Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors The Management Unit of Projects and Clearance in Economic Zone Area as follows:
- Has relationships with 2 project owners.
- Has relationships with 80 contractor.
- Announced 14 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 26 contractor selection plans with a total of 52 bidding packages, of which 19 prequalification documents have not found the investment project.
- Has invited bids for 22 packages (with 26 tender notices), and conducted prequalification for 0 packages.
- There are 4 bidding packages with content that needs clarification.
- Announced the results of 39 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 17 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 17 packages that have not fully posted the contractor selection results. Of these 17 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.52 contractors.
- Breakdown by bidding field: Goods 3.85%, Construction 42.31%, Consultancy 50.00%, Non-consultancy 3.85%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 268,273,226,553 VND, of which the total winning bid value is: 260,099,481,087 VND.
- The savings rate is: 3.05%.
Data analysis results of DauThau.info software for bid solicitors The Management Unit of Projects and Clearance in Economic Zone Area as follows:
- Has relationships with 80 contractor.
- The average number of contractors participating in each bidding package is: 2.52 contractors.
- Proportion of bidding fields: Goods 3.85%, Construction 42.31%, Consulting 50.00%, Non-consulting 3.85%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 268,273,226,553 VND, in which the total winning value is: 260,099,481,087 VND.
- The savings rate is: 3.05%.
This Bid solicitor is also an investor. The analysis results of data for the investor The Management Unit of Projects and Clearance in Economic Zone Area are as follows:
- Is the investor of 14 development investment projects.
- Is the investor of 33 contractor selection plans, of which 21 were self-published, and 12 were published by other entities.
- Is the investor of 37 Tender Notices, of which 21 were self-invited, and 16 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Management Unit of Projects and Clearance in Economic Zone Area announced the results of the bid package Construction of infrastructure repair .
- Winning bidder: CÔNG TY TNHH TM & XD AN LỘC HƯNG
31/07/2026 16:41
The Management Unit of Projects and Clearance in Economic Zone Area publishes Tender Notice Bidding package No. 1: Prepare design documents for BVTC - DT in the form Open bidding .
24/07/2026 17:32
The Management Unit of Projects and Clearance in Economic Zone Area publishes the plan Steps to prepare design documents for BVTC-DT with 5 bidding package .
14/07/2026 11:18
Investor The Management Unit of Projects and Clearance in Economic Zone Area has posted an investment and development project Resettlement area in the west of Bau Ho, Hoai Nhon Dong ward.
14/07/2026 11:11
The Management Unit of Projects and Clearance in Economic Zone Area publishes Tender Notice Construction of infrastructure repair in the form Competitive Offer .
12/07/2026 19:31
The Management Unit of Projects and Clearance in Economic Zone Area publishes the plan Approve the contractor selection plan for bidding packages under the work content: Repair and maintenance of technical infrastructure of Nhon Hoi Economic Zone in 2026 (Construction and installation step) with 2 bidding package .
12/07/2026 14:34
The Management Unit of Projects and Clearance in Economic Zone Area publishes the plan Approve the contractor selection plan for bidding packages under the work content: Repair and maintenance of technical infrastructure of Nhon Hoi Economic Zone in 2026 (Construction and installation step) with 2 bidding package .
12/07/2026 14:33
Investor The Management Unit of Projects and Clearance in Economic Zone Area has posted an investment and development project Repair and maintenance of technical infrastructure of Nhon Hoi Economic Zone in 2026.
09/07/2026 20:20
The Management Unit of Projects and Clearance in Economic Zone Area publishes the plan Approve the contractor selection plan for bidding packages under the work content: Repair and maintenance of technical infrastructure of Nhon Hoi Economic Zone in 2026 (Construction and installation step) with 2 bidding package .
09/07/2026 20:15
The Management Unit of Projects and Clearance in Economic Zone Area announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY TNHH CÔNG NGHỆ & XÂY DỰNG NAM NGÂN
13/04/2026 11:09
The data sheet has been partially hidden, to see the full information please Login or Register
The Management Unit of Projects and Clearance in Economic Zone Area publishes the plan Construction contractor selection plan with 2 bidding package .
06/08/2025 16:04
The Management Unit of Projects and Clearance in Economic Zone Area announced the results of the bid package Prepare a feasibility study report .
- Winning bidder: BINHDINH TRANSPORTATION CONSULTING AND DESIGN JOINT STOCK COMPANY, CÔNG TY TNHH TƯ VẤN XÂY DỰNG L&T, VIET LONG DEVELOPMENT TECHNOLOGY COMPANY LTD.
24/07/2025 13:53
The Management Unit of Projects and Clearance in Economic Zone Area announced the results of the bid package Prepare a feasibility study report .
- Winning bidder: CÔNG TY TNHH TƯ VẤN HỘI CẦU ĐƯỜNG, CÔNG TY TNHH TƯ VẤN XÂY DỰNG ĐIỆN AN TRUNG
20/06/2025 16:10
The Management Unit of Projects and Clearance in Economic Zone Area announced the results of the bid package Package 02: All construction supervision volume .
- Winning bidder: HUY HOANG DESIGN AND CONSTRUCTION CONSULTING COMPANY LTD, VIET LONG DEVELOPMENT TECHNOLOGY COMPANY LTD.
06/06/2025 12:01
The Management Unit of Projects and Clearance in Economic Zone Area announced the results of the bid package Bidding package No. 01: Entire construction volume .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG ĐỐNG ĐA, CÔNG TY TRÁCH NHIỆM HỮU HẠN KHANG AN
06/06/2025 12:00
The Management Unit of Projects and Clearance in Economic Zone Area announced the results of the bidding package Prepare a feasibility study report with 2 participating contractors .
06/06/2025 09:03
The Management Unit of Projects and Clearance in Economic Zone Area announced the results of the bidding package Prepare a feasibility study report with 2 participating contractors .
06/06/2025 09:02
The Management Unit of Projects and Clearance in Economic Zone Area announced the results of the bid package Construction and installation of traffic lights .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TỔNG HỢP AN THỊNH
15/05/2025 19:01
The Management Unit of Projects and Clearance in Economic Zone Area publishes Tender Notice Prepare feasibility study report in the form Open bidding .
15/05/2025 09:33
The Management Unit of Projects and Clearance in Economic Zone Area announced the results of the bidding package Package 02: All construction supervision volume with 2 participating contractors .
15/05/2025 09:03
The data sheet has been partially hidden, to see the full information please Login or Register
The Management Unit of Projects and Clearance in Economic Zone Area announced the results of the bid package Construction of infrastructure repair .
- Winning bidder: CÔNG TY TNHH TM & XD AN LỘC HƯNG
31/07/2026 16:41
The Management Unit of Projects and Clearance in Economic Zone Area publishes Tender Notice Bidding package No. 1: Prepare design documents for BVTC - DT in the form Open bidding .
24/07/2026 17:32
The Management Unit of Projects and Clearance in Economic Zone Area publishes the plan Steps to prepare design documents for BVTC-DT with 5 bidding package .
14/07/2026 11:18
Investor The Management Unit of Projects and Clearance in Economic Zone Area has posted an investment and development project Resettlement area in the west of Bau Ho, Hoai Nhon Dong ward.
14/07/2026 11:11
The Management Unit of Projects and Clearance in Economic Zone Area publishes Tender Notice Construction of infrastructure repair in the form Competitive Offer .
12/07/2026 19:31
The Management Unit of Projects and Clearance in Economic Zone Area publishes the plan Approve the contractor selection plan for bidding packages under the work content: Repair and maintenance of technical infrastructure of Nhon Hoi Economic Zone in 2026 (Construction and installation step) with 2 bidding package .
12/07/2026 14:34
The Management Unit of Projects and Clearance in Economic Zone Area publishes the plan Approve the contractor selection plan for bidding packages under the work content: Repair and maintenance of technical infrastructure of Nhon Hoi Economic Zone in 2026 (Construction and installation step) with 2 bidding package .
12/07/2026 14:33
Investor The Management Unit of Projects and Clearance in Economic Zone Area has posted an investment and development project Repair and maintenance of technical infrastructure of Nhon Hoi Economic Zone in 2026.
09/07/2026 20:20
The Management Unit of Projects and Clearance in Economic Zone Area publishes the plan Approve the contractor selection plan for bidding packages under the work content: Repair and maintenance of technical infrastructure of Nhon Hoi Economic Zone in 2026 (Construction and installation step) with 2 bidding package .
09/07/2026 20:15
The Management Unit of Projects and Clearance in Economic Zone Area announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY TNHH CÔNG NGHỆ & XÂY DỰNG NAM NGÂN
13/04/2026 11:09
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s The Management Unit of Projects and Clearance in Economic Zone Area has posted 26 of the contractor selection plan, which contains 52 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted 26 Tender Notices in 22 bidding packages. Among these, 13 Tender Notices were self-invited, and 13 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has posted 39 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 39 package, canceled the bid 0 package (among the bidding packages above).
- There are 17 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has a relationship with 80 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor The Management Unit of Projects and Clearance in Economic Zone Area has a relationship with 11 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity The Management Unit of Projects and Clearance in Economic Zone Area has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects