Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 as follows:
- Has relationships with 2 project owners.
- Has relationships with 39 contractor.
- Announced 11 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 65 contractor selection plans with a total of 70 bidding packages, of which 52 prequalification documents have not found the investment project.
- Has invited bids for 12 packages (with 12 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 46 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 34 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 30 packages that have not fully posted the contractor selection results. Of these 28 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.50 contractors.
- Breakdown by bidding field: Goods 66.67%, Construction 8.33%, Consultancy 25.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 70,927,593,126 VND, of which the total winning bid value is: 66,283,685,774 VND.
- The savings rate is: 6.55%.
Data analysis results of DauThau.info software for bid solicitors POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 as follows:
- Has relationships with 39 contractor.
- The average number of contractors participating in each bidding package is: 2.50 contractors.
- Proportion of bidding fields: Goods 66.67%, Construction 8.33%, Consulting 25.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 70,927,593,126 VND, in which the total winning value is: 66,283,685,774 VND.
- The savings rate is: 6.55%.
This Bid solicitor is also an investor. The analysis results of data for the investor POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 are as follows:
- Is the investor of 11 development investment projects.
- Is the investor of 64 contractor selection plans, of which 37 were self-published, and 27 were published by other entities.
- Is the investor of 12 Tender Notices, of which 7 were self-invited, and 5 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 913 bidding packages, of which 730 were won, 144 were lost, 24 are pending results, and 15 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 13.99% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 100.35% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (157), Lai Châu (47), Phú Thọ (43), Nghệ An (38), Đà Nẵng (37), Lâm Đồng (28), Sơn La (28), Gia Lai (27), Quảng Ninh (26), Lào Cai (25), TP.Hồ Chí Minh (22), Thanh Hoá (21), Tuyên Quang (18), Bắc Ninh (18), Thái Nguyên (17), Hải Phòng (16), Đồng Nai (16), Đắk Lắk (15), Ninh Bình (14), Quảng Ngãi (12), Cần Thơ (12), Hưng Yên (12), Quảng Trị (8), Vĩnh Long (7), Lạng Sơn (6), Hà Tĩnh (5), Khánh Hòa (4), Nationwide (3), Điện Biên (3), Huế (1), Tây Ninh (1), Undefined (281)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (157), Lai Châu (47), Nghệ An (38), Sơn La (28), Quảng Ninh (26), Gia Lai (23), Hòa Bình (23), Thanh Hoá (21), Lâm Đồng (19), Đà Nẵng (15), Quảng Nam (15), Tuyên Quang (14), Yên Bái (14), Thái Nguyên (13), Kon Tum (11), TP.Hồ Chí Minh (11), Phú Yên (10), Bình Phước (9), Bình Thuận (8), Hải Dương (7), Trà Vinh (7), Cần Thơ (7), Lạng Sơn (6), Bắc Giang (6), Hà Tĩnh (5), Vĩnh Phúc (5), Lào Cai (5), Thái Bình (5), Bà Rịa - Vũng Tàu (4), Ninh Thuận (4), Đắk Lắk (4), Đồng Nai (4), Bắc Ninh (4), Hưng Yên (4), Quảng Bình (4), Nam Định (4), Hải Phòng (4), Quảng Trị (4), Bình Định (3), Phú Thọ (3), Điện Biên (3), Bình Dương (2), Hà Nam (2), Sóc Trăng (2), Nationwide (2), Hà Giang (2), Hậu Giang (2), Huế (1), Ninh Bình (1), Quảng Ngãi (1), Undefined (344)
- Has relationships with 142 Bid Solicitors
- Has relationships with 106 Bid Investors
- Has competed against 140 contractors in 327 bidding packages, won 164 packages, lost 144 packages, 11 are pending results, and 8 were canceled.
- Has collaborated with 48 contractors in 92 bidding packages, won 71 packages, lost 16 packages, 2 are pending results, and 3 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 687 bidding packages with 63 roles.
- Name of construction organization: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN 1
- Code of capacity certificate of construction activities: 00004090
- Issuer: Sở kế hoạch và đầu tư Thành phố Hà Nội
- Fields:
⚬ Khảo sát xây dựng: Địa hình,Địa chất công trình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Công nghiệp (Năng lượng)
⚬ Giám sát thi công xây dựng công trình: Công nghiệp (Năng lượng)
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thủy lợi
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 announced the results of the bid package Bid Package 01 – Purchase of software for financial and accounting work .
- Winning bidder: FAST SOFTWARE JOINT STOCK COMPANY
24/08/2026 16:41
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 publishes the plan Regarding the approval of the Procurement Plan:
Budget for procurement: Purchase software for financial and accounting work. with 1 bidding package .
24/08/2026 16:31
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 publishes the plan Regarding the approval of the Procurement Plan:
Budget for procurement: Purchase software for financial and accounting work. with 1 bidding package .
24/08/2026 09:24
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 publishes the plan Regarding the approval of the Procurement Plan:
Budget for procurement: Purchase software for financial and accounting work. with 1 bidding package .
24/08/2026 09:02
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 announced the results of the bid package Procurement Package KT-04: Financial Statement Audit Services for 2026 .
- Winning bidder: AN VIET AUDITING COMPANY LIMITED
19/08/2026 14:33
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 publishes the plan Regarding the approval of the Procurement Plan
Financial Audit Report for 2026 with 1 bidding package .
19/08/2026 14:11
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 announced the results of the bid package VTTB-01 .
- Winning bidder: INFORMATION TECHNOLOGY AND ELECTRICAL ENGINEERING COMPANY LIMITED
13/08/2026 10:38
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 announced the results of the bid package Purchasing 02 7-seat Fortuner cars .
- Winning bidder: TOYOTA THANHXUAN COMPANY LIMITED
10/08/2026 18:27
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 publishes the plan Regarding the approval of the contractor selection results Package: Procurement of materials and equipment for Song Bung 5 Hydropower Plant with 1 bidding package .
05/08/2026 14:39
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 publishes Tender Notice Purchasing 02 7-seat Fortuner cars in the form Competitive Offer .
30/07/2026 18:36
The data sheet has been partially hidden, to see the full information please Login or Register
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 publishes the plan Contractor selection plan
Package 1: Buy 24 -channel seismic recording machine with attached equipment
Bidding package 2: Making Bidding Documents, evaluating Bid dossier with 2 bidding package .
15/12/2025 09:48
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 publishes the plan Contractor selection plan
Package 1: Buy 24 -channel seismic recording machine with attached equipment
Bidding package 2: Making Bidding Documents, evaluating Bid dossier with 2 bidding package .
25/08/2025 09:21
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 publishes the plan Browse the contractor selection plan
Bidding package 1: Buy satellite navigation machine, all -mirrorless dualators, drones
Bidding package 2: Making Bidding Documents, evaluating Bid dossier with 2 bidding package .
07/08/2025 09:07
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 announced the results of the bid package KH: SCLH1-01 Supplying materials and technical services for large repair work of machine No. 01 - Song Bung POW 5 .
- Winning bidder: A VUONG HYDROPOWER JOINT STOCK COMPANY, CÔNG TY TNHH MỘT THÀNH VIÊN PHAN SƠN GIA LAI
27/05/2025 16:01
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 publishes the plan Browse the contractor selection plan
Bidding package 1: Buy satellite navigation machine, all -mirrorless dualators, drones
Bidding package 2: Making Bidding Documents, evaluating Bid dossier with 2 bidding package .
19/05/2025 10:00
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 publishes the plan Contractor selection plan
Package 1: Buy 24 -channel seismic recording machine with attached equipment
Bidding package 2: Making Bidding Documents, evaluating Bid dossier with 2 bidding package .
19/05/2025 09:38
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 announced the results of the bidding package KH: SCLH1-01 Supplying materials and technical services for large repair work of machine No. 01 - Song Bung POW 5 with 1 participating contractors .
07/05/2025 09:33
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 publishes Tender Notice KH: SCLH1-01 Supplying materials and technical services for large repair work of machine No. 01 - Song Bung POW 5 in the form Open bidding .
19/04/2025 15:25
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 announced the results of the bid package Providing materials, equipment and technical services for repairing downstream bridge cranes - Song Bung 5 Hydropower Plant
(KH: CTHL-01) .
- Winning bidder: DAIHAN MECHANICAL AND ERECTION JOINT STOCK COMPANY
17/04/2025 10:07
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 publishes the plan Contractor selection plan
Category: Large repair of machine unit No. 01- Song Bung Hydroelectric Plant 5 with 2 bidding package .
09/04/2025 10:07
The data sheet has been partially hidden, to see the full information please Login or Register
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 announced the results of the bid package Bid Package 01 – Purchase of software for financial and accounting work .
- Winning bidder: FAST SOFTWARE JOINT STOCK COMPANY
24/08/2026 16:41
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 publishes the plan Regarding the approval of the Procurement Plan:
Budget for procurement: Purchase software for financial and accounting work. with 1 bidding package .
24/08/2026 16:31
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 publishes the plan Regarding the approval of the Procurement Plan:
Budget for procurement: Purchase software for financial and accounting work. with 1 bidding package .
24/08/2026 09:24
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 publishes the plan Regarding the approval of the Procurement Plan:
Budget for procurement: Purchase software for financial and accounting work. with 1 bidding package .
24/08/2026 09:02
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 announced the results of the bid package Procurement Package KT-04: Financial Statement Audit Services for 2026 .
- Winning bidder: AN VIET AUDITING COMPANY LIMITED
19/08/2026 14:33
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 publishes the plan Regarding the approval of the Procurement Plan
Financial Audit Report for 2026 with 1 bidding package .
19/08/2026 14:11
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 announced the results of the bid package VTTB-01 .
- Winning bidder: INFORMATION TECHNOLOGY AND ELECTRICAL ENGINEERING COMPANY LIMITED
13/08/2026 10:38
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 announced the results of the bid package Purchasing 02 7-seat Fortuner cars .
- Winning bidder: TOYOTA THANHXUAN COMPANY LIMITED
10/08/2026 18:27
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 publishes the plan Regarding the approval of the contractor selection results Package: Procurement of materials and equipment for Song Bung 5 Hydropower Plant with 1 bidding package .
05/08/2026 14:39
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 publishes Tender Notice Purchasing 02 7-seat Fortuner cars in the form Competitive Offer .
30/07/2026 18:36
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 has posted 65 of the contractor selection plan, which contains 70 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 has posted 12 Tender Notices in 12 bidding packages. Among these, 5 Tender Notices were self-invited, and 7 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 has posted 46 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 46 package, canceled the bid 0 package (among the bidding packages above).
- There are 34 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 has a relationship with 39 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 has a relationship with 2 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 has a relationship with 4 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects