Data analysis results of DauThau.info software for bid solicitors ARCHITECTURAL PROJECTS MANAGEMENT UNIT as follows:
- Has relationships with 1 project owners.
- Has relationships with 53 contractor.
- Announced 4 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 15 contractor selection plans with a total of 29 bidding packages, of which 9 prequalification documents have not found the investment project.
- Has invited bids for 13 packages (with 14 tender notices), and conducted prequalification for 0 packages.
- There are 5 bidding packages with content that needs clarification.
- Announced the results of 31 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 19 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 11 packages that have not fully posted the contractor selection results. Of these 11 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.85 contractors.
- Breakdown by bidding field: Goods 21.43%, Construction 50.00%, Consultancy 0%, Non-consultancy 7.14%, Mixed 21.43%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 350,055,691,521 VND, of which the total winning bid value is: 331,430,639,746 VND.
- The savings rate is: 5.32%.
Data analysis results of DauThau.info software for bid solicitors ARCHITECTURAL PROJECTS MANAGEMENT UNIT as follows:
- Has relationships with 53 contractor.
- The average number of contractors participating in each bidding package is: 2.85 contractors.
- Proportion of bidding fields: Goods 21.43%, Construction 50.00%, Consulting 0%, Non-consulting 7.14%, Mixed 21.43%, Other 0%.
- The total value according to the bidding package with valid IMP is: 350,055,691,521 VND, in which the total winning value is: 331,430,639,746 VND.
- The savings rate is: 5.32%.
This Bid solicitor is also an investor. The analysis results of data for the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT are as follows:
- Is the investor of 4 development investment projects.
- Is the investor of 11 contractor selection plans, of which 11 were self-published, and 0 were published by other entities.
- Is the investor of 1 Tender Notices, of which 1 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 1 bidding packages, of which 1 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 100% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 100% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (1)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (1)
- Has relationships with 1 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 1 bidding packages with 1 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted the request The contractor selection plan and the estimated bidding package of 96FO optical cable project from Bao Loc to Dau Giay of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT with 2 bidding package.
11/04/2025 14:48
The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted the request Contractor selection plan, estimating bidding package of 96FO optical cable project from Son La to Phu Yen of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT with 2 bidding package.
11/04/2025 14:41
The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted the results of the bidding package Construction and renovation of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT.
07/01/2025 10:54
Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted Tender Notice Construction and renovation of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT with the form Competitive Offer.
29/11/2024 15:59
The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted the results of the bidding package Construction supervision consultancy of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT.
28/11/2024 16:46
The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted the results of the bidding package Consulting on making economic - technical reports of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT.
07/11/2024 09:08
The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted the results of the bidding package Package No. 3: Audit of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT.
06/11/2024 15:33
The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted the request Repairing waterproofing and leak-proofing the administrative house of Que Duong KTVT area of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT with 3 bidding package.
06/11/2024 15:10
The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted the request Repairing waterproofing and leak-proofing the administrative house of Que Duong KTVT area of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT with 3 bidding package.
06/11/2024 15:08
The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted the request LCNT plan for the investment preparation phase of the project Repairing and renovating the Traditional Room on the 18th floor of VNPT Building Net of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT with 1 bidding package.
04/11/2024 09:03
The data sheet has been partially hidden, to see the full information please Login or Register
ARCHITECTURAL PROJECTS MANAGEMENT UNIT announced the results of the bid package Design, supply, installation and construction of works (EPC) .
- Winning bidder: TOAN THINH PHAT ELECTRIC TECHNOLOGY SERVICE TRADING COMPANY LIMITED, KY GIA CONSTRUCTION ARCHITECTURAL CONSULTING COMPANY LIMITED, 105 CONSTRUCTION JOINT STOCK COMPANY, HUU NGHI MECHANICAL ELECTRICAL COMPANY LIMITED, HOP DUC PHAT COMPANY LIMITED, CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ KỸ THUẬT VĂN KHOA
18/07/2025 18:02
ARCHITECTURAL PROJECTS MANAGEMENT UNIT announced the results of the bidding package Design, supply, installation and construction of works (EPC) with 2 participating contractors .
11/06/2025 10:36
ARCHITECTURAL PROJECTS MANAGEMENT UNIT publishes Tender Notice Design, supply, installation and construction of works (EPC) in the form Open bidding .
06/05/2025 16:42
ARCHITECTURAL PROJECTS MANAGEMENT UNIT publishes the plan The contractor selection plan and the estimated bidding package of 96FO optical cable project from Bao Loc to Dau Giay with 2 bidding package .
11/04/2025 14:48
ARCHITECTURAL PROJECTS MANAGEMENT UNIT publishes the plan Contractor selection plan, estimating bidding package of 96FO optical cable project from Son La to Phu Yen with 2 bidding package .
11/04/2025 14:41
ARCHITECTURAL PROJECTS MANAGEMENT UNIT announced the results of the bid package Equip air conditioning systems for network Nodes in 2024 .
- Winning bidder: N.D.C JOINT STOCK COMPANY, HOP PHAT PRODUCTION AND TRADINNG JOINT STOCK COMPANY
26/03/2025 14:02
ARCHITECTURAL PROJECTS MANAGEMENT UNIT announced the results of the bidding package Equip air conditioning systems for network Nodes in 2024 with 1 participating contractors .
12/03/2025 14:03
ARCHITECTURAL PROJECTS MANAGEMENT UNIT publishes Tender Notice Equip air conditioning systems for network Nodes in 2024 in the form Open bidding .
19/02/2025 10:42
ARCHITECTURAL PROJECTS MANAGEMENT UNIT announced the results of the bid package Construction of fiber optic cable line 96FO from Hue to Dong Ha .
- Winning bidder: TUNG LAM TRADING AND CONSTRUCTION JOINT STOCK COMPANY, CONFITECH DONG A JOINT STOCK COMPANY
16/01/2025 15:14
ARCHITECTURAL PROJECTS MANAGEMENT UNIT announced the results of the bid package Construction and renovation .
- Winning bidder: GIA PHAT CONSTRUCTION AND TRADING DEVELOPMENT JOINT STOCK COMPANY
07/01/2025 10:54
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted the request The contractor selection plan and the estimated bidding package of 96FO optical cable project from Bao Loc to Dau Giay of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT with 2 bidding package.
11/04/2025 14:48
The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted the request Contractor selection plan, estimating bidding package of 96FO optical cable project from Son La to Phu Yen of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT with 2 bidding package.
11/04/2025 14:41
The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted the results of the bidding package Construction and renovation of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT.
07/01/2025 10:54
Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted Tender Notice Construction and renovation of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT with the form Competitive Offer.
29/11/2024 15:59
The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted the results of the bidding package Construction supervision consultancy of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT.
28/11/2024 16:46
The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted the results of the bidding package Consulting on making economic - technical reports of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT.
07/11/2024 09:08
The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted the results of the bidding package Package No. 3: Audit of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT.
06/11/2024 15:33
The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted the request Repairing waterproofing and leak-proofing the administrative house of Que Duong KTVT area of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT with 3 bidding package.
06/11/2024 15:10
The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted the request Repairing waterproofing and leak-proofing the administrative house of Que Duong KTVT area of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT with 3 bidding package.
06/11/2024 15:08
The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted the request LCNT plan for the investment preparation phase of the project Repairing and renovating the Traditional Room on the 18th floor of VNPT Building Net of the investor ARCHITECTURAL PROJECTS MANAGEMENT UNIT with 1 bidding package.
04/11/2024 09:03
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted 15 of the contractor selection plan, which contains 29 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted 14 Tender Notices in 13 bidding packages. Among these, 1 Tender Notices were self-invited, and 13 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has posted 31 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 31 package, canceled the bid 0 package (among the bidding packages above).
- There are 19 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has a relationship with 53 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ARCHITECTURAL PROJECTS MANAGEMENT UNIT has a relationship with 16 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity ARCHITECTURAL PROJECTS MANAGEMENT UNIT has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects