Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TROPICAL ARCHITECTURE COMPANY as follows:
- Has relationships with 8 project owners.
- Has relationships with 14 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 27 contractor selection plans with a total of 41 bidding packages, of which 15 prequalification documents have not found the investment project.
- Has invited bids for 13 packages (with 18 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 11 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 29 packages that have not fully posted the contractor selection results. Of these 28 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.80 contractors.
- Breakdown by bidding field: Goods 55.56%, Construction 44.44%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 12,558,082,928 VND, of which the total winning bid value is: 12,145,884,887 VND.
- The savings rate is: 3.28%.
Data analysis results of DauThau.info software for bid solicitors TROPICAL ARCHITECTURE COMPANY as follows:
- Has relationships with 14 contractor.
- The average number of contractors participating in each bidding package is: 1.80 contractors.
- Proportion of bidding fields: Goods 55.56%, Construction 44.44%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 12,558,082,928 VND, in which the total winning value is: 12,145,884,887 VND.
- The savings rate is: 3.28%.
This Bid solicitor is also an investor. The analysis results of data for the investor TROPICAL ARCHITECTURE COMPANY are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 9 contractor selection plans, of which 9 were self-published, and 0 were published by other entities.
- Is the investor of 7 Tender Notices, of which 7 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 42 bidding packages, of which 40 were won, 2 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 80.15% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 94.85% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đắk Lắk (31), Gia Lai (5), Undefined (6)
- Provinces before the merger where the contractor has participated in bidding : Phú Yên (23), Bình Định (4), Undefined (15)
- Has relationships with 18 Bid Solicitors
- Has relationships with 22 Bid Investors
- Has competed against 10 contractors in 4 bidding packages, won 2 packages, lost 2 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 1 contractors in 1 bidding packages, won 1 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 190 bidding packages with 15 roles.
- Name of construction organization: CÔNG TY TNHH KIẾN TRÚC NHIỆT ĐỚI
- Code of capacity certificate of construction activities: 00000830
- Issuer: Sở Kế hoạch và Đầu tư Tỉnh Phú Yên
- Fields:
⚬ Giám sát thi công xây dựng công trình: Dân dụng & Công nghiệp Dân dụng
⚬ Khảo sát xây dựng: Khảo sát địa hình Khảo sát địa hình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng & Công nghiệp Dân dụng & Công nghiệp
⚬ Giám sát thi công xây dựng công trình: Dân dụng & Công nghiệp Dân dụng & Công nghiệp
⚬ Thi công xây dựng công trình: Dân dụng & Công nghiệp Dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng (kiến trúc; kết cấu; cơ - điện; cấp - thoát nước) công trình Dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng (kiến trúc; kết cấu; cơ - điện; cấp - thoát nước) công trình Công nghiệp
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng công trình Hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted the results of the bidding package Bidding package 01: Bidding package for supplying construction materials of the investor TROPICAL ARCHITECTURE COMPANY.
23/08/2023 14:07
Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted Tender Notice Bidding package 01: Bidding package for supplying construction materials of the investor TROPICAL ARCHITECTURE COMPANY with the form Competitive Offer.
01/08/2023 10:52
Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted Tender Notice Bidding package 01: Bidding package for supplying construction materials of the investor TROPICAL ARCHITECTURE COMPANY with the form Competitive Offer.
29/07/2023 14:31
The Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted the request Repairing and renovating the protective fence of Camp No. 2 - Kim Son Prison of the investor TROPICAL ARCHITECTURE COMPANY with 2 bidding package.
29/07/2023 14:01
The Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted the request Repairing and renovating the protective fence of Camp No. 2 - Kim Son Prison of the investor TROPICAL ARCHITECTURE COMPANY with 2 bidding package.
29/07/2023 13:45
The Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted the request Repairing and renovating the protective fence of Camp No. 2 - Kim Son Prison of the investor TROPICAL ARCHITECTURE COMPANY with 2 bidding package.
29/07/2023 13:38
The Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted the request Repairing and renovating the protective fence of Camp No. 2 - Kim Son Prison of the investor TROPICAL ARCHITECTURE COMPANY with 2 bidding package.
29/07/2023 13:36
The Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted the results of the bidding package Package 02: Bidding package to supply construction materials of the investor TROPICAL ARCHITECTURE COMPANY.
25/07/2023 09:36
The Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted the results of the bidding package Bidding package: Bidding package to supply construction materials of the investor TROPICAL ARCHITECTURE COMPANY.
12/07/2023 16:26
Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted Tender Notice Package 02: Bidding package to supply construction materials of the investor TROPICAL ARCHITECTURE COMPANY with the form Competitive Offer.
08/07/2023 15:35
The data sheet has been partially hidden, to see the full information please Login or Register
TROPICAL ARCHITECTURE COMPANY announced the results of the bid package Bidding package 01: Bidding package for supplying construction materials .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ DỊCH VỤ THƯƠNG MẠI VIỆT VĂN
23/08/2023 14:07
TROPICAL ARCHITECTURE COMPANY announced the results of the bidding package Bidding package 01: Bidding package for supplying construction materials with 1 participating contractors .
08/08/2023 09:01
TROPICAL ARCHITECTURE COMPANY publishes Tender Notice Bidding package 01: Bidding package for supplying construction materials in the form Competitive Offer .
01/08/2023 10:52
TROPICAL ARCHITECTURE COMPANY publishes Tender Notice Bidding package 01: Bidding package for supplying construction materials in the form Competitive Offer .
29/07/2023 14:31
TROPICAL ARCHITECTURE COMPANY publishes the plan Repairing and renovating the protective fence of Camp No. 2 - Kim Son Prison with 2 bidding package .
29/07/2023 14:01
TROPICAL ARCHITECTURE COMPANY publishes the plan Repairing and renovating the protective fence of Camp No. 2 - Kim Son Prison with 2 bidding package .
29/07/2023 13:45
TROPICAL ARCHITECTURE COMPANY publishes the plan Repairing and renovating the protective fence of Camp No. 2 - Kim Son Prison with 2 bidding package .
29/07/2023 13:38
TROPICAL ARCHITECTURE COMPANY publishes the plan Repairing and renovating the protective fence of Camp No. 2 - Kim Son Prison with 2 bidding package .
29/07/2023 13:36
TROPICAL ARCHITECTURE COMPANY announced the results of the bid package Package 02: Bidding package to supply construction materials .
- Winning bidder:
25/07/2023 09:36
TROPICAL ARCHITECTURE COMPANY announced the results of the bidding package Package 02: Bidding package to supply construction materials with 1 participating contractors .
18/07/2023 09:01
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted the results of the bidding package Bidding package 01: Bidding package for supplying construction materials of the investor TROPICAL ARCHITECTURE COMPANY.
23/08/2023 14:07
Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted Tender Notice Bidding package 01: Bidding package for supplying construction materials of the investor TROPICAL ARCHITECTURE COMPANY with the form Competitive Offer.
01/08/2023 10:52
Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted Tender Notice Bidding package 01: Bidding package for supplying construction materials of the investor TROPICAL ARCHITECTURE COMPANY with the form Competitive Offer.
29/07/2023 14:31
The Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted the request Repairing and renovating the protective fence of Camp No. 2 - Kim Son Prison of the investor TROPICAL ARCHITECTURE COMPANY with 2 bidding package.
29/07/2023 14:01
The Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted the request Repairing and renovating the protective fence of Camp No. 2 - Kim Son Prison of the investor TROPICAL ARCHITECTURE COMPANY with 2 bidding package.
29/07/2023 13:45
The Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted the request Repairing and renovating the protective fence of Camp No. 2 - Kim Son Prison of the investor TROPICAL ARCHITECTURE COMPANY with 2 bidding package.
29/07/2023 13:38
The Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted the request Repairing and renovating the protective fence of Camp No. 2 - Kim Son Prison of the investor TROPICAL ARCHITECTURE COMPANY with 2 bidding package.
29/07/2023 13:36
The Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted the results of the bidding package Package 02: Bidding package to supply construction materials of the investor TROPICAL ARCHITECTURE COMPANY.
25/07/2023 09:36
The Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted the results of the bidding package Bidding package: Bidding package to supply construction materials of the investor TROPICAL ARCHITECTURE COMPANY.
12/07/2023 16:26
Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted Tender Notice Package 02: Bidding package to supply construction materials of the investor TROPICAL ARCHITECTURE COMPANY with the form Competitive Offer.
08/07/2023 15:35
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TROPICAL ARCHITECTURE COMPANY has posted 27 of the contractor selection plan, which contains 41 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted 18 Tender Notices in 13 bidding packages. Among these, 7 Tender Notices were self-invited, and 11 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TROPICAL ARCHITECTURE COMPANY has posted 11 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 11 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TROPICAL ARCHITECTURE COMPANY has a relationship with 14 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TROPICAL ARCHITECTURE COMPANY has a relationship with 9 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TROPICAL ARCHITECTURE COMPANY has a relationship with 8 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects