERNATIONAL AIRPORT publishes the plan Contractor selection plan for the project "Mowing grass and clearing the airport area for the first time in 2024 - Cam Ranh International Airport" with 2 bidding package .
13/10/2025 11:30
CAM RANH INTERNATIONAL AIRPORT announced the results of the bid package Bidding package No. 2: "Verification of technical and economic report documents" .
- Winning bidder: Công ty TNHH xây dựng Kiến Việt
13/10/2025 10:50
CAM RANH INTERNATIONAL AIRPORT announced the results of the bid package Bidding package 1 "Survey and make economic and technical reports" .
- Winning bidder: Công ty TNHH H79
13/10/2025 10:47
CAM RANH INTERNATIONAL AIRPORT publishes the plan Contractor selection plan for package No. 1 "Survey and preparation of technical-economic report", package No. 2 "Verification of technical-economic report documents" under the project "Mowing grass and clearing the airfield for the first time in 2024 - Cam Ranh International Airport" with 2 bidding package .
13/10/2025 10:44
CAM RANH INTERNATIONAL AIRPORT announced the results of the bid package Package 4 "Construction supervision" .
- Winning bidder: Công ty TNHH H79
13/10/2025 10:00
CAM RANH INTERNATIONAL AIRPORT announced the results of the bid package Package No. 3 "Construction construction" .
- Winning bidder: CÔNG TY CỔ PHẦN XD VÀ TM TẤN SANG
13/10/2025 09:57
CAM RANH INTERNATIONAL AIRPORT publishes the plan Contractor selection plan for the project "Renovating and expanding the cargo screening area - Cam Ranh International Airport" with 2 bidding package .
13/10/2025 09:52
CAM RANH INTERNATIONAL AIRPORT announced the results of the bid package Package 2 "Examining the dossier of economic and technical reports" .
- Winning bidder: Công ty TNHH xây dựng Kiến Việt
13/10/2025 09:41
The data sheet has been partially hidden, to see the full information please Login or Register
Investor CAM RANH INTERNATIONAL AIRPORT has posted an investment and development project Provide 1 seven-seat vehicle for Cam Ranh International Airport..
28/08/2026 09:09
CAM RANH INTERNATIONAL AIRPORT publishes the plan The bidding plan for contract package number 1, "Technical and Economic Survey," and contract package number 2, "Review of Technical and Economic Reports," within the project "Repair and Maintenance of ILS/DME Navigation Tower, NDB Station, T3, T4, T5, T6 Substations, and Perimeter Fence around T1, T2 Power Source – Cam Ranh International Airport" with 2 bidding package .
24/08/2026 16:28
CAM RANH INTERNATIONAL AIRPORT publishes the plan bid selection plan for package 3: "Construction of Buildings" and package 4: "Construction Supervision Consulting" under the project: "Repair and Completion of the Northwest and Southwest Security Perimeter Road - Cam Ranh International Airport" with 2 bidding package .
24/08/2026 11:29
Investor CAM RANH INTERNATIONAL AIRPORT has posted an investment and development project Repair and completion of the security perimeter fence for the northern and southern airport areas – Cam Ranh International Airport..
24/08/2026 11:11
CAM RANH INTERNATIONAL AIRPORT announced the results of the bid package Package 4 "Construction supervision" .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ TƯ VẤN THIẾT KẾ XÂY DỰNG TÀI NHÂN
19/08/2026 09:11
CAM RANH INTERNATIONAL AIRPORT publishes Tender Notice Tender package No 3 "Construction and painting of runways and taxiways" in the form Open bidding .
14/08/2026 11:25
CAM RANH INTERNATIONAL AIRPORT publishes Tender Notice Installing an air conditioning system for the area along the Boarding corridor to the aircraft and the telescopic bridge area leading passengers to terminals 52 and 53 at Cam Ranh International Airport in the form Competitive Offer .
10/08/2026 13:58
CAM RANH INTERNATIONAL AIRPORT publishes Tender Notice Replacing tires for Rosenbauer fire trucks, Supervisory Board: CXR 12101 and CXR 12102 at Cam Ranh International Airport in the form Open bidding .
07/08/2026 15:08
CAM RANH INTERNATIONAL AIRPORT publishes the plan Maintenance of runway and taxiway signal painting in 2026 - Cam Ranh International Airport with 2 bidding package .
04/08/2026 14:39
CAM RANH INTERNATIONAL AIRPORT announced the results of the bid package Package 4 "Construction supervision" .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ TƯ VẤN THIẾT KẾ XÂY DỰNG TÀI NHÂN
29/07/2026 09:48
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s CAM RANH INTERNATIONAL AIRPORT has posted 124 of the contractor selection plan, which contains 189 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor CAM RANH INTERNATIONAL AIRPORT has posted 56 Tender Notices in 54 bidding packages. Among these, 56 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CAM RANH INTERNATIONAL AIRPORT has posted 158 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 158 package, canceled the bid 0 package (among the bidding packages above).
- There are 114 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor CAM RANH INTERNATIONAL AIRPORT has a relationship with 82 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CAM RANH INTERNATIONAL AIRPORT has a relationship with 13 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity CAM RANH INTERNATIONAL AIRPORT has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects