Data analysis results of DauThau.info software for bid solicitors Công ty Điện lực Sóc Sơn as follows:
- Has relationships with 1 project owners.
- Has relationships with 204 contractor.
- Announced 92 investment development project, of which 11 projects have not yet announced the prequalification documents.
- Announced 377 contractor selection plans with a total of 553 bidding packages, of which 126 prequalification documents have not found the investment project.
- Has invited bids for 133 packages (with 174 tender notices), and conducted prequalification for 0 packages.
- There are 3 bidding packages with content that needs clarification.
- Announced the results of 296 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 183 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 232 packages that have not fully posted the contractor selection results. Of these 215 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.07 contractors.
- Breakdown by bidding field: Goods 35.06%, Construction 30.46%, Consultancy 32.18%, Non-consultancy 2.30%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 524,750,311,458 VND, of which the total winning bid value is: 506,890,507,163 VND.
- The savings rate is: 3.40%.
Data analysis results of DauThau.info software for bid solicitors Công ty Điện lực Sóc Sơn as follows:
- Has relationships with 204 contractor.
- The average number of contractors participating in each bidding package is: 2.07 contractors.
- Proportion of bidding fields: Goods 35.06%, Construction 30.46%, Consulting 32.18%, Non-consulting 2.30%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 524,750,311,458 VND, in which the total winning value is: 506,890,507,163 VND.
- The savings rate is: 3.40%.
This Bid solicitor is also an investor. The analysis results of data for the investor Công ty Điện lực Sóc Sơn are as follows:
- Is the investor of 92 development investment projects.
- Is the investor of 405 contractor selection plans, of which 376 were self-published, and 29 were published by other entities.
- Is the investor of 229 Tender Notices, of which 171 were self-invited, and 58 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Công ty Điện lực Sóc Sơn publishes the plan Contractor selection plan Package 03.MSHH.2025: Procurement of tea sets as gifts to thank customers in 2025 with 1 bidding package .
18/12/2025 18:37
Công ty Điện lực Sóc Sơn publishes the plan Purchasing materials to serve production and business activities in the third phase of 2025 with 1 bidding package .
15/12/2025 19:16
Công ty Điện lực Sóc Sơn publishes the plan The plan to select the contractor to compile the supplies package of the projects: (1) Upgrading the voltage grid of Phu Ha 1, Phu Ha 2, Minh Phu 2, Minh Phu 2, Phu Kim 1, Phu Kim 1, Phu Kim 2, Phu Cuong 2, Thanh Tri 4; (2) Improving low -voltage grid Hien Ninh commune; (3) Renovating and upgrading lower -voltage grid Tan Dan commune; (4) Upgrading the low -voltage grid of Trung Gia commune; (5) Upgrading the low -voltage grid of Viet Long commune with 1 bidding package .
12/12/2025 09:03
Công ty Điện lực Sóc Sơn publishes the plan Contractor selection plan Project: Renovating telecommunications cables and ensuring safety against fire spread on electric poles in Soc Son commune, Noi Bai commune, Da Phuc commune, Hanoi city in 2025 with 1 bidding package .
20/11/2025 13:11
Công ty Điện lực Sóc Sơn publishes the plan Contractor selection plan Belongs to the procurement estimate: Procurement of VTTB to serve production and business activities with 7 bidding package .
17/11/2025 16:43
Công ty Điện lực Sóc Sơn publishes the plan Contractor selection plan Package No. 15.XL.SCL.2025: Construction and installation of additional SCL projects in 2025 Belonging to the following projects:
1. Overhauling RMU cabinets does not ensure operation of Soc Son Power Company in 2025
2. Overhauling low voltage cabinets does not ensure operation of Soc Son Power Company in 2025
3. Overhaul of old Pillar cabinets at Mai Dinh Resettlement area with 1 bidding package .
14/11/2025 16:46
Công ty Điện lực Sóc Sơn publishes the plan Contractor selection plan Project: Overhauling the old Pillar cabinet at Mai Dinh Resettlement area with 2 bidding package .
14/11/2025 16:36
Công ty Điện lực Sóc Sơn publishes the plan Contractor selection plan Project: Overhaul of low voltage cabinets does not ensure operation of Soc Son Power Company in 2025 with 2 bidding package .
14/11/2025 16:26
Công ty Điện lực Sóc Sơn publishes the plan Plan to select contractor for RMU cabinet overhaul project does not ensure operation of Soc Son Power Company in 2025 with 3 bidding package .
14/11/2025 16:10
Công ty Điện lực Sóc Sơn publishes the plan Combine procurement packages for goods belonging to the following projects:
- Overhauling low voltage cabinets does not ensure operation of Soc Son Power Company in 2025;
- Overhaul of old Pillar cabinets at Mai Dinh Resettlement Area;
- Overhauling RMU cabinets does not ensure operation of Soc Son Power Company in 2025 with 1 bidding package .
14/11/2025 12:00
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty Điện lực Sóc Sơn publishes the plan Bidding selection plan package 13.2025.MSHH Buying equipment and equipment for construction construction works in 2025 - Package 02 with 1 bidding package .
19/08/2025 09:09
Công ty Điện lực Sóc Sơn publishes the plan Bidding selection plan package 13.2025.MSHH Buying equipment and equipment for construction construction works in 2025 - Package 02 with 1 bidding package .
30/06/2025 15:12
Công ty Điện lực Sóc Sơn publishes the plan Plan for selecting project contractors: "Upgrading low -voltage grids of Phu Ha 1, Phu Ha 2, Minh Phu 2, Minh Phu 4, Phu Kim 1, Phu Kim 2, Phu Cuong 2, Thanh Tri 4" with 4 bidding package .
19/06/2025 09:00
Công ty Điện lực Sóc Sơn publishes the plan Project contractor selection plan: "Install additional medium -voltage lines in 2025" with 2 bidding package .
19/06/2025 08:57
Công ty Điện lực Sóc Sơn publishes the plan Plan for project contractor selection: "Renovating axial road and branching of medium voltage lines supplying electricity in the western area of Soc Son district" with 4 bidding package .
19/06/2025 08:54
Công ty Điện lực Sóc Sơn publishes the plan Project contractor selection plan: "Improving the Trung Voltage grid 475E1.19 and renovating and installing lightning protection wires for the road 472E1.19" with 4 bidding package .
19/06/2025 08:43
Công ty Điện lực Sóc Sơn publishes the plan Project contractor selection plan: "Renovating and upgrading branches of the medium voltage line 475E1.23" with 4 bidding package .
19/06/2025 08:34
Công ty Điện lực Sóc Sơn publishes the plan The plan to select the contractor to compile the supplies package of the projects: (1) Upgrading the voltage grid of Phu Ha 1, Phu Ha 2, Minh Phu 2, Minh Phu 2, Phu Kim 1, Phu Kim 1, Phu Kim 2, Phu Cuong 2, Thanh Tri 4; (2) Improving low -voltage grid Hien Ninh commune; (3) Renovating and upgrading lower -voltage grid Tan Dan commune; (4) Upgrading the low -voltage grid of Trung Gia commune; (5) Upgrading the low -voltage grid of Viet Long commune with 1 bidding package .
18/06/2025 15:32
Công ty Điện lực Sóc Sơn publishes the plan Plan for project contractor selection: "Installing lightning cords for medium -voltage lines in Soc Son district" with 3 bidding package .
16/06/2025 11:38
Công ty Điện lực Sóc Sơn publishes the plan Project contractor selection plan: "Install additional medium -voltage lines in 2025" with 2 bidding package .
16/06/2025 11:29
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty Điện lực Sóc Sơn publishes the plan Contractor selection plan Package 03.MSHH.2025: Procurement of tea sets as gifts to thank customers in 2025 with 1 bidding package .
18/12/2025 18:37
Công ty Điện lực Sóc Sơn publishes the plan Purchasing materials to serve production and business activities in the third phase of 2025 with 1 bidding package .
15/12/2025 19:16
Công ty Điện lực Sóc Sơn publishes the plan The plan to select the contractor to compile the supplies package of the projects: (1) Upgrading the voltage grid of Phu Ha 1, Phu Ha 2, Minh Phu 2, Minh Phu 2, Phu Kim 1, Phu Kim 1, Phu Kim 2, Phu Cuong 2, Thanh Tri 4; (2) Improving low -voltage grid Hien Ninh commune; (3) Renovating and upgrading lower -voltage grid Tan Dan commune; (4) Upgrading the low -voltage grid of Trung Gia commune; (5) Upgrading the low -voltage grid of Viet Long commune with 1 bidding package .
12/12/2025 09:03
Công ty Điện lực Sóc Sơn publishes the plan Contractor selection plan Project: Renovating telecommunications cables and ensuring safety against fire spread on electric poles in Soc Son commune, Noi Bai commune, Da Phuc commune, Hanoi city in 2025 with 1 bidding package .
20/11/2025 13:11
Công ty Điện lực Sóc Sơn publishes the plan Contractor selection plan Belongs to the procurement estimate: Procurement of VTTB to serve production and business activities with 7 bidding package .
17/11/2025 16:43
Công ty Điện lực Sóc Sơn publishes the plan Contractor selection plan Package No. 15.XL.SCL.2025: Construction and installation of additional SCL projects in 2025 Belonging to the following projects:
1. Overhauling RMU cabinets does not ensure operation of Soc Son Power Company in 2025
2. Overhauling low voltage cabinets does not ensure operation of Soc Son Power Company in 2025
3. Overhaul of old Pillar cabinets at Mai Dinh Resettlement area with 1 bidding package .
14/11/2025 16:46
Công ty Điện lực Sóc Sơn publishes the plan Contractor selection plan Project: Overhauling the old Pillar cabinet at Mai Dinh Resettlement area with 2 bidding package .
14/11/2025 16:36
Công ty Điện lực Sóc Sơn publishes the plan Contractor selection plan Project: Overhaul of low voltage cabinets does not ensure operation of Soc Son Power Company in 2025 with 2 bidding package .
14/11/2025 16:26
Công ty Điện lực Sóc Sơn publishes the plan Plan to select contractor for RMU cabinet overhaul project does not ensure operation of Soc Son Power Company in 2025 with 3 bidding package .
14/11/2025 16:10
Công ty Điện lực Sóc Sơn publishes the plan Combine procurement packages for goods belonging to the following projects:
- Overhauling low voltage cabinets does not ensure operation of Soc Son Power Company in 2025;
- Overhaul of old Pillar cabinets at Mai Dinh Resettlement Area;
- Overhauling RMU cabinets does not ensure operation of Soc Son Power Company in 2025 with 1 bidding package .
14/11/2025 12:00
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Công ty Điện lực Sóc Sơn has posted 377 of the contractor selection plan, which contains 553 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Công ty Điện lực Sóc Sơn has posted 174 Tender Notices in 133 bidding packages. Among these, 172 Tender Notices were self-invited, and 2 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Công ty Điện lực Sóc Sơn has posted 296 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 296 package, canceled the bid 0 package (among the bidding packages above).
- There are 183 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Công ty Điện lực Sóc Sơn has a relationship with 204 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Công ty Điện lực Sóc Sơn has a relationship with 10 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Công ty Điện lực Sóc Sơn has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects