Data analysis results of DauThau.info software for bid solicitors VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH as follows:
- Has relationships with 1 project owners.
- Has relationships with 15 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 8 contractor selection plans with a total of 22 bidding packages, of which 8 prequalification documents have not found the investment project.
- Has invited bids for 9 packages (with 9 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 12 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 3 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 7 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.22 contractors.
- Breakdown by bidding field: Goods 22.22%, Construction 11.11%, Consultancy 0%, Non-consultancy 66.67%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 24,124,952,895 VND, of which the total winning bid value is: 23,977,719,766 VND.
- The savings rate is: 0.61%.
Data analysis results of DauThau.info software for bid solicitors VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH as follows:
- Has relationships with 15 contractor.
- The average number of contractors participating in each bidding package is: 1.22 contractors.
- Proportion of bidding fields: Goods 22.22%, Construction 11.11%, Consulting 0%, Non-consulting 66.67%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 24,124,952,895 VND, in which the total winning value is: 23,977,719,766 VND.
- The savings rate is: 0.61%.
This Bid solicitor is also an investor. The analysis results of data for the investor VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 15 contractor selection plans, of which 8 were self-published, and 7 were published by other entities.
- Is the investor of 28 Tender Notices, of which 9 were self-invited, and 19 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package ENGLAND: Operation and maintenance management of Nghia Hung ship lock and national inland waterway channel of Nghia Hung canal in 2026 .
31/12/2025 14:06
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package ĐT.MB: Regulation and control work to ensure traffic safety in the MB area in 2026 .
31/12/2025 14:06
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package BTTXMB-01: Management and maintenance on national inland waterways (routes) in MB 01 region in 2026 .
- Winning bidder: INLAND WATERWAYS MANAGEMENT AND MAINTENANCE JOINT STOCK COMPANY N09
31/12/2025 14:05
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package BTTXMB-02: Management and maintenance on national inland waterways (routes) in the MB 02 region in 2026 .
- Winning bidder: NO. 6 INLAND WATERWAY MANAGEMENT JOINT STOCK COMPANY
31/12/2025 14:05
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package BTTXMB-03: Management and maintenance on national inland waterways (routes) in MB 03 region in 2026 .
- Winning bidder: INLAND WATERWAY MANAGEMENT JOINT STOCK COMPANY NO2
31/12/2025 14:04
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package BTTXMB-04: Management and maintenance on national inland waterways (routes) in the MB 04 region in 2026 .
- Winning bidder: HAIPHONG WATERWAY TRAFFIC ASSURANCE JOINT STOCK COMPANY
31/12/2025 14:04
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package BTTXMT-01: Management and maintenance on national inland waterways (routes) in MT area 01 in 2026 .
31/12/2025 14:03
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package BTTXMT-02: Management and maintenance on national inland waterways (routes) in MT area 02 in 2026 .
- Winning bidder: DA NANG BRIDGE AND ROAD JOINT STOCK COMPANY
31/12/2025 14:03
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH publishes Tender Notice ENGLAND: Operation and maintenance management of Nghia Hung ship lock and national inland waterway channel of Nghia Hung canal in 2026 in the form Open bidding .
11/12/2025 16:41
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH publishes Tender Notice ĐT.MB: Regulation and control work to ensure traffic safety in the MB area in 2026 in the form Open bidding .
11/12/2025 16:19
The data sheet has been partially hidden, to see the full information please Login or Register
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH publishes the plan The plan to select contractors of permanent bidding packages against lake - River Duong Cau - River; Trieu Duong - River Bridge; Railway bridge, Thi Cau - River Cau River, Flood and Storms in 2025 with 4 bidding package .
04/08/2025 16:39
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package CVTCC: Standing anti-output of the cluster of Cau Chuoc Km4+510-Km5+740 Hoang Mai River Hata, storms in 2025 .
- Winning bidder: Công ty TNHH Quang Mại
16/07/2025 16:33
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package CVTCLC: Standing anti -output of emotional bridge KM12+500 rivers in flood season, storms in 2025 .
- Winning bidder: HA TINH MANAGEMENT AND CONSTRUCTION TRAFFIC WORKS JOINT STOCK COMPANY
16/07/2025 16:32
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package CVTCYX: Permanent anti -output of Yen Xuan Bridge Km40+400 - Song Lam Hata, storms in 2025 .
- Winning bidder: NGHE AN MANAGEMENT & CONTRUCTION WATER WAYS-ROAD WORKS JOINT STOCK COMPANY
16/07/2025 16:32
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package CVTCCTTTTTT: Standing against hone drifting in the market cluster, Tho Tuong Km6+900 - Km7+00 River La Hata, storms in 2025 .
- Winning bidder: HA TINH MANAGEMENT AND CONSTRUCTION TRAFFIC WORKS JOINT STOCK COMPANY
16/07/2025 16:30
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bidding package CVTCLC: Standing anti -output of emotional bridge KM12+500 rivers in flood season, storms in 2025 with 1 participating contractors .
07/07/2025 10:09
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bidding package CVTCCTTTTTT: Standing against hone drifting in the market cluster, Tho Tuong Km6+900 - Km7+00 River La Hata, storms in 2025 with 1 participating contractors .
07/07/2025 10:09
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bidding package CVTCC: Standing anti-output of the cluster of Cau Chuoc Km4+510-Km5+740 Hoang Mai River Hata, storms in 2025 with 1 participating contractors .
07/07/2025 10:09
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bidding package CVTCYX: Permanent anti -output of Yen Xuan Bridge Km40+400 - Song Lam Hata, storms in 2025 with 1 participating contractors .
07/07/2025 10:09
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH publishes Tender Notice CVTCYX: Permanent anti -output of Yen Xuan Bridge Km40+400 - Song Lam Hata, storms in 2025 in the form Open bidding .
28/06/2025 17:51
The data sheet has been partially hidden, to see the full information please Login or Register
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package ENGLAND: Operation and maintenance management of Nghia Hung ship lock and national inland waterway channel of Nghia Hung canal in 2026 .
31/12/2025 14:06
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package ĐT.MB: Regulation and control work to ensure traffic safety in the MB area in 2026 .
31/12/2025 14:06
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package BTTXMB-01: Management and maintenance on national inland waterways (routes) in MB 01 region in 2026 .
- Winning bidder: INLAND WATERWAYS MANAGEMENT AND MAINTENANCE JOINT STOCK COMPANY N09
31/12/2025 14:05
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package BTTXMB-02: Management and maintenance on national inland waterways (routes) in the MB 02 region in 2026 .
- Winning bidder: NO. 6 INLAND WATERWAY MANAGEMENT JOINT STOCK COMPANY
31/12/2025 14:05
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package BTTXMB-03: Management and maintenance on national inland waterways (routes) in MB 03 region in 2026 .
- Winning bidder: INLAND WATERWAY MANAGEMENT JOINT STOCK COMPANY NO2
31/12/2025 14:04
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package BTTXMB-04: Management and maintenance on national inland waterways (routes) in the MB 04 region in 2026 .
- Winning bidder: HAIPHONG WATERWAY TRAFFIC ASSURANCE JOINT STOCK COMPANY
31/12/2025 14:04
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package BTTXMT-01: Management and maintenance on national inland waterways (routes) in MT area 01 in 2026 .
31/12/2025 14:03
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH announced the results of the bid package BTTXMT-02: Management and maintenance on national inland waterways (routes) in MT area 02 in 2026 .
- Winning bidder: DA NANG BRIDGE AND ROAD JOINT STOCK COMPANY
31/12/2025 14:03
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH publishes Tender Notice ENGLAND: Operation and maintenance management of Nghia Hung ship lock and national inland waterway channel of Nghia Hung canal in 2026 in the form Open bidding .
11/12/2025 16:41
VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH publishes Tender Notice ĐT.MB: Regulation and control work to ensure traffic safety in the MB area in 2026 in the form Open bidding .
11/12/2025 16:19
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH has posted 8 of the contractor selection plan, which contains 22 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH has posted 9 Tender Notices in 9 bidding packages. Among these, 9 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH has posted 12 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 12 package, canceled the bid 0 package (among the bidding packages above).
- There are 3 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH has a relationship with 15 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH has a relationship with 8 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity VIETNAM INLAND WATERWAY ADMINISTRATION NORTH BRANCH has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects