Data analysis results of DauThau.info software for bid solicitors Công ty Điện lực Long An as follows:
- Has relationships with 5 project owners.
- Has relationships with 345 contractor.
- Announced 249 investment development project, of which 56 projects have not yet announced the prequalification documents.
- Announced 694 contractor selection plans with a total of 1048 bidding packages, of which 235 prequalification documents have not found the investment project.
- Has invited bids for 827 packages (with 840 tender notices), and conducted prequalification for 0 packages.
- There are 23 bidding packages with content that needs clarification.
- Announced the results of 616 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 183 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 429 packages that have not fully posted the contractor selection results. Of these 337 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.40 contractors.
- Breakdown by bidding field: Goods 41.90%, Construction 37.86%, Consultancy 17.74%, Non-consultancy 2.14%, Mixed 0%, Other fields 0.36%.
- The total value according to the packages with valid contractor selection results is: 1,369,826,534,376 VND, of which the total winning bid value is: 1,207,183,165,164 VND.
- The savings rate is: 11.87%.
Data analysis results of DauThau.info software for bid solicitors Công ty Điện lực Long An as follows:
- Has relationships with 345 contractor.
- The average number of contractors participating in each bidding package is: 2.40 contractors.
- Proportion of bidding fields: Goods 41.90%, Construction 37.86%, Consulting 17.74%, Non-consulting 2.14%, Mixed 0%, Other 0.36%.
- The total value according to the bidding package with valid IMP is: 1,369,826,534,376 VND, in which the total winning value is: 1,207,183,165,164 VND.
- The savings rate is: 11.87%.
This Bid solicitor is also an investor. The analysis results of data for the investor Công ty Điện lực Long An are as follows:
- Is the investor of 249 development investment projects.
- Is the investor of 674 contractor selection plans, of which 664 were self-published, and 10 were published by other entities.
- Is the investor of 524 Tender Notices, of which 514 were self-invited, and 10 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Công ty Điện lực Long An has posted the request Project: Investing in optical cable system connecting relay under Project 100 of the investor Công ty Điện lực Long An with 1 bidding package.
02/07/2025 07:41
The Bid solicitor Công ty Điện lực Long An has posted the request Bidding package: Consulting on supervision of construction and installation of equipment and equipment, projects: The investment projects for construction of 110kV power grids of the investor Công ty Điện lực Long An with 1 bidding package.
24/06/2025 21:27
The Bid solicitor Công ty Điện lực Long An has posted the request Bidding package: Auditing consultancy for completed project settlement, project: Electricity construction investment works 110kV of the investor Công ty Điện lực Long An with 1 bidding package.
24/06/2025 21:22
The Bid solicitor Công ty Điện lực Long An has posted the request Project consultancy planning plan: Electrical technical infrastructure construction works (power grid operator) of Long An Power Company of the investor Công ty Điện lực Long An with 5 bidding package.
21/06/2025 09:14
The Bid solicitor Công ty Điện lực Long An has posted the request Replace relay TBA 110kV An Thanh, Duc Hue, Moc Hoa, Long An of the investor Công ty Điện lực Long An with 2 bidding package.
19/06/2025 16:48
The Bid solicitor Công ty Điện lực Long An has posted the request Bidding package: Auditing consultancy for completed project settlement; Project: Construction investment works in 2025 (17 works) of the investor Công ty Điện lực Long An with 1 bidding package.
12/06/2025 21:49
The Bid solicitor Công ty Điện lực Long An has posted the request Project: Replace the RTU-Main cabinet of 110kV Moc Hoa, Thanh Hoa, Ben Lap, Duc Lap of the investor Công ty Điện lực Long An with 2 bidding package.
12/06/2025 21:45
The Bid solicitor Công ty Điện lực Long An has posted the request Project: Renovating and upgrading 110kV Thanh Hoa, Vinh Hung, Can Giuoc, Thu Thua and 110kV Tan Thanh Cutting Station of the investor Công ty Điện lực Long An with 1 bidding package.
12/06/2025 21:35
The Bid solicitor Công ty Điện lực Long An has posted the request Project: Fix shortcomings on fire prevention and fighting station 110kV Vinh Hung; Moc Hoa; Thanh Hoa; Can Duoc; Duc Hue; Duc Lap; Duc Hoa; An Thanh; Tan An; Army of the investor Công ty Điện lực Long An with 2 bidding package.
12/06/2025 21:27
The Bid solicitor Công ty Điện lực Long An has posted the request Equipped with relays comply with the regulations of distribution systems at 110kV Moc Hoa, An Thanh, Thanh Hoa, Long Hau, Thu Thua, Can Giuoc, Ben Luc, Long An, Long Hiep, Rach Chanh, Tam Vu, Tan An, Duc Hoa 3, Tan Tap, Vinh Hung, Binh Tien under Project 100 of the investor Công ty Điện lực Long An with 2 bidding package.
10/06/2025 11:06
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty Điện lực Long An publishes the plan Project: Investing in optical cable system connecting relay under Project 100 with 1 bidding package .
02/07/2025 07:41
Công ty Điện lực Long An publishes the plan Bidding package: Consulting on supervision of construction and installation of equipment and equipment, projects: The investment projects for construction of 110kV power grids with 1 bidding package .
24/06/2025 21:27
Công ty Điện lực Long An publishes the plan Bidding package: Auditing consultancy for completed project settlement, project: Electricity construction investment works 110kV with 1 bidding package .
24/06/2025 21:22
Công ty Điện lực Long An publishes the plan Project consultancy planning plan: Electrical technical infrastructure construction works (power grid operator) of Long An Power Company with 5 bidding package .
21/06/2025 09:14
Công ty Điện lực Long An publishes the plan Replace relay TBA 110kV An Thanh, Duc Hue, Moc Hoa, Long An with 2 bidding package .
19/06/2025 16:48
Công ty Điện lực Long An publishes the plan Bidding package: Auditing consultancy for completed project settlement; Project: Construction investment works in 2025 (17 works) with 1 bidding package .
12/06/2025 21:49
Công ty Điện lực Long An publishes the plan Project: Replace the RTU-Main cabinet of 110kV Moc Hoa, Thanh Hoa, Ben Lap, Duc Lap with 2 bidding package .
12/06/2025 21:45
Công ty Điện lực Long An publishes the plan Project: Renovating and upgrading 110kV Thanh Hoa, Vinh Hung, Can Giuoc, Thu Thua and 110kV Tan Thanh Cutting Station with 1 bidding package .
12/06/2025 21:35
Công ty Điện lực Long An publishes the plan Project: Fix shortcomings on fire prevention and fighting station 110kV Vinh Hung; Moc Hoa; Thanh Hoa; Can Duoc; Duc Hue; Duc Lap; Duc Hoa; An Thanh; Tan An; Army with 2 bidding package .
12/06/2025 21:27
Công ty Điện lực Long An publishes the plan Equipped with relays comply with the regulations of distribution systems at 110kV Moc Hoa, An Thanh, Thanh Hoa, Long Hau, Thu Thua, Can Giuoc, Ben Luc, Long An, Long Hiep, Rach Chanh, Tam Vu, Tan An, Duc Hoa 3, Tan Tap, Vinh Hung, Binh Tien under Project 100 with 2 bidding package .
10/06/2025 11:06
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Công ty Điện lực Long An has posted the request Project: Investing in optical cable system connecting relay under Project 100 of the investor Công ty Điện lực Long An with 1 bidding package.
02/07/2025 07:41
The Bid solicitor Công ty Điện lực Long An has posted the request Bidding package: Consulting on supervision of construction and installation of equipment and equipment, projects: The investment projects for construction of 110kV power grids of the investor Công ty Điện lực Long An with 1 bidding package.
24/06/2025 21:27
The Bid solicitor Công ty Điện lực Long An has posted the request Bidding package: Auditing consultancy for completed project settlement, project: Electricity construction investment works 110kV of the investor Công ty Điện lực Long An with 1 bidding package.
24/06/2025 21:22
The Bid solicitor Công ty Điện lực Long An has posted the request Project consultancy planning plan: Electrical technical infrastructure construction works (power grid operator) of Long An Power Company of the investor Công ty Điện lực Long An with 5 bidding package.
21/06/2025 09:14
The Bid solicitor Công ty Điện lực Long An has posted the request Replace relay TBA 110kV An Thanh, Duc Hue, Moc Hoa, Long An of the investor Công ty Điện lực Long An with 2 bidding package.
19/06/2025 16:48
The Bid solicitor Công ty Điện lực Long An has posted the request Bidding package: Auditing consultancy for completed project settlement; Project: Construction investment works in 2025 (17 works) of the investor Công ty Điện lực Long An with 1 bidding package.
12/06/2025 21:49
The Bid solicitor Công ty Điện lực Long An has posted the request Project: Replace the RTU-Main cabinet of 110kV Moc Hoa, Thanh Hoa, Ben Lap, Duc Lap of the investor Công ty Điện lực Long An with 2 bidding package.
12/06/2025 21:45
The Bid solicitor Công ty Điện lực Long An has posted the request Project: Renovating and upgrading 110kV Thanh Hoa, Vinh Hung, Can Giuoc, Thu Thua and 110kV Tan Thanh Cutting Station of the investor Công ty Điện lực Long An with 1 bidding package.
12/06/2025 21:35
The Bid solicitor Công ty Điện lực Long An has posted the request Project: Fix shortcomings on fire prevention and fighting station 110kV Vinh Hung; Moc Hoa; Thanh Hoa; Can Duoc; Duc Hue; Duc Lap; Duc Hoa; An Thanh; Tan An; Army of the investor Công ty Điện lực Long An with 2 bidding package.
12/06/2025 21:27
The Bid solicitor Công ty Điện lực Long An has posted the request Equipped with relays comply with the regulations of distribution systems at 110kV Moc Hoa, An Thanh, Thanh Hoa, Long Hau, Thu Thua, Can Giuoc, Ben Luc, Long An, Long Hiep, Rach Chanh, Tam Vu, Tan An, Duc Hoa 3, Tan Tap, Vinh Hung, Binh Tien under Project 100 of the investor Công ty Điện lực Long An with 2 bidding package.
10/06/2025 11:06
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Công ty Điện lực Long An has posted 694 of the contractor selection plan, which contains 1048 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Công ty Điện lực Long An has posted 840 Tender Notices in 827 bidding packages. Among these, 426 Tender Notices were self-invited, and 414 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Công ty Điện lực Long An has posted 616 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 616 package, canceled the bid 0 package (among the bidding packages above).
- There are 183 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Công ty Điện lực Long An has a relationship with 345 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Công ty Điện lực Long An has a relationship with 19 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Công ty Điện lực Long An has a relationship with 6 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects