Data analysis results of DauThau.info software for bid solicitors LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY as follows:
- Has relationships with 1 project owners.
- Has relationships with 19 contractor.
- Announced 6 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 26 contractor selection plans with a total of 43 bidding packages, of which 20 prequalification documents have not found the investment project.
- Has invited bids for 5 packages (with 6 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 19 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 15 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 16 packages that have not fully posted the contractor selection results. Of these 15 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.33 contractors.
- Breakdown by bidding field: Goods 16.67%, Construction 50.00%, Consultancy 33.33%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 61,536,860,355 VND, of which the total winning bid value is: 60,896,431,414 VND.
- The savings rate is: 1.04%.
Data analysis results of DauThau.info software for bid solicitors LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY as follows:
- Has relationships with 19 contractor.
- The average number of contractors participating in each bidding package is: 1.33 contractors.
- Proportion of bidding fields: Goods 16.67%, Construction 50.00%, Consulting 33.33%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 61,536,860,355 VND, in which the total winning value is: 60,896,431,414 VND.
- The savings rate is: 1.04%.
This Bid solicitor is also an investor. The analysis results of data for the investor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY are as follows:
- Is the investor of 6 development investment projects.
- Is the investor of 26 contractor selection plans, of which 22 were self-published, and 4 were published by other entities.
- Is the investor of 3 Tender Notices, of which 3 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 0 bidding packages.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY publishes the plan Survey, prepare construction drawing design documents and estimates; Prepare economic and technical report on fire protection system for Berth No. 1, Berth No. 2 of Vung Ang Port with 1 bidding package .
11/11/2025 13:48
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY announced the results of the bid package Provide 08 panels in cushion and ships of SPC 1150 .
- Winning bidder: HAI PHONG RUBBER JOINT STOCK COMPANY
04/09/2025 08:14
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY publishes the plan Provide 08 panels in cushion and ships of SPC 1150 with 1 bidding package .
26/08/2025 09:26
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY announced the results of the bid package Package No. 02: Supervision of construction and repair of wharf girder Ben No. 1 Vung Ang Port .
- Winning bidder: CONSTRUCTION CONSULANTCY AND INSPECTION JOINT STOCK COMPANY
18/07/2025 08:37
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY announced the results of the bid package Package No. 01: Construction and repair of wharf girder Ben No. 1 Vung Ang Port .
- Winning bidder: CONSTREXIM NO 8 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY
18/07/2025 08:32
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY publishes the plan Repair of wharf girder Ben No. 1 Vung Ang Port with 2 bidding package .
07/07/2025 14:34
The Bid solicitor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY has posted the results of the bidding package Bidding package 03: Consulting on quality accreditation of structural structure after repair of the investor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY.
- Winning bidder: CONSTRUCTION CONSULANTCY AND INSPECTION JOINT STOCK COMPANY
07/07/2025 11:14
The Bid solicitor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY has posted the results of the bidding package Repair on the momentum of Vung Tau 05 intermediaries of the investor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN ĐÓNG TÀU THUYỀN HẢI CHÂU
23/06/2025 14:57
The Bid solicitor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY has posted the results of the bidding package Package No. 02: Consulting on supervision of construction and repair of beams, wharf versions between segment 4 and segment 5 wharf 2 Vung Ang port due to collision ship incident of the investor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY.
- Winning bidder: CONSTRUCTION CONSULANTCY AND INSPECTION JOINT STOCK COMPANY
23/06/2025 13:59
The Bid solicitor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY has posted the results of the bidding package Package No. 01: Construction and repair of beams and wharfs between segment 4
and segment 5 wharf 2 Vung Ang port due to collision ship incident of the investor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY.
- Winning bidder: CONSTREXIM NO 8 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY
23/06/2025 13:55
The data sheet has been partially hidden, to see the full information please Login or Register
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY announced the results of the bid package Bidding package 03: Consulting on quality accreditation of structural structure after repair .
- Winning bidder: CONSTRUCTION CONSULANTCY AND INSPECTION JOINT STOCK COMPANY
07/07/2025 11:14
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY announced the results of the bid package Repair on the momentum of Vung Tau 05 intermediaries .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN ĐÓNG TÀU THUYỀN HẢI CHÂU
23/06/2025 14:57
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY announced the results of the bid package Package No. 02: Consulting on supervision of construction and repair of beams, wharf versions between segment 4 and segment 5 wharf 2 Vung Ang port due to collision ship incident .
- Winning bidder: CONSTRUCTION CONSULANTCY AND INSPECTION JOINT STOCK COMPANY
23/06/2025 13:59
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY announced the results of the bid package Package No. 01: Construction and repair of beams and wharfs between segment 4
and segment 5 wharf 2 Vung Ang port due to collision ship incident .
- Winning bidder: CONSTREXIM NO 8 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY
23/06/2025 13:55
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY publishes the plan Repair on the momentum of Vung Tau 05 intermediaries with 1 bidding package .
19/06/2025 07:47
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY announced the results of the bid package Design consultancy and approval of fire prevention and fighting system design at wharf 1, wharf 2 - Vung Ang port .
- Winning bidder: PORT AND WATERWAY ENGINEERING CONSULTANT JOINT STOCK COMPANY, AN PHAT METAL MATERIALS AND BUILD COMPANY LIMITED
16/06/2025 15:13
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY publishes the plan Repairing beams and wharfs between segment 4 and segment 5 wharf 2 Vung Ang port due to collision ship incident with 3 bidding package .
11/06/2025 10:16
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY publishes the plan Repairing beams and wharfs between segment 4 and segment 5 wharf 2 Vung Ang port due to collision ship incident with 3 bidding package .
11/06/2025 10:14
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY announced the results of the bid package Survey consultancy, design and construction plan for repairing and making estimates for repairing wharf beams Ben No. 1 Vung Ang Port .
- Winning bidder: CONSTRUCTION CONSULANTCY AND INSPECTION JOINT STOCK COMPANY
03/06/2025 14:59
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY publishes the plan Survey consultancy, design and construction plan for repairing and making estimates for repairing wharf beams Ben No. 1 Vung Ang Port with 1 bidding package .
20/05/2025 14:07
The data sheet has been partially hidden, to see the full information please Login or Register
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY publishes the plan Survey, prepare construction drawing design documents and estimates; Prepare economic and technical report on fire protection system for Berth No. 1, Berth No. 2 of Vung Ang Port with 1 bidding package .
11/11/2025 13:48
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY announced the results of the bid package Provide 08 panels in cushion and ships of SPC 1150 .
- Winning bidder: HAI PHONG RUBBER JOINT STOCK COMPANY
04/09/2025 08:14
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY publishes the plan Provide 08 panels in cushion and ships of SPC 1150 with 1 bidding package .
26/08/2025 09:26
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY announced the results of the bid package Package No. 02: Supervision of construction and repair of wharf girder Ben No. 1 Vung Ang Port .
- Winning bidder: CONSTRUCTION CONSULANTCY AND INSPECTION JOINT STOCK COMPANY
18/07/2025 08:37
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY announced the results of the bid package Package No. 01: Construction and repair of wharf girder Ben No. 1 Vung Ang Port .
- Winning bidder: CONSTREXIM NO 8 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY
18/07/2025 08:32
LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY publishes the plan Repair of wharf girder Ben No. 1 Vung Ang Port with 2 bidding package .
07/07/2025 14:34
The Bid solicitor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY has posted the results of the bidding package Bidding package 03: Consulting on quality accreditation of structural structure after repair of the investor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY.
- Winning bidder: CONSTRUCTION CONSULANTCY AND INSPECTION JOINT STOCK COMPANY
07/07/2025 11:14
The Bid solicitor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY has posted the results of the bidding package Repair on the momentum of Vung Tau 05 intermediaries of the investor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN ĐÓNG TÀU THUYỀN HẢI CHÂU
23/06/2025 14:57
The Bid solicitor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY has posted the results of the bidding package Package No. 02: Consulting on supervision of construction and repair of beams, wharf versions between segment 4 and segment 5 wharf 2 Vung Ang port due to collision ship incident of the investor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY.
- Winning bidder: CONSTRUCTION CONSULANTCY AND INSPECTION JOINT STOCK COMPANY
23/06/2025 13:59
The Bid solicitor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY has posted the results of the bidding package Package No. 01: Construction and repair of beams and wharfs between segment 4
and segment 5 wharf 2 Vung Ang port due to collision ship incident of the investor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY.
- Winning bidder: CONSTREXIM NO 8 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY
23/06/2025 13:55
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY has posted 26 of the contractor selection plan, which contains 43 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY has posted 6 Tender Notices in 5 bidding packages. Among these, 1 Tender Notices were self-invited, and 5 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY has posted 19 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 19 package, canceled the bid 0 package (among the bidding packages above).
- There are 15 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY has a relationship with 19 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY has a relationship with 8 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity LAO - VIET INTERNATIONAL PORT JOINT STOCK COMPANY has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects