Data analysis results of DauThau.info software for bid solicitors Son La ODA Project Management Unit as follows:
- Has relationships with 1 project owners.
- Has relationships with 58 contractor.
- Announced 4 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 34 contractor selection plans with a total of 60 bidding packages, of which 21 prequalification documents have not found the investment project.
- Has invited bids for 20 packages (with 34 tender notices), and conducted prequalification for 0 packages.
- There are 3 bidding packages with content that needs clarification.
- Announced the results of 60 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 40 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 4 packages that have not fully posted the contractor selection results. Of these 4 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.79 contractors.
- Breakdown by bidding field: Goods 8.82%, Construction 29.41%, Consultancy 20.59%, Non-consultancy 29.41%, Mixed 11.76%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 179,004,823,524 VND, of which the total winning bid value is: 169,734,251,671 VND.
- The savings rate is: 5.18%.
Data analysis results of DauThau.info software for bid solicitors Son La ODA Project Management Unit as follows:
- Has relationships with 58 contractor.
- The average number of contractors participating in each bidding package is: 1.79 contractors.
- Proportion of bidding fields: Goods 8.82%, Construction 29.41%, Consulting 20.59%, Non-consulting 29.41%, Mixed 11.76%, Other 0%.
- The total value according to the bidding package with valid IMP is: 179,004,823,524 VND, in which the total winning value is: 169,734,251,671 VND.
- The savings rate is: 5.18%.
This Bid solicitor is also an investor. The analysis results of data for the investor Son La ODA Project Management Unit are as follows:
- Is the investor of 4 development investment projects.
- Is the investor of 37 contractor selection plans, of which 33 were self-published, and 4 were published by other entities.
- Is the investor of 26 Tender Notices, of which 26 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 20 bidding packages, of which 20 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 98.18% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.97% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Sơn La (16), Undefined (4)
- Provinces before the merger where the contractor has participated in bidding : Sơn La (16), Undefined (4)
- Has relationships with 6 Bid Solicitors
- Has relationships with 6 Bid Investors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 42 bidding packages with 16 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Son La ODA Project Management Unit announced the results of the bid package Bidding package No. 09: Consulting on preparing reports for granting environmental permits .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN KỸ THUẬT TÀI NGUYÊN VÀ MÔI TRƯỜNG
12/11/2025 14:39
Son La ODA Project Management Unit publishes the plan Decision on approving additional contractor selection plans for the investment preparation phase of the project Improving urban infrastructure to respond to climate change in Son La city with 1 bidding package .
27/10/2025 17:04
The Bid solicitor Son La ODA Project Management Unit has posted the results of the bidding package Package No. 03: Periodic probe inspection of the investor Son La ODA Project Management Unit.
- Winning bidder: Center of Analysis and Environmemt
10/10/2025 16:19
Son La ODA Project Management Unit announced the results of the bid package Package No. 01: Consulting to set up investment policies .
- Winning bidder: VAN PHU CONSULTANTS JOINT STOCK COMPANY
01/10/2025 10:46
The Bid solicitor Son La ODA Project Management Unit has posted the results of the bidding package Package 01 (TV): Independent audit consultancy of the investor Son La ODA Project Management Unit.
- Winning bidder: INTERNATIONAL AUDITING COMPANY LIMITED
01/10/2025 10:27
Son La ODA Project Management Unit announced the results of the bid package Package No. 01: Advice on local adjustment of rainwater drainage system planning .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNG NAM DUONG
29/08/2025 14:55
Son La ODA Project Management Unit publishes the plan Approving estimates and planning plannings for consulting local adjustment planning for rain water drainage systems of Chieng Ngan - Nam La stream belonging to the general planning project of Son La city, Son La province to 2045 with 1 bidding package .
27/08/2025 16:14
Son La ODA Project Management Unit publishes the plan Approving the contractor selection plan phase of preparation for investment projects to enhance key connectivity to create motivation for sustainable socio-economic development in Son La province, use loans to the Asian Development Bank (ADB). with 2 bidding package .
22/08/2025 16:47
Son La ODA Project Management Unit announced the results of the bid package Package 02: Live TV channel inauguration ceremony of the project. .
- Winning bidder: VNPT VINAPHONE CORPORATION
16/08/2025 15:49
Son La ODA Project Management Unit announced the results of the bid package Package No. 03: Providing events, personnel serving the inauguration ceremony of the project .
- Winning bidder: CÔNG TY TNHH TỔ CHỨC SỰ KIỆN M2T
16/08/2025 15:13
The data sheet has been partially hidden, to see the full information please Login or Register
Son La ODA Project Management Unit announced the results of the bid package Package No. 03: Periodic probe inspection .
- Winning bidder: Center of Analysis and Environmemt
10/10/2025 16:19
Son La ODA Project Management Unit announced the results of the bid package Package 01 (TV): Independent audit consultancy .
- Winning bidder: INTERNATIONAL AUDITING COMPANY LIMITED
01/10/2025 10:27
Son La ODA Project Management Unit announced the results of the bid package Package No. 17 (TV-15/1B): Making a report on environmental licensing proposals .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN KỸ THUẬT TÀI NGUYÊN VÀ MÔI TRƯỜNG
08/07/2025 17:17
Son La ODA Project Management Unit announced the results of the bid package Package No. 06 (TV-01/B): Translation advice in the end of investment ending .
- Winning bidder: BACH VIET TRANSLATION COMPANY LIMITED
01/07/2025 08:46
Son La ODA Project Management Unit announced the results of the bid package Package 07 (TV- 07/1B): Independent audit consultancy .
- Winning bidder: VIET NAM AUDITING AND VALUATION COMPANY LIMITED
01/07/2025 08:43
Son La ODA Project Management Unit announced the results of the bid package Package 02 (PTV): Construction insurance .
- Winning bidder: GLOBAL INSURANCE CORPORATION
26/05/2025 14:12
Son La ODA Project Management Unit announced the results of the bid package Package No. 23 (TV-20/1B): Consulting on examining construction drawing and estimates .
- Winning bidder: Trung tâm giám định chất lượng và quy hoạch xây dựng
13/05/2025 15:45
Son La ODA Project Management Unit announced the results of the bid package Package No. 03 (PC): Supply of goods and construction .
- Winning bidder: CÔNG TY TNHH MTV XÂY DỰNG VIỆT HOÀN, SEEN TECHNOLOGIES CORPORATION,
13/05/2025 14:08
Son La ODA Project Management Unit announced the results of the bid package Package No. 22 (TV-19/1B): Consulting on designing construction drawings and estimates .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNG NAM DUONG
12/05/2025 14:10
Son La ODA Project Management Unit publishes the plan Decision on approval of adjustment and supplementation plan for contractor selection plan for drainage and wastewater treatment systems in Son La City with 2 bidding package .
12/05/2025 14:07
The data sheet has been partially hidden, to see the full information please Login or Register
Son La ODA Project Management Unit announced the results of the bid package Bidding package No. 09: Consulting on preparing reports for granting environmental permits .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN KỸ THUẬT TÀI NGUYÊN VÀ MÔI TRƯỜNG
12/11/2025 14:39
Son La ODA Project Management Unit publishes the plan Decision on approving additional contractor selection plans for the investment preparation phase of the project Improving urban infrastructure to respond to climate change in Son La city with 1 bidding package .
27/10/2025 17:04
The Bid solicitor Son La ODA Project Management Unit has posted the results of the bidding package Package No. 03: Periodic probe inspection of the investor Son La ODA Project Management Unit.
- Winning bidder: Center of Analysis and Environmemt
10/10/2025 16:19
Son La ODA Project Management Unit announced the results of the bid package Package No. 01: Consulting to set up investment policies .
- Winning bidder: VAN PHU CONSULTANTS JOINT STOCK COMPANY
01/10/2025 10:46
The Bid solicitor Son La ODA Project Management Unit has posted the results of the bidding package Package 01 (TV): Independent audit consultancy of the investor Son La ODA Project Management Unit.
- Winning bidder: INTERNATIONAL AUDITING COMPANY LIMITED
01/10/2025 10:27
Son La ODA Project Management Unit announced the results of the bid package Package No. 01: Advice on local adjustment of rainwater drainage system planning .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNG NAM DUONG
29/08/2025 14:55
Son La ODA Project Management Unit publishes the plan Approving estimates and planning plannings for consulting local adjustment planning for rain water drainage systems of Chieng Ngan - Nam La stream belonging to the general planning project of Son La city, Son La province to 2045 with 1 bidding package .
27/08/2025 16:14
Son La ODA Project Management Unit publishes the plan Approving the contractor selection plan phase of preparation for investment projects to enhance key connectivity to create motivation for sustainable socio-economic development in Son La province, use loans to the Asian Development Bank (ADB). with 2 bidding package .
22/08/2025 16:47
Son La ODA Project Management Unit announced the results of the bid package Package 02: Live TV channel inauguration ceremony of the project. .
- Winning bidder: VNPT VINAPHONE CORPORATION
16/08/2025 15:49
Son La ODA Project Management Unit announced the results of the bid package Package No. 03: Providing events, personnel serving the inauguration ceremony of the project .
- Winning bidder: CÔNG TY TNHH TỔ CHỨC SỰ KIỆN M2T
16/08/2025 15:13
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Son La ODA Project Management Unit has posted 34 of the contractor selection plan, which contains 60 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Son La ODA Project Management Unit has posted 34 Tender Notices in 20 bidding packages. Among these, 26 Tender Notices were self-invited, and 8 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Son La ODA Project Management Unit has posted 60 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 60 package, canceled the bid 0 package (among the bidding packages above).
- There are 40 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Son La ODA Project Management Unit has a relationship with 58 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Son La ODA Project Management Unit has a relationship with 13 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Son La ODA Project Management Unit has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects