Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án as follows:
- Has relationships with 1 project owners.
- Has relationships with 153 contractor.
- Announced 25 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 52 contractor selection plans with a total of 194 bidding packages, of which 12 prequalification documents have not found the investment project.
- Has invited bids for 48 packages (with 56 tender notices), and conducted prequalification for 0 packages.
- There are 7 bidding packages with content that needs clarification.
- Announced the results of 127 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 82 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 71 packages that have not fully posted the contractor selection results. Of these 71 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.47 contractors.
- Breakdown by bidding field: Goods 23.21%, Construction 37.50%, Consultancy 39.29%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,499,591,924,227 VND, of which the total winning bid value is: 1,490,181,285,898 VND.
- The savings rate is: 0.63%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án as follows:
- Has relationships with 153 contractor.
- The average number of contractors participating in each bidding package is: 1.47 contractors.
- Proportion of bidding fields: Goods 23.21%, Construction 37.50%, Consulting 39.29%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,499,591,924,227 VND, in which the total winning value is: 1,490,181,285,898 VND.
- The savings rate is: 0.63%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban Quản lý dự án are as follows:
- Is the investor of 25 development investment projects.
- Is the investor of 73 contractor selection plans, of which 50 were self-published, and 23 were published by other entities.
- Is the investor of 89 Tender Notices, of which 56 were self-invited, and 33 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Ban Quản lý dự án publishes Tender Notice Construction and equipment installation in the form Open bidding .
22/08/2026 17:39
Ban Quản lý dự án announced the results of the bid package Consulting on the evaluation of bids for the "Consultancy and Supervision of Construction and Equipment Installation" package. .
- Winning bidder: Công ty Cổ phần Tư vấn Đầu tư và Xây dựng HN72
21/08/2026 16:04
Ban Quản lý dự án announced the results of the bid package Consulting on appraisal of bidding documents, LCNT results for construction and equipment installation bidding packages .
- Winning bidder: Công ty Cổ phần Tư vấn Đầu tư và Xây dựng HN72
21/08/2026 16:00
Ban Quản lý dự án announced the results of the bid package Consulting on tender preparation, evaluation of bids for consulting services, construction and equipment installation supervision. .
- Winning bidder: IPC VIET COMPANY LIMITED
21/08/2026 15:57
Ban Quản lý dự án announced the results of the bid package Consulting on making bidding doctors, evaluating Bid Bidding package for construction and installation of equipment .
- Winning bidder: IPC VIET COMPANY LIMITED
21/08/2026 15:53
Ban Quản lý dự án publishes the plan Procurement Plan, Phase 1, 2026: Project "Construction of the Science Research Center and Training Facility at the National University of Laos" with 7 bidding package .
18/08/2026 20:58
Ban Quản lý dự án publishes the plan Procurement Plan, Phase 1, 2026: Project "Construction of the Science Research Center and Training Facility at the National University of Laos" with 7 bidding package .
14/08/2026 16:37
Ban Quản lý dự án announced the results of the bid package Completed project audit .
- Winning bidder: RUBIK AUDITING FIRM COMPANY LIMITED
17/06/2026 16:01
Ban Quản lý dự án announced the results of the bid package Consulting on appraisal of bidding documents, contractor selection results Package "Topographic and geological survey, Preparation of feasibility study report, Application of BIM construction information model in project preparation phase" .
- Winning bidder: HAI PHONG CONSTRUCTION ARCHITECTURE CONSULTANT COMPANY LIMITED
07/05/2026 15:59
Ban Quản lý dự án announced the results of the bid package Consulting on preparing bidding documents, evaluating bid documents for the Package "Topographic and geological survey, Preparation of feasibility study report and Application of BIM construction information model in project preparation phase" .
- Winning bidder: HHP CONSTRUCTION BUILD CONSULTANT INVESTMENT JOINT STOCK COMPANY
07/05/2026 15:57
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án announced the results of the bid package Consulting on supervision of implementation (IT device component) .
- Winning bidder: Sazion Technology Joint stock Company
27/10/2025 15:52
Ban Quản lý dự án announced the results of the bid package Supply and installation of equipment .
- Winning bidder: FSI TECHNOLOGY DEVELOPMENT AND TRADING INVESTMENT JOINT STOCK COMPANY
24/10/2025 15:54
Ban Quản lý dự án announced the results of the bid package Equipment cost appraisal .
- Winning bidder: SMG VALUATION JOINT STOCK COMPANY
08/10/2025 14:10
Ban Quản lý dự án announced the results of the bid package Equipment cost appraisal .
- Winning bidder: SMG VALUATION JOINT STOCK COMPANY
03/10/2025 11:30
Ban Quản lý dự án announced the results of the bid package Pricing consultancy (IT device component) .
- Winning bidder: AN DUONG VALUATION AND INVESTMENT JOINT STOCK COMPANY
12/09/2025 14:48
Ban Quản lý dự án announced the results of the bid package Equipment cost appraisal .
- Winning bidder: AN DUONG VALUATION AND INVESTMENT JOINT STOCK COMPANY
12/09/2025 14:44
Ban Quản lý dự án announced the results of the bid package Shopping, installation of equipment (structure of science and technology equipment) .
- Winning bidder: VICTORY INSTRUMENT JOINT STOCK COMPANY, HOP LONG TECHNOLOGY JOINT STOCK COMPANY
27/08/2025 16:40
Ban Quản lý dự án announced the results of the bid package Design verification consultancy and implementation estimate after basic design .
- Winning bidder: CONINCO JOINT STOCK COMPANY FOR CONSTRUCTION AND ENVIRONTMENT TECHNOLOGY
13/08/2025 13:56
Ban Quản lý dự án announced the results of the bid package Monitoring and supervision consultancy and installation of equipment (Science and Technology components) .
- Winning bidder: Sazion Technology Joint stock Company
06/08/2025 15:06
Ban Quản lý dự án announced the results of the bid package Design consultancy and implementation after basic design .
- Winning bidder: CÔNG TY TNHH KIẾN TRÚC CÔNG TRÌNH, THUY MINH INVESTMENT CONSTRUCTION AND COMMERCIAL COMPANY LIMITED
23/07/2025 09:56
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án publishes Tender Notice Construction and equipment installation in the form Open bidding .
22/08/2026 17:39
Ban Quản lý dự án announced the results of the bid package Consulting on the evaluation of bids for the "Consultancy and Supervision of Construction and Equipment Installation" package. .
- Winning bidder: Công ty Cổ phần Tư vấn Đầu tư và Xây dựng HN72
21/08/2026 16:04
Ban Quản lý dự án announced the results of the bid package Consulting on appraisal of bidding documents, LCNT results for construction and equipment installation bidding packages .
- Winning bidder: Công ty Cổ phần Tư vấn Đầu tư và Xây dựng HN72
21/08/2026 16:00
Ban Quản lý dự án announced the results of the bid package Consulting on tender preparation, evaluation of bids for consulting services, construction and equipment installation supervision. .
- Winning bidder: IPC VIET COMPANY LIMITED
21/08/2026 15:57
Ban Quản lý dự án announced the results of the bid package Consulting on making bidding doctors, evaluating Bid Bidding package for construction and installation of equipment .
- Winning bidder: IPC VIET COMPANY LIMITED
21/08/2026 15:53
Ban Quản lý dự án publishes the plan Procurement Plan, Phase 1, 2026: Project "Construction of the Science Research Center and Training Facility at the National University of Laos" with 7 bidding package .
18/08/2026 20:58
Ban Quản lý dự án publishes the plan Procurement Plan, Phase 1, 2026: Project "Construction of the Science Research Center and Training Facility at the National University of Laos" with 7 bidding package .
14/08/2026 16:37
Ban Quản lý dự án announced the results of the bid package Completed project audit .
- Winning bidder: RUBIK AUDITING FIRM COMPANY LIMITED
17/06/2026 16:01
Ban Quản lý dự án announced the results of the bid package Consulting on appraisal of bidding documents, contractor selection results Package "Topographic and geological survey, Preparation of feasibility study report, Application of BIM construction information model in project preparation phase" .
- Winning bidder: HAI PHONG CONSTRUCTION ARCHITECTURE CONSULTANT COMPANY LIMITED
07/05/2026 15:59
Ban Quản lý dự án announced the results of the bid package Consulting on preparing bidding documents, evaluating bid documents for the Package "Topographic and geological survey, Preparation of feasibility study report and Application of BIM construction information model in project preparation phase" .
- Winning bidder: HHP CONSTRUCTION BUILD CONSULTANT INVESTMENT JOINT STOCK COMPANY
07/05/2026 15:57
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án has posted 52 of the contractor selection plan, which contains 194 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án has posted 56 Tender Notices in 48 bidding packages. Among these, 56 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án has posted 127 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 127 package, canceled the bid 0 package (among the bidding packages above).
- There are 82 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án has a relationship with 153 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án has a relationship with 35 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban Quản lý dự án has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects