Data analysis results of DauThau.info software for bid solicitors SONG DA 4 JOINT STOCK COMPANY as follows:
- Has relationships with 1 project owners.
- Has relationships with 9 contractor.
- Announced 2 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 17 contractor selection plans with a total of 46 bidding packages, of which 15 prequalification documents have not found the investment project.
- Has invited bids for 15 packages (with 15 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 14 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 11 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 44 packages that have not fully posted the contractor selection results. Of these 44 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 26,135,010,000 VND, of which the total winning bid value is: 25,360,185,000 VND.
- The savings rate is: 2.96%.
Data analysis results of DauThau.info software for bid solicitors SONG DA 4 JOINT STOCK COMPANY as follows:
- Has relationships with 9 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 26,135,010,000 VND, in which the total winning value is: 25,360,185,000 VND.
- The savings rate is: 2.96%.
This Bid solicitor is also an investor. The analysis results of data for the investor SONG DA 4 JOINT STOCK COMPANY are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 18 contractor selection plans, of which 16 were self-published, and 2 were published by other entities.
- Is the investor of 1 Tender Notices, of which 1 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 5 bidding packages, of which 3 were won, 2 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 77.95% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 81.51% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Gia Lai (1), Vĩnh Long (1), Undefined (3)
- Provinces before the merger where the contractor has participated in bidding : Gia Lai (1), Trà Vinh (1), Undefined (3)
- Has relationships with 4 Bid Solicitors
- Has competed against 11 contractors in 2 bidding packages, won 0 packages, lost 2 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 2 contractors in 2 bidding packages, won 1 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Name of construction organization: CÔNG TY CỔ PHẦN SÔNG ĐÀ 4
- Code of capacity certificate of construction activities: 00019379
- Issuer: Sở kế hoạch đầu tư
- Fields:
⚬ Thi công xây dựng công trình: NN&PTNTThủy lợi
⚬ Thi công xây dựng công trình: NN&PTNT Thủy lợi
⚬ Thi công xây dựng công trình: Công nghiệp (năng lượng, vật liệu xây dựng)
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình đường bộ.
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình cầu.
⚬ Thi công xây dựng công trình: Dân dụng
⚬ Thi công lắp đặt thiết bị vào công trình:
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: Dân dụng
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor SONG DA 4 JOINT STOCK COMPANY has posted the results of the bidding package Package 01: Procurement of 01 Toyota Land Cruiser Parado VX of the investor SONG DA 4 JOINT STOCK COMPANY.
14/03/2019 16:07
Bid solicitor SONG DA 4 JOINT STOCK COMPANY has posted Tender Notice Package 01: Procurement of 01 Toyota Land Cruiser Parado VX of the investor SONG DA 4 JOINT STOCK COMPANY with the form National Competitive Bidding.
22/02/2019 14:57
Investor SONG DA 4 JOINT STOCK COMPANY has posted an investment and development project Investment project of pickup trucks for operation management of Song Da Branch 405.
20/02/2019 07:00
The Bid solicitor SONG DA 4 JOINT STOCK COMPANY has posted the results of the bidding package Package 01: Procurement of 01 car Ford Ranger Wildtrak 2.0L AT4x4 of the investor SONG DA 4 JOINT STOCK COMPANY.
03/12/2018 19:23
The Bid solicitor SONG DA 4 JOINT STOCK COMPANY has posted the request Investment project of pickup trucks for operation management of Song Da Branch 405 of the investor SONG DA 4 JOINT STOCK COMPANY with 1 bidding package.
15/11/2018 10:09
Investor SONG DA 4 JOINT STOCK COMPANY has posted an investment and development project Investment project of pickup trucks for operation management of Song Da Branch 405.
15/11/2018 07:00
The Bid solicitor SONG DA 4 JOINT STOCK COMPANY has posted the results of the bidding package Package No. 01 "Training of human resources". (Posted on the bidding newspaper No. 01 on January 2, 2018) of the investor SONG DA 4 JOINT STOCK COMPANY.
02/01/2018 09:05
The Bid solicitor SONG DA 4 JOINT STOCK COMPANY has posted the results of the bidding package Package 03 “Purchasing 01 electronic weighing station with a capacity of 100 tons to serve the construction of Mong An hydropower project (Posted on bidding newspaper No. 235 on 11/12/2017) of the investor SONG DA 4 JOINT STOCK COMPANY.
11/12/2017 00:49
The Bid solicitor SONG DA 4 JOINT STOCK COMPANY has posted the request Investment project to apply construction information model to production management of the investor SONG DA 4 JOINT STOCK COMPANY with 3 bidding package.
07/12/2017 15:41
The Bid solicitor SONG DA 4 JOINT STOCK COMPANY has posted the results of the bidding package Package 02 “Purchasing 02 electronic weighing stations with a capacity of 100 tons to serve the construction of Song Ma 3 hydropower project and Nam Na 1 hydropower project (Posted on bidding newspaper No. 142 on August 1, 2017) ) of the investor SONG DA 4 JOINT STOCK COMPANY.
01/08/2017 07:06
The data sheet has been partially hidden, to see the full information please Login or Register
SONG DA 4 JOINT STOCK COMPANY announced the results of the bid package Package 01: Procurement of 01 Toyota Land Cruiser Parado VX .
- Winning bidder: CÔNG TY CỔ PHẦN TOYOTA THÁI HÒA TỪ LIÊM
14/03/2019 16:07
SONG DA 4 JOINT STOCK COMPANY publishes Tender Notice Package 01: Procurement of 01 Toyota Land Cruiser Parado VX in the form National Competitive Bidding .
22/02/2019 14:57
SONG DA 4 JOINT STOCK COMPANY publishes the plan Project of investment in automobiles to serve the management of production and business activities with 1 bidding package .
21/02/2019 09:11
SONG DA 4 JOINT STOCK COMPANY announced the results of the bid package Package 01: Procurement of 01 car Ford Ranger Wildtrak 2.0L AT4x4 .
- Winning bidder: Công ty TNHH Một Thành Viên Kinh doanh Ô tô Thanh Xuân
03/12/2018 19:23
SONG DA 4 JOINT STOCK COMPANY publishes the plan Investment project of pickup trucks for operation management of Song Da Branch 405 with 1 bidding package .
15/11/2018 10:09
SONG DA 4 JOINT STOCK COMPANY announced the results of the bid package Package No. 01 "Training of human resources". (Posted on the bidding newspaper No. 01 on January 2, 2018) .
- Winning bidder: Công ty TNHH giải pháp BIM Hà Nội
02/01/2018 09:05
SONG DA 4 JOINT STOCK COMPANY announced the results of the bid package Package 03 “Purchasing 01 electronic weighing station with a capacity of 100 tons to serve the construction of Mong An hydropower project (Posted on bidding newspaper No. 235 on 11/12/2017) .
- Winning bidder: Công ty TNHH ứng dụng giải pháp công nghệ
11/12/2017 00:49
SONG DA 4 JOINT STOCK COMPANY publishes the plan Investment project to apply construction information model to production management with 3 bidding package .
07/12/2017 15:41
SONG DA 4 JOINT STOCK COMPANY announced the results of the bid package Package 02 “Purchasing 02 electronic weighing stations with a capacity of 100 tons to serve the construction of Song Ma 3 hydropower project and Nam Na 1 hydropower project (Posted on bidding newspaper No. 142 on August 1, 2017) ) .
- Winning bidder: Công ty TNHH ứng dụng giải pháp công nghệ
01/08/2017 07:06
SONG DA 4 JOINT STOCK COMPANY announced the results of the bid package Package No. 01 "Upgrading 80-ton electronic weighing station at Thanh Son hydropower project (Posted on bidding newspaper No. 142 on August 1, 2017) .
- Winning bidder: Công ty TNHH ứng dụng giải pháp công nghệ
01/08/2017 07:06
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor SONG DA 4 JOINT STOCK COMPANY has posted the results of the bidding package Package 01: Procurement of 01 Toyota Land Cruiser Parado VX of the investor SONG DA 4 JOINT STOCK COMPANY.
14/03/2019 16:07
Bid solicitor SONG DA 4 JOINT STOCK COMPANY has posted Tender Notice Package 01: Procurement of 01 Toyota Land Cruiser Parado VX of the investor SONG DA 4 JOINT STOCK COMPANY with the form National Competitive Bidding.
22/02/2019 14:57
Investor SONG DA 4 JOINT STOCK COMPANY has posted an investment and development project Investment project of pickup trucks for operation management of Song Da Branch 405.
20/02/2019 07:00
The Bid solicitor SONG DA 4 JOINT STOCK COMPANY has posted the results of the bidding package Package 01: Procurement of 01 car Ford Ranger Wildtrak 2.0L AT4x4 of the investor SONG DA 4 JOINT STOCK COMPANY.
03/12/2018 19:23
The Bid solicitor SONG DA 4 JOINT STOCK COMPANY has posted the request Investment project of pickup trucks for operation management of Song Da Branch 405 of the investor SONG DA 4 JOINT STOCK COMPANY with 1 bidding package.
15/11/2018 10:09
Investor SONG DA 4 JOINT STOCK COMPANY has posted an investment and development project Investment project of pickup trucks for operation management of Song Da Branch 405.
15/11/2018 07:00
The Bid solicitor SONG DA 4 JOINT STOCK COMPANY has posted the results of the bidding package Package No. 01 "Training of human resources". (Posted on the bidding newspaper No. 01 on January 2, 2018) of the investor SONG DA 4 JOINT STOCK COMPANY.
02/01/2018 09:05
The Bid solicitor SONG DA 4 JOINT STOCK COMPANY has posted the results of the bidding package Package 03 “Purchasing 01 electronic weighing station with a capacity of 100 tons to serve the construction of Mong An hydropower project (Posted on bidding newspaper No. 235 on 11/12/2017) of the investor SONG DA 4 JOINT STOCK COMPANY.
11/12/2017 00:49
The Bid solicitor SONG DA 4 JOINT STOCK COMPANY has posted the request Investment project to apply construction information model to production management of the investor SONG DA 4 JOINT STOCK COMPANY with 3 bidding package.
07/12/2017 15:41
The Bid solicitor SONG DA 4 JOINT STOCK COMPANY has posted the results of the bidding package Package 02 “Purchasing 02 electronic weighing stations with a capacity of 100 tons to serve the construction of Song Ma 3 hydropower project and Nam Na 1 hydropower project (Posted on bidding newspaper No. 142 on August 1, 2017) ) of the investor SONG DA 4 JOINT STOCK COMPANY.
01/08/2017 07:06
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s SONG DA 4 JOINT STOCK COMPANY has posted 17 of the contractor selection plan, which contains 46 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor SONG DA 4 JOINT STOCK COMPANY has posted 15 Tender Notices in 15 bidding packages. Among these, -10 Tender Notices were self-invited, and 25 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor SONG DA 4 JOINT STOCK COMPANY has posted 14 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 14 package, canceled the bid 0 package (among the bidding packages above).
- There are 11 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor SONG DA 4 JOINT STOCK COMPANY has a relationship with 9 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity SONG DA 4 JOINT STOCK COMPANY has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects