Data analysis results of DauThau.info software for bid solicitors VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION as follows:
- Has relationships with 0 project owners.
- Has relationships with 6 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION as follows:
- Has relationships with 6 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 3 contractor selection plans, of which 0 were self-published, and 3 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION has posted the results of the bidding package Package 4: Supply and installation of equipment for automatic meteorological monitoring system AWOS of the investor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION.
26/05/2022 17:03
The Bid solicitor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION has posted the results of the bidding package Package 14: Construction of radar tower and ancillary items of the investor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION.
31/03/2022 13:52
The Bid solicitor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION has posted the results of the bidding package Package 7: Supervision of construction, installation and equipment installation of the investor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION.
28/03/2022 09:14
The Bid solicitor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION has posted the results of the bidding package Package 3: Construction, supply and installation of power supply system, lightning protection system and fiber optic transmission line of the investor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION.
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ VÀ PHÁT TRIỂN HTD
16/03/2022 14:13
The Bid solicitor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION has posted the results of the bidding package Package 5: Survey of construction drawing design, construction drawing design - construction cost estimate of the investor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION.
- Winning bidder: Công ty Cổ phần Tư vấn Xây dựng và Dịch vụ Hàng không
11/01/2022 09:40
The Bid solicitor Chứng thư số đăng tải TBMT - PMU PPA has posted the request Set up maintenance procedures for aviation works; Inspect and verify the quality of works; Inspection and monitoring of work deformation; Determine the life of the building. of the investor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION with 4 bidding package.
26/08/2015 15:32
The Bid solicitor Chứng thư số đăng tải TBMT - PMU PPA has posted the request Invest in black box detection equipment. of the investor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION with 1 bidding package.
26/08/2015 15:13
The Bid solicitor Chứng thư số đăng tải TBMT - PMU PPA has posted the request Buy property insurance and flight operator liability insurance in 2015-2016 from Vietnam Flight Management Corporation. of the investor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION with 2 bidding package.
14/08/2015 15:27
The data sheet has been partially hidden, to see the full information please Login or Register
VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION announced the results of the bid package Package 4: Supply and installation of equipment for automatic meteorological monitoring system AWOS .
- Winning bidder: CÔNG TY CỔ PHẦN THIẾT BỊ KHÍ TƯỢNG THỦY VĂN VÀ MÔI TRƯỜNG VIỆT NAM
26/05/2022 17:03
VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION announced the results of the bid package Package 14: Construction of radar tower and ancillary items .
31/03/2022 13:52
VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION announced the results of the bid package Package 7: Supervision of construction, installation and equipment installation .
- Winning bidder: Văn phòng tư vấn và chuyển giao công nghệ xây dựng, CÔNG TY CỔ PHẦN PHÁT TRIỂN THƯƠNG MẠI VÀ XÂY LẮP BÌNH MINH
28/03/2022 09:14
VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION announced the results of the bid package Package 3: Construction, supply and installation of power supply system, lightning protection system and fiber optic transmission line .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ VÀ PHÁT TRIỂN HTD
16/03/2022 14:13
VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION announced the results of the bid package Package 5: Survey of construction drawing design, construction drawing design - construction cost estimate .
- Winning bidder: Công ty Cổ phần Tư vấn Xây dựng và Dịch vụ Hàng không
11/01/2022 09:40
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION has posted the results of the bidding package Package 4: Supply and installation of equipment for automatic meteorological monitoring system AWOS of the investor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION.
26/05/2022 17:03
The Bid solicitor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION has posted the results of the bidding package Package 14: Construction of radar tower and ancillary items of the investor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION.
31/03/2022 13:52
The Bid solicitor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION has posted the results of the bidding package Package 7: Supervision of construction, installation and equipment installation of the investor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION.
28/03/2022 09:14
The Bid solicitor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION has posted the results of the bidding package Package 3: Construction, supply and installation of power supply system, lightning protection system and fiber optic transmission line of the investor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION.
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ VÀ PHÁT TRIỂN HTD
16/03/2022 14:13
The Bid solicitor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION has posted the results of the bidding package Package 5: Survey of construction drawing design, construction drawing design - construction cost estimate of the investor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION.
- Winning bidder: Công ty Cổ phần Tư vấn Xây dựng và Dịch vụ Hàng không
11/01/2022 09:40
The Bid solicitor Chứng thư số đăng tải TBMT - PMU PPA has posted the request Set up maintenance procedures for aviation works; Inspect and verify the quality of works; Inspection and monitoring of work deformation; Determine the life of the building. of the investor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION with 4 bidding package.
26/08/2015 15:32
The Bid solicitor Chứng thư số đăng tải TBMT - PMU PPA has posted the request Invest in black box detection equipment. of the investor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION with 1 bidding package.
26/08/2015 15:13
The Bid solicitor Chứng thư số đăng tải TBMT - PMU PPA has posted the request Buy property insurance and flight operator liability insurance in 2015-2016 from Vietnam Flight Management Corporation. of the investor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION with 2 bidding package.
14/08/2015 15:27
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION has posted 0 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 0 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor VIETNAM AIR TRAFFIC MANAGEMENT CORPORATION has a relationship with 6 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects